101631-9572 ZEXEL 9 400 610 286 BOSCH INJECTION-PUMP ASSEMBLY 9400610286 1016319572 16700c6808


 

Information injection-pump assembly

BOSCH 9 400 610 286 9400610286
ZEXEL 101631-9572 1016319572
NISSAN-DIESEL 16700C6808 16700c6808
101631-9572 INJECTION-PUMP ASSEMBLY
Rating:
40
Buy INJECTION-PUMP ASSEMBLY 101631-9572 zexel genuine, new aftermarket engine parts with delivery

Service parts 101631-9572 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101063-9300
3. GOVERNOR 105542-3391
4. SUPPLY PUMP 105220-4871
5. AUTOM. ADVANCE MECHANIS 105622-0670
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105141-1881
11. Nozzle and Holder 16600-20053
12. Open Pre:MPa(Kqf/cm2) 9.8{100}
13. NOZZLE-HOLDER 105071-1241
14. NOZZLE 105000-1080
15. NOZZLE SET

Include in #1:

101631-9572 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

Zexel num
Bosch num
Firm num
Name
101631-9572 
9 400 610 286 
16700C6808  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
SD33 * K




Information:


Rework Procedure
Replacement of Diesel Oxidation Catalyst (DOC)
1. Remove three 222-8823 Bolts and three 232-3209 Washers to separate the 360-8875 Bellows Tube Assembly from the 360-8849 Catalytic Converter Group. Refer to Image1.1.1.
Image1.1.1
2. Loosen the clamp. Remove the DOC from the Catalytic Converter Group. Refer to Images1.2.1 and 1.2.2.
Image1.2.1
Image1.2.2
3. Remove the ring from the DOC. Remove the clamp from the catalytic converter. Refer to Images1.3.1 and 1.3.2.
Image1.3.1
Image1.3.2
4. Remove the five screws and five washers from the insulation around the DOC. Remove insulation from the DOC. The insulation will be reused. Refer to Images1.4.1 and 1.4.2.
Image1.4.1
Image1.4.2
5. Install the insulation that was removed from the old DOC on the new DOC. Refer to Image1.5.1.
Image1.5.1
6. Clean the sealing surface of the DOC flange. Clean the sealing surface of the flange on the catalytic converter group. Clean the ring that was removed from the old DOC. Refer to Images1.6.1, 1.6.2, and 1.6.3
Image1.6.1
Image1.6.2
Image1.6.3
7. Apply seal paste to both sides of the ring, to the flange surfaces of the new DOC, and the catalytic converter. Refer to Image1.7.1.
Note: Make sure to cover the complete ring and flange surfaces with seal paste when applying it.
Image1.7.1
8. Place the ring on the flange of the new DOC. Position the new DOC against the catalytic converter. Refer to Images1.8.1 and 1.8.2.
Image1.8.1
Image1.8.2
9. Orient the DOC so that it will line up correctly with the bellows tube. Install and orient the clamp in order to hold the new DOC in place. Apply sealing paste or high temperature grease to the bolt of the clamp. Tighten the clamp. Then reattach the DOC to the bellows tube. Refer to Image1.9.1.
Image1.9.1
10. Tap the clamp around the circumference to properly seat the clamp. Tighten the clamp to a specified torque of 18 N.m (13.3 ft-lb). Apply sealing paste or high temperature grease to the three 222-8823 Bolts to assemble the bellows. Refer to Image1.10.1.
Image1.10.1
11. Please write down the number of active regenerations. This number can be found in the Monitor Service Menu in the Aftertreatment Status section. Please enter this information to the claim story when you submit your claim. Refer to Image1.11.1.
Image1.11.1

Have questions with 101631-9572?





Group cross 101631-9572 ZEXEL

Nissan-Diesel 

 
1679090066 
INJECTION-PUMP ASSEMBLY
SD33
 
16700C6300 
INJECTION-PUMP ASSEMBLY
SD33
 
16700C6806 

SD33
 
16700C6805 
INJECTION-PUMP ASSEMBLY
SD33
 
16700C6301 

SD33
9 400 610 287 
16700C6807 
INJECTION-PUMP ASSEMBLY
SD33
 
16700C6302 
INJECTION-PUMP ASSEMBLY
 
16700C6303 
INJECTION-PUMP ASSEMBLY
SD33
9 400 610 284 
16700C6304 
INJECTION-PUMP ASSEMBLY
SD33
 
 
INJECTION-PUMP ASSEMBLY
SD33
101631-9572  
9 400 610 286 
16700C6808 
INJECTION-PUMP ASSEMBLY
SD33
 
1671790061 
INJECTION-PUMP ASSEMBLY
SD33
Back to top