101608-1590 ZEXEL 9 400 612 207 BOSCH INJECTION-PUMP ASSEMBLY 9400612207 1016081590 me078434


 

Information injection-pump assembly

BOSCH 9 400 612 207 9400612207
ZEXEL 101608-1590 1016081590
MITSUBISHI ME078434 me078434
101608-1590 INJECTION-PUMP ASSEMBLY
Rating:
55
Buy INJECTION-PUMP ASSEMBLY 101608-1590 zexel genuine, new aftermarket engine parts with delivery

Service parts 101608-1590 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101062-8080
3. GOVERNOR 105412-2430
4. SUPPLY PUMP 105210-4661
5. AUTOM. ADVANCE MECHANIS 105672-5400
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105160-4501
11. Nozzle and Holder ME078373
12. Open Pre:MPa(Kqf/cm2) 17.7{180}
13. NOZZLE-HOLDER 105030-3660
14. NOZZLE 105025-0920
15. NOZZLE SET

Include in #1:

101608-1590 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 612 207 9400612207
ZEXEL 101608-1590 1016081590
MITSUBISHI ME078434 me078434


Zexel num
Bosch num
Firm num
Name
101608-1590 
101608-1591 
9 400 612 207 
ME078434  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D16 * K 14BF INJECTION PUMP ASSY PE6AD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5520
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4.2 4.15 4.25
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.2
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   66 65 67
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   8+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   8.5 7 10
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Timer adjustment
Pump speed r/min   1050--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1000
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   4 3.5 4.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101608-1590
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Torque spring does not operate. (4)Main spring setting (5)Set idle sub-spring
----------
K=7
----------

Speed control lever angle

Test data 101608-1590
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=17deg+-5deg b=30deg+-5deg

Stop lever angle

Test data 101608-1590
N:Pump normal S:Stop the pump.
----------

----------
a=26deg+-5deg b=53deg+-5deg

Timing setting

Test data 101608-1590
(1)Pump vertical direction (2)Position of timer's tooth at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=12deg
----------
a=(0deg)




Information:

Hot Test Procedure
Start engine, run at low idle, and ensure minimum oil pressure of 235 kPa (34 psi) is present within 30 sec. Walk around the engine and check for leaks. Run straight diesel with Natural Gas shut off.
Check ET for Codes.
Run Break-In 1 Speed and Load for 1 min.
Break-In load and speed 2967 Nm at 1440 rpm.
Cycle Load Between Break-In 2 Load, and Break-In 1 Load, 3 times holding at each load for 30 sec.
Break-In load and speed 5933 Nm at 1800 rpm.
Remove dyno load and go to Low Idle.
Illustration 276 g06547946
Cat ET EGR system test
Run EGR verification check in ET, and ensure it Passes. Run the EGR verification check a second time if the first one fails. If itfailsagain shut the engine offand troubleshoot EGR system.
Cat ET EGR System Test.
If Aftertreatment is not installed the Exhaust Backpressure must be within pressure tolerance of 7 3 kPa (1.0 0.4 psi) at the end of Break-In 2.
Illustration 277 g06547948
Cat ET fuel system functional test
Run Fuel System verification check in ET, and ensure it Passes.Note: Checking to see, if this is needed or not
DO NOT Lug engine until the engine has a successful EGR verification check, and Engine Backpressure is acceptable (Aftertreatment installed or backpressure verified during Break-In 2).
Set engine speed to Hi Idle speed.
Lug to engine to "Full Load speed" and allow water temps to stabilize.
EJW 85° 4°C (185° 39°F).
SCAC 46° 3°C (115° 37°F).
ATAAC Out 48° 3°C (118° 37°F).
Acquire "Full Load Data".
Take screenshot from ET for some ECM parameters.
Lug engine to "Torque Check" speed and allow engine to stabilize.
Acquire "Torque Check Data".
Take screenshot from ET for some ECM parameters.
Go to "Gas Blending Speed and Load".
754 bkW at 1800 rpm.
Turn on Gas supply. Natural Gas supply pressure measured on engine should be between 100 70 kPa (15 to 10 psi).
Let engine stabilize for 1 min.
Acquire Diesel and Natural Gas fuel rates.
Take ET screenshot.
Remove engine load and stabilize at High Idle speed for 1 min.
Acquire Hi Idle Data.
Take screenshot from ET for some ECM parameters.
Set engine to Low Idle speed and stabilize for 1 min.
Acquire Low Idle Data.
Take screenshot from ET for some ECM parameters.Nominal Test Values
The following nominal value information for hot tests can be referenced in the TMI system under the following test specs:
Illustration 278 g06547949
TMI Spec Summary
Illustration 279 g06547950
Full Load Point Values (2500 hp SCAC)
Illustration 280 g06547951
Full Load Point Values (2500 hp ATAAC)
Full Load Point.
Illustration 281 g06547952
Torque Check Point Values (2500 hp SCAC)
Illustration 282 g06547953
Torque Check Point Values (2500 hp ATAAC)
Torque Check Point.
Illustration 283 g06547954
Gas Blend Point Values (2500 hp SCAC)
Illustration 284 g06547955
Gas Blend Point Values (2500 hp ATAAC)
Gas Blend Point.

Have questions with 101608-1590?





Group cross 101608-1590 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 802 
ME078448 
INJECTION-PUMP ASSEMBLY
6D16T
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 761 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 803 
ME075942 
INJECTION-PUMP ASSEMBLY
6D16
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 556 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 613 508 
ME072750 
INJECTION-PUMP ASSEMBLY
6D16T2
9 400 610 759 
ME075401 
INJECTION-PUMP ASSEMBLY
6D17-2
9 400 615 804 
ME6H6067 
INJECTION-PUMP ASSEMBLY
6D14
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 805 
ME088946 
INJECTION-PUMP ASSEMBLY
6D34T
9 400 610 760 
ME072805 
INJECTION-PUMP ASSEMBLY
6D16T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 806 
ME072830 
INJECTION-PUMP ASSEMBLY
6D16
F 019 Z10 236 
 
INJECTION-PUMP ASSEMBLY
9 400 610 761 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 611 754 
ME088945 
INJECTION-PUMP ASSEMBLY
6D34T
101608-1590  

101608-1591 
9 400 612 207 
ME078434 
INJECTION-PUMP ASSEMBLY
6D16
 
ME444577 
INJECTION-PUMP ASSEMBLY
6D16
Back to top