101631-9551 ZEXEL 9 400 610 287 BOSCH INJECTION-PUMP ASSEMBLY 9400610287 1016319551 16700c6807


 

Information injection-pump assembly

BOSCH 9 400 610 287 9400610287
ZEXEL 101631-9551 1016319551
NISSAN-DIESEL 16700C6807 16700c6807
101631-9551 INJECTION-PUMP ASSEMBLY
Rating:
35
Buy INJECTION-PUMP ASSEMBLY 101631-9551 zexel genuine, new aftermarket engine parts with delivery

Service parts 101631-9551 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101063-9300
3. GOVERNOR 105542-3381
4. SUPPLY PUMP 105220-4871
5. AUTOM. ADVANCE MECHANIS 105622-0670
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105141-1800
11. Nozzle and Holder 16600-90019
12. Open Pre:MPa(Kqf/cm2) 9.8{100}
13. NOZZLE-HOLDER 105071-1240
14. NOZZLE 105000-1010
15. NOZZLE SET

Include in #1:

101631-9551 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

BOSCH 9 400 610 287 9400610287
ZEXEL 101631-9551 1016319551
NISSAN-DIESEL 16700C6807 16700c6807


Zexel num
Bosch num
Firm num
Name
101631-9551 
9 400 610 287 
16700C6807  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
SD33 * K 14BE PE6A PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   2.15 2.1 2.2
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   11.6
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   32.5 31.5 33.5
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   8.1+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   7.5 6.4 8.6
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Timer adjustment
Pump speed r/min   500
Advance angle deg.   0.5
Timer adjustment_02
Pump speed r/min   550
Advance angle deg.   0.7
Timer adjustment_03
Pump speed r/min   1100
Advance angle deg.   2.2 1.7 2.7
Timer adjustment_04
Pump speed r/min   1500
Advance angle deg.   4.4 3.9 4.9
Timer adjustment_05
Pump speed r/min   1900
Advance angle deg.   7.5 7 8
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101631-9551
N:Pump speed R:Rack position (mm) P:Negative pressure (1)Pneumatic governor (2)Mechanical governor (3)Acting negative pressure: P1 (4)Beginning of idle sub spring operation: L1
----------
L1=8+0.3mm
----------

Speed control lever angle

Test data 101631-9551
B:When boosted N:Normal S:Stop (1)Rack position = aa (2)Rack position bb
----------
aa=0.5mm bb=18mm
----------
a=23.5deg+-3deg b=12deg+-5deg c=2deg+-5deg

Timing setting

Test data 101631-9551
(1)Pump vertical direction (2)Position of gear mark 'Y' at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(140deg)




Information:

Fuel Filter Group
(1) Remove clips (1) and (2). Remove tube assembly (3) and elbow (4) from the fuel transfer pump on the replacement engine. Installation of new line is shown in Fuel Lines Group, Page 8.Fuel Tank Group
(1) Remove the fuel tank from the machine; see the Service Manual. (2) Fabricate boss (1) to the dimensions shown. Make 1/8" - 27 NPTF threads in one end. (3) Drill a 20.0 mm Ø (0.78" Ø) hole (A) through the bottom of the tank as shown. (4) Put boss (1) in hole (A) with the threaded end extending below the bottom of the full tank as shown. Make a 3.0 mm (0.12") fillet weld all around the boss.(5) Clean and install the fuel tank; see the Service Manual.Fuel Lines Group
(1) Remove fuel inlet hose (1) and tube assembly (2) from tube (A). (2) Install 307946 Elbow (3) and a 3J7354 Seal in the fuel transfer pump. Install 2V4869 Fitting (4) on elbow (3). Cut a 360.0 mm (14.17") length of 5P1465 Hose (5), and connect it to fitting (4) and tube assembly (A) with the former clamps.(3) Install 6D238 Valve Assembly (7) in the boss installed in the fuel tank (see Step 4, Page 7). Fasten 5G5681 Tube (8) to valve assembly (7). Use L2072 Clamp (9) to hold the other end of tube (8) in position. Install clamp (9) under bolt (10).(4) Install 307941 Elbow (11) and a 3J7354 Seal in the fuel return port of the fuel injection pump housing. Install 2V4869 Fitting (12) on elbow (11).(5) Cut a 520.0 mm (20.47") length of 5P1465 Hose (13), and connect it to fitting (12) and tube (8) with a 1P4278 Clamp (14). An optional step to the above procedure is to connect a 60.0 mm (2.36") length of 5P189 Tube to valve assembly (7). Cut a 2000.0 mm (78.75") length of 5P6442 Hose and connect it to 2V4869 Fitting (12) and to the 5P189 Tube with a 1P4278 Clamp. Tie the hose to the machine to prevent damage to the hose.Electrical System
(1) For all machines, connect the alternator wire of the harness to the alternator.(2) For machines 80U1-80U6734, remove the original voltage regulator. Put tape over the wire connection to the wiring harness so it will be out of the way. The alternator for this engine has a built in voltage regulator so the original voltage regulator is not needed for the electrical system.Flywheel Group (For Replacement of 7N9437, 1W163 or 2W7488 Engine Arrangements)
(1) Remove the flywheel from the new replacement engine.(2) Install a new 7W2290 Flywheel Assembly, and fasten it to the crankshaft with four T489 Bolts. See the Service Manual for the procedure and the bolt torque. If necessary, use of the former flywheel from the engine being replaced is acceptable.Installation Of Ether Starting Aid Group
The ether starting aid is no longer a required component of direct injection engine arrangements.(1) If the machine is equipped with an ether starting aid group, its reuse is optional. To reuse,

Have questions with 101631-9551?





Group cross 101631-9551 ZEXEL

Nissan-Diesel 

 
1679090066 
INJECTION-PUMP ASSEMBLY
SD33
 
16700C6300 
INJECTION-PUMP ASSEMBLY
SD33
 
16700C6806 

SD33
 
16700C6805 
INJECTION-PUMP ASSEMBLY
SD33
 
16700C6301 

SD33
101631-9551  
9 400 610 287 
16700C6807 
INJECTION-PUMP ASSEMBLY
SD33
 
16700C6302 
INJECTION-PUMP ASSEMBLY
 
16700C6303 
INJECTION-PUMP ASSEMBLY
SD33
9 400 610 284 
16700C6304 
INJECTION-PUMP ASSEMBLY
SD33
 
 
INJECTION-PUMP ASSEMBLY
SD33
9 400 610 286 
16700C6808 
INJECTION-PUMP ASSEMBLY
SD33
 
1671790061 
INJECTION-PUMP ASSEMBLY
SD33
Back to top