101670-9020 ZEXEL 9 400 615 943 BOSCH INJECTION-PUMP ASSEMBLY 9400615943 1016709020 1671795007


 

Information injection-pump assembly

BOSCH 9 400 615 943 9400615943
ZEXEL 101670-9020 1016709020
NISSAN-DIESEL 1671795007 1671795007
101670-9020 INJECTION-PUMP ASSEMBLY
Rating:
12
Buy INJECTION-PUMP ASSEMBLY 101670-9020 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

Cross reference number

BOSCH 9 400 615 943 9400615943
ZEXEL 101670-9020 1016709020
NISSAN-DIESEL 1671795007 1671795007


Zexel num
Bosch num
Firm num
Name
101670-9020 
9 400 615 943 
1671795007  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
ND6 * K 14BE INJECTION PUMP ASSY PE6A PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle   105015-2770
Bosch type code   DLLA169S304NP5
Nozzle holder   105031-4130
Opening pressure MPa   17.7
Opening pressure kgf/cm2   180
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-1.6-410
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   2.5 2.45 2.55
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   12
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   64 62 66
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   8
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   9 7.8 10.2
Max. variation between cylinders %   0 -13 13
Fixing the rack   *
Injection quantity adjustment_03
Remarks
Rack limit setting R = 14.4+-0.1
 
Timer adjustment
Pump speed r/min   300+-50
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   600
Advance angle deg.   1.3 0.9 1.7
Timer adjustment_03
Pump speed r/min   1000
Advance angle deg.   3.5 3 4
Timer adjustment_04
Pump speed r/min   1400
Advance angle deg.   6.1 5.7 6.5
Remarks
Finish
 




Information:

3. Install dowel (5) in governor shaft (6). Install the governor shaft in the carrier as shown. 4. Put the carrier in position on the camshaft. Install the bolts that hold the carrier in place.
Replace shield (7) with a new part any time it is removed.
5. Install shield (7) on the carrier, and use Tool (A) to push the shield against its seat. Use a hammer and punch to stake the metal in two places on the side of the shield 180° 5° apart next to the holes in the shield. 6. Install one race (9), bearing (10), the other race (9), and use Tool (B) to install the ring on riser (8) as shown. 7. Install riser (8) and the spring (overfueling spring) on the governor shaft as shown. 8. Assemble the dashpot as follows:a. Install spring (12) on seat (11). Install seat (13) in spring (12).b. Put spool (14) and ring (15) in position on seat (13). Use Tool (B) to install snap ring (16) to hold them in place. 9. Install dashpot assembly (17) on the governor shaft as shown. 10. Install ring (21) in the lower groove in the governor shaft. Install one sleeve (20), spring (19), the other sleeve (20) and bearing (18) on the governor shaft as shown. Spring (19) is used to put a preload on the thrust bearing on the camshaft in the fuel injection pump housing.11. Use Tool (C) to hold spring (19) under compression. Install ring (22) in the groove in the governor shaft. Remove Tool (C). 12. Put lever (27) in position on governor servo (23). Install pin (24) to hold the lever in place. Use a hammer and chisel to stake the metal four places 90° apart on the outside surface on both legs of the governor servo to hold pin (24) in place.13. Install the O-ring seal on sleeve (25). Install piston (26) and sleeve (25) in the governor servo as shown. 14. Install valve (28) in the governor servo as shown. 15. Install one lockring (32) in the groove near the center of valve (28). Put sleeve (29), spring (broken link spring) (30) and seat (31) in position on valve (28). Install the other lockring (32) to hold the components in place. 16. Put the governor servo in position on the fuel injection pump housing with piston (26) engaged over rack (33). Install the bolts that hold the governor servo in place. The 3306 Engine has two adjustment screws and lock nuts.17. Install torque rise adjustment screw (36) in collar (34) as shown. Install locknut (35) on the screw. 18. Install bolt (38) in block (40) as shown. Install spring (37) on bolt (38) as shown. Put collar (34) in position on bolt (38) with the hole in the collar

Have questions with 101670-9020?





Group cross 101670-9020 ZEXEL

Nissan-Diesel 

 
1670090815 
INJECTION-PUMP ASSEMBLY
UDV12
 
1670090816 
INJECTION-PUMP ASSEMBLY
UDV12
101670-9020  
9 400 615 943 
1671795007 
INJECTION-PUMP ASSEMBLY
ND6

Bosch 

 
0400866092 
INJECTION-PUMP ASSEMBLY
F6L912
9 400 615 944 
 
INJECTION-PUMP ASSEMBLY
F6L912

Bosch 

 
0400866093 
INJECTION-PUMP ASSEMBLY
F6L912
9 400 615 945 
 
INJECTION-PUMP ASSEMBLY
F6L912

Nissan-Diesel 

 
1671795010 
INJECTION-PUMP ASSEMBLY
ND6
Back to top