101609-9070 ZEXEL 9 400 615 918 BOSCH INJECTION-PUMP ASSEMBLY 9400615918 1016099070 3436102060


 

Information injection-pump assembly

BOSCH 9 400 615 918 9400615918
ZEXEL 101609-9070 1016099070
MITSUBISHI-HEAV 3436102060 3436102060
101609-9070 INJECTION-PUMP ASSEMBLY
Rating:
33
Buy INJECTION-PUMP ASSEMBLY 101609-9070 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

Cross reference number

BOSCH 9 400 615 918 9400615918
ZEXEL 101609-9070 1016099070
MITSUBISHI-HEAV 3436102060 3436102060


Zexel num
Bosch num
Firm num
Name
101609-9070 
9 400 615 918 
3436102060  MITSUBISHI-HEAV
INJECTION-PUMP ASSEMBLY
S6K K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5720
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.2 3.15 3.25
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.7
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   81.5 80.5 82.5
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.1+-0.5
Pump speed r/min   450 450 450
Average injection quantity mm3/st.   11 9.7 12.3
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   95 95 105
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101609-9070
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Main spring setting (6)Rack difference between N = N1 and N = N2
----------
K=14 N1=800r/min N2=400r/min
----------

Speed control lever angle

Test data 101609-9070
F:Full speed I:Idle
----------

----------
a=1deg+-5deg b=12deg+-5deg

Stop lever angle

Test data 101609-9070
N:Pump normal S:Stop the pump. (1)Hold the boss against the stop side (2)Normal
----------

----------
a=26.5deg+-5deg b=53deg+-5deg c=(11deg)

Timing setting

Test data 101609-9070
(1)Pump vertical direction (2)Position of camshaft's key groove at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(50deg)




Information:


If fuel line clamps are not installed in their exact location, vibration can cause the fuel lines to break and cause possible personal injury, or damage to the machine.
1. Disconnect front fuel injection lines (1), disconnect middle fuel injection lines (2) and rear fuel injection lines (3) from the fuel injection pump and the cylinder head assembly.2. Remove fuel injection lines (1), (2) and (3). Put caps or plugs on all fuel line connections to keep foreign material out of the fuel system.3. If a separation of the fuel lines has to be made, make sure the exact location of the clamps are marked for assembly purposes. Remove the clamps and make a separation of the fuel lines. The following steps are for the installation of the fuel injection lines.4. Remove the caps or plugs for the fuel injection line connections.5. If removed, connect the fuel lines with the clamps. Make sure the clamps are installed back in their correct location. Use Tool (A) to tighten the clamp bolts to a torque of 2.3 N m (20 lb in). For more information, see Specifications Manual SENR6470, of Testing & Adjusting Manual SENR6471.6. Install front fuel injection lines (1) on the fuel injection pump and cylinder head assembly.7 Install middle fuel injection lines (2) on the fuel injection pump and the cylinder head assembly.8. Install rear fuel injection lines (3) on the fuel injection pump and the cylinder head assembly.9. Tighten the fuel injection line nuts to a torque of 40 7 N m (30 5 lb ft).

Have questions with 101609-9070?





Group cross 101609-9070 ZEXEL

Mitsubishi-Heav 

9 400 611 446 
3436102020 
INJECTION-PUMP ASSEMBLY
S6K
9 400 611 265 
3436105051 
INJECTION-PUMP ASSEMBLY
S6K-T
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi-Heav 

9 400 612 209 
3436105062 
INJECTION-PUMP ASSEMBLY
S6K-T
9 400 611 389 
 
INJECTION-PUMP ASSEMBLY
9 400 611 897 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi-Heav 

9 400 611 946 
3436105071 
INJECTION-PUMP ASSEMBLY
S6K-T
9 400 612 210 
3436105072 
INJECTION-PUMP ASSEMBLY
S6K-T
9 400 612 500 
3436105073 
INJECTION-PUMP ASSEMBLY
S6K-T

Dpico 

F 019 Z20 033 
 
INJECTION-PUMP ASSEMBLY
D1146TI
F 019 Z20 034 
 
INJECTION-PUMP ASSEMBLY
6D16T
F 019 Z20 035 
 
INJECTION-PUMP ASSEMBLY
6D16

Mitsubishi-Heav 

101609-9070  
9 400 615 918 
3436102060 
INJECTION-PUMP ASSEMBLY
S6K
9 400 612 458 
3436103081 
INJECTION-PUMP ASSEMBLY
S6K

Dpico 

F 019 Z20 036 
 
INJECTION-PUMP ASSEMBLY
DB58NA
Back to top