101608-9600 ZEXEL F 01G 09U 066 BOSCH INJECTION-PUMP ASSEMBLY f01g09u066 1016089600 1671395307


 

Information injection-pump assembly

BOSCH F 01G 09U 066 f01g09u066
ZEXEL 101608-9600 1016089600
NISSAN-DIESEL 1671395307 1671395307
101608-9600 INJECTION-PUMP ASSEMBLY
Rating:
73
Buy INJECTION-PUMP ASSEMBLY 101608-9600 zexel genuine, new aftermarket engine parts with delivery

Service parts 101608-9600 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-5350
3. GOVERNOR 105921-7710
4. SUPPLY PUMP 105220-7060
5. AUTOM. ADVANCE MECHANIS 105672-0720
6. COUPLING PLATE 105662-1630
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105160-4180
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105031-4620
14. NOZZLE 105025-0130
15. NOZZLE SET

Include in #1:

101608-9600 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

BOSCH F 01G 09U 066 f01g09u066
ZEXEL 101608-9600 1016089600
NISSAN-DIESEL 1671395307 1671395307


Zexel num
Bosch num
Firm num
Name
101608-9600 
101608-9601 
F 01G 09U 066 
1671395307  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
NE6TA * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.9 3.85 3.95
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   13.8
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   118 116.4 119.6
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   9.6+-0.5
Pump speed r/min   275 275 275
Average injection quantity mm3/st.   9 7.2 10.8
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(13.8)
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   118 117 119
Basic   *
Fixing the lever   *
Boost pressure kPa   43.3 43.3
Boost pressure mmHg   325 325
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-0.8
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   94.5 91.3 97.7
Fixing the lever   *
Boost pressure kPa   43.3 43.3
Boost pressure mmHg   325 325
Injection quantity adjustment_05
Adjusting point   C
Rack position   R2-0.95
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   59.5 55.5 63.5
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_06
Adjusting point   I
Rack position   -
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   80 80 100
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Rack limit   *
Boost compensator adjustment
Pump speed r/min   600 600 600
Rack position   R2-0.95
Boost pressure kPa   14 12.7 15.3
Boost pressure mmHg   105 95 115
Boost compensator adjustment_02
Pump speed r/min   600 600 600
Rack position   R2[R1-1. 2]
Boost pressure kPa   30 30 30
Boost pressure mmHg   225 225 225
Timer adjustment
Pump speed r/min   920--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   870
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   2 1.5 2.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101608-9600
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Boost compensator stroke: BCL
----------
T1=J98 BCL=0.95+-0.1mm
----------

Speed control lever angle

Test data 101608-9600
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt setting
----------
aa=100mm
----------
a=26.5deg+-5deg b=42deg+-3deg

Stop lever angle

Test data 101608-9600
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa
----------
aa=36mm
----------
a=20deg+-5deg b=40deg+-5deg

Timing setting

Test data 101608-9600
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(40deg)




Information:

To ensure safety, make sure that bolts and bar for the prevention of crankshaft rotation have sufficient strength.
Flywheel
Installation of flywheel housing(1) Install the oil seal to the flywheel housing.(2) Coat the contact surfaces of the crankcase and flywheel with ThreeBond 1104.(3) Align the holes in the flywheel housing and gasket with the dowel pins on the crankcase, and install them to the crankcase.Installation of Flywheel
Installation of flywheel(1) Install the flywheel to the crankshaft by aligning the hole with the dowel pin on the back-end of the crankshaft.(2) Place the washer and tighten the four bolts to the specified torque.Measurement of Flywheel Runout
Measurement of face runout and circular runoutMeasure the flywheel runout with the flywheel installed to the crankshaft. If the standard value is exceeded, check the bolts for tightening condition and the mounting face for adhesion of foreign particles. Cylinder Head and Valve Mechanisms
Installation of valve stem seal(1) Apply engine oil to the valve stem, and insert it into the valve guide.(2) Place a new stem seal on the valve guide.(3) Using the stem seal installer, install the stem seal to the valve guide, making use of the valve stem as a guide. Installation of Valves and Valve Springs
Installation of valve and valve spring(1) Place the valve spring and retainer on the valve guide, and install the valve cotter using the valve spring pusher.
Excessive compression of the valve spring can cause the retainer to contact the stem seal and damage the seal.
Confirmation of secure valve cotter installation(2) Using a soft-faced hammer, tap the top of the valve stem several times to make sure that the spring and valve cotter are securely installed.Installation of Cylinder Head Gasket
Installation of cylinder head gasket(1) Make sure the top surface of the crankcase and piston upper surfaces are clean and free of dust.(2) Place a new gasket of the crankcase, making sure that the dowel pins on the top face of the crankcase enter the holes in the gasket.
Do not use a liquid gasket.
Installation of Cylinder Head
Installation of cylinder head assemblyPlace the cylinder head on the head gasket, making sure that the dowel pins on the top face of the crankcase enters the holes in the cylinder head.Tightening of Cylinder Head Bolts
Cylinder head bolt tightening sequenceTighten the cylinder head bolts, following the tightening sequence shown in the diagram two or three times before reaching the specified torque.Assembly of Rocker Arm and Rocker Shaft Assembly
Assembly of rocker shaft assemblyWhen installing the rocker arms, make sure that the shaft assembly marks face the front of the engine, as shown in the diagram. After the assembly, make sure that the rocker arms move smoothly.Installation of Pushrods
(1) Insert the pushrods in the cylinder head through the pushrod holes.(2) Make sure that the ball end of each pushrod rests securely on the curved surface of the tappet.Installation of Rocker Shaft Assemblies
Installation of rocker shaft assembly(1) Install the valve caps.(2) When installing the rocker shaft brackets, tighten the long bolts first, then tighten the short bolts (reversal of removal

Have questions with 101608-9600?





Group cross 101608-9600 ZEXEL

Nissan-Diesel 

101608-9600  

101608-9601 
F 01G 09U 066 
1671395307 
INJECTION-PUMP ASSEMBLY
NE6TA
9 400 612 171 
1671395317 
INJECTION-PUMP ASSEMBLY
NE6TA
 
1671395308 
INJECTION-PUMP ASSEMBLY
NE6TA
9 400 611 756 
 
INJECTION-PUMP ASSEMBLY
NE6TA

Nissan-Diesel 

9 400 612 620 
1671395314 
INJECTION-PUMP ASSEMBLY
NE6TA
 
1671395309 
INJECTION-PUMP ASSEMBLY
NE6TA
9 400 615 881 
1671395319 
INJECTION-PUMP ASSEMBLY
NE6TA
 
1671395310 
INJECTION-PUMP ASSEMBLY
NE6TA
9 400 615 882 
1671395318 
INJECTION-PUMP ASSEMBLY
NE6TA
F 019 Z10 180 
1671395311 
INJECTION-PUMP ASSEMBLY
NE6TA
9 400 615 883 
1671395316 
INJECTION-PUMP ASSEMBLY
NE6TA
9 400 615 884 
1671395312 
INJECTION-PUMP ASSEMBLY
NE6
9 400 612 264 
1670095079 
INJECTION-PUMP ASSEMBLY
NE6
 
16713Z6860 
INJECTION-PUMP ASSEMBLY
FE6E
F 019 Z10 181 
16713Z6903 
INJECTION-PUMP ASSEMBLY
FE6E
F 01G 09U 067 
16713Z6976 
INJECTION-PUMP ASSEMBLY
FE6E
9 400 611 522 
16714Z5517 
INJECTION-PUMP ASSEMBLY
FE6E

China 

9 400 615 885 
 
INJECTION-PUMP ASSEMBLY
6110

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
6D16
Back to top