101672-9110 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016729110 ewv9004


 

Information injection-pump assembly

ZEXEL 101672-9110 1016729110
  EWV9004
101672-9110 INJECTION-PUMP ASSEMBLY
Rating:
32
Buy INJECTION-PUMP ASSEMBLY 101672-9110 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101672-9110 
 
EWV9004   
INJECTION-PUMP ASSEMBLY
* K




Information:

Illustration 21 shows the direction the rack moves when the fuel injector is receiving fuel.
Illustration 22 g01455811
Illustration 1 - Flowchart for the Air in Fuel Test (Test F)
Illustration 23 g01455812
Illustration 2 - Flowchart for the Air in Fuel Test (Test F)Fuel Injector Cranking Test (Test G)
Note: The fuel injector cranking test checks for worn out injectors by measuring the cranking rack.
Illustration 24 g01412134
(3) The rack control (4) The number one fuel injectorNote: Refer to Illustration 24 for the location of the rack control and the location of the number one injector.
Illustration 25 g01412115
Flowchart for the Fuel Injector Cranking Test (Test G)Fuel Shutoff Solenoid Test (Test H)
Note: The fuel shutoff solenoid test determines if the fuel shutoff solenoid and wiring harness are operating properly.
Illustration 26 g01412143
Flowchart for the Fuel Shutoff Solenoid Test (Test H)Fuel Ratio Control (FRC) Setting Test (Test I)
Note: The FRC setting test checks the FRC setting.
Illustration 27 g01412145
Flowchart for the Fuel Ratio Control (FRC) Setting Test (Test I)Governor Servo Retaining Ring Test (Test J)
Note: Do not run the engine during this test.Note: The governor servo retaining ring test checks for faulty internal parts of the governor.
Illustration 28 g01422811
(1) Paddle
Illustration 29 g01422821
(2) Clevis pin
Illustration 30 g01412147
Flowchart for the Governor Servo Retaining Ring Test (Test J)Fuel Transfer Pump Test (Test K)
Note: The fuel transfer pump test is a visual inspection of the fuel transfer pump components.
Illustration 31 g01412150
(1) Screen (2) Inlet check valve (3) Spring (4) Bolt (5) Piston (6) Outlet check valve (7) Freeze plug (8) Piston check valve (9) Passage (10) Tappet Assembly (11) CamNote: Refer to Illustration 31 for the location of the components for the fuel transfer pump.
Illustration 32 g01412149
Flowchart for the Fuel Transfer Pump Test (Test K)Fuel Ratio Control (FRC) Diaphragm Leak Test (Test L)
Note: The FRC diaphragm leak test checks for a leaking FRC diaphragm.
Illustration 33 g01412154
Flowchart for the Fuel Ratio Control (FRC) Diaphragm Leak Test (Test L)

Have questions with 101672-9110?





Group cross 101672-9110 ZEXEL

 
EWV9000 
INJECTION-PUMP ASSEMBLY
101672-9110  
 
EWV9004 
INJECTION-PUMP ASSEMBLY
 
EWV9002 
INJECTION-PUMP ASSEMBLY
 
EWV9006 
INJECTION-PUMP ASSEMBLY

Daihatsu 

 
M101500110Z 
INJECTION-PUMP ASSEMBLY
M1T
 
M101500120Z 
INJECTION-PUMP ASSEMBLY
M1
 
 
INJECTION-PUMP ASSEMBLY
695
9 400 615 957 
 
INJECTION-PUMP ASSEMBLY
ZB
Back to top