101608-9190 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016089190


 

Information injection-pump assembly

ZEXEL 101608-9190 1016089190
101608-9190 INJECTION-PUMP ASSEMBLY
Rating:
15
Buy INJECTION-PUMP ASSEMBLY 101608-9190 zexel genuine, new aftermarket engine parts with delivery

Service parts 101608-9190 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-3440
3. GOVERNOR 105921-7650
4. SUPPLY PUMP 105220-7050
5. AUTOM. ADVANCE MECHANIS 105614-3401
6. COUPLING PLATE 105661-1130
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6690
11. Nozzle and Holder 16600-Z5519
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105031-4650
14. NOZZLE 105015-6380
15. NOZZLE SET

Include in #1:

101608-9190 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

Zexel num
Bosch num
Firm num
Name
101608-9190 
 
  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FE6B *




Information:


Removing Connecting Rod and Piston
Removing Piston PinInspection
Inspect the removed parts. If any parts are found defective, replace or repair them.
Inspection of Piston and Connecting Rod1. Inspection of piston ring gapsPut each piston ring into the cylinder bore and push the ring with piston to position the ring on square with the cylinder wall. Measure the ring gap with a feeler gauge. If the measurement exceeds service limit, replace that piston ring.
Measuring Ring Gap CAUTION* When only the replacement of rings is to be made, without reboring (honing) of the cylinder, position the ring to be measured at the least worn place of cylinder skirt.* When replacing rings, install the new rings having the same size as the piston.* Piston rings available for servicing are sized into three classes: STD, 0.25 OS, and 0.50 OS.2. Inspection of ring groove in pistonMeasure the side clearance for each piston ring set in the ring groove in the piston. If the service limit is exceeded, replace the ring with new one. If the clearance still exceeds the service limit, replace the piston with new one.
Measuring Ring Side Clearance
Note: No. 1 ring is of the semi-key stone typeInstallation
When reassembling the piston and connecting rod and installing the piston-and-rod assemblies in the cylinder block, pay attention to the following:(1) Reassembling the piston and connecting rodUsing the Piston Pin Setting Tool, press the piston pin in to the set position.
Installation of Piston and Connecting Rod
Pressing in Piston Pin(2) Installation of piston rings
Installation of Piston Rings and Connecting Rod Cap(3) Set the piston ring gaps to the proper positions as shown in the figure at right. Coat the rings and cylinder wall with oil.
Proper Arrangement of Ring Gaps(4) Using a piston-ring compressor to compress the rings into the grooves, push the piston-and-rod assembly down into the cylinder. Be sure not to break the rings by excessively knocking the head of piston. Note that the front marks on the piston and connecting rod are toward the engine front.(5) Coat the bearing surface of the connecting rod caps with engine oil. Fit each cap to the connecting rod using match marks put before removal as a guide. In the case of a new rod which does not such a match mark, position the notches (provided for preventing the bearing from rotating) on the same side.
Fitting Cap to Connecting RodCRANKSHAFT
Construction
Crankshaft Component Parts(1) Key(2) Crankshaft(3) Crankshaft gear(4) Crankshaft pulley(5) Nut(6) Washer(7) Spring washer(8) Flywheel(9) Ring gear(10) Rear oil seal(11) Rear oil seal case(12) Gasket(13) Flywheel boltRemoval
(1) Loosen the flywheel bolts and remove the flywheel.(2) Loosen the crankshaft pulley nut and remove the pulley.(3) Remove the rear oil seal case assembly.(4) Remove the bearing caps. Keep each set of bearings removed together with its bearing cap.(5) Take out the crankshaft.
Removing Main Bearing CapInspection
Inspect the removed parts. If any parts are found defective, repair or replace them.
Inspection of Crankshaft and Flywheel1. Checking the crankshaft for wearTo check the crankpins and main journals for tapering wear and out-of-round wear, diameter of each crankpin

Have questions with 101608-9190?





Group cross 101608-9190 ZEXEL

Nissan-Diesel 

 
16713Z6609 
INJECTION-PUMP ASSEMBLY
FE6EH
9 400 615 867 
16713Z6909 
INJECTION-PUMP ASSEMBLY
FE6EH
 
16713Z6613 
INJECTION-PUMP ASSEMBLY
FE6E
9 400 619 726 
16713Z6902 
INJECTION-PUMP ASSEMBLY
FE6E
F 019 Z20 478 
16713Z6973 
INJECTION-PUMP ASSEMBLY
FE6E
 
16713Z6614 
INJECTION-PUMP ASSEMBLY
FE6E
F 019 Z10 119 
16713Z6901 
INJECTION-PUMP ASSEMBLY
FE6E
F 01G 09U 062 
16713Z6974 
INJECTION-PUMP ASSEMBLY
FE6E

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
K6

Nissan-Diesel 

F 01G 09U 063 
1671395301 
INJECTION-PUMP ASSEMBLY
NE6TA
9 400 615 868 
1671395303 
INJECTION-PUMP ASSEMBLY
NE6TA
F 01G 09U 064 
1671395302 
INJECTION-PUMP ASSEMBLY
NE6TA
F 01G 09U 065 
1671395304 
INJECTION-PUMP ASSEMBLY
NE6TA

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
6D16
 
 
INJECTION-PUMP ASSEMBLY
6D16
 
 
INJECTION-PUMP ASSEMBLY
6D22

Nissan-Diesel 

101608-9190  
 
 
INJECTION-PUMP ASSEMBLY
FE6B
Back to top