101607-6895 ZEXEL 9 400 610 720 BOSCH INJECTION-PUMP ASSEMBLY 9400610720 1016076895 me075609


 

Information injection-pump assembly

BOSCH 9 400 610 720 9400610720
ZEXEL 101607-6895 1016076895
MITSUBISHI ME075609 me075609
101607-6895 INJECTION-PUMP ASSEMBLY
Rating:
41
Buy INJECTION-PUMP ASSEMBLY 101607-6895 zexel genuine, new aftermarket engine parts with delivery

Service parts 101607-6895 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-8851
3. GOVERNOR 105932-0624
4. SUPPLY PUMP 105210-6020
5. AUTOM. ADVANCE MECHANIS 105672-5230
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105110-7183
11. Nozzle and Holder ME075761
12. Open Pre:MPa(Kqf/cm2) 15.7{160}/21.6{220}
13. NOZZLE-HOLDER 105041-3031
14. NOZZLE
15. NOZZLE SET 105019-0371

Include in #1:

101607-6895 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

BOSCH 9 400 610 720 9400610720
ZEXEL 101607-6895 1016076895
MITSUBISHI ME075609 me075609


Zexel num
Bosch num
Firm num
Name
101607-6895 
9 400 610 720 
ME075609  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D17-2 K 14BF INJECTION PUMP ASSY PE6AD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-8420
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.2 3.15 3.25
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.9
Pump speed r/min   850 850 850
Each cylinder's injection qty mm3/st.   81.5 79.1 83.9
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   9.5+-0.5
Pump speed r/min   600 600 600
Each cylinder's injection qty mm3/st.   10.8 9.2 12.4
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.9)
Pump speed r/min   850 850 850
Average injection quantity mm3/st.   81.5 80.5 82.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.35
Pump speed r/min   1450 1450 1450
Average injection quantity mm3/st.   88 84 92
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   C
Rack position   R1-0.5
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   59.5 55.5 63.5
Fixing the lever   *
Injection quantity adjustment_06
Adjusting point   I
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   95 85 105
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   950--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   900
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   -
Advance angle deg.   1 0.5 1.5
Remarks
Measure the actual speed.
 
Timer adjustment_04
Pump speed r/min   1100
Advance angle deg.   1 0.5 1.5
Timer adjustment_05
Pump speed r/min   1400
Advance angle deg.   7 6.5 7.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101607-6895
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT
----------
T1=L01
----------

Speed control lever angle

Test data 101607-6895
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=35mm
----------
a=41deg+-5deg b=42deg+-3deg

Stop lever angle

Test data 101607-6895
N:Pump normal S:Stop the pump. (1)Set the stopper bolt at pump speed = aa and rack position = bb (non-injection rack position). Confirm non-injection. (2)After setting the stopper bolt, confirm non-injection at speed cc. Rack position = dd (non-injection rack position).
----------
aa=1450r/min bb=7.2-0.5mm cc=275r/min dd=(8.8)mm
----------
a=32.5deg+-5deg b=25deg+-5deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=400r/min Ra=9.2+-0.1mm
----------

Timing setting

Test data 101607-6895
(1)Pump vertical direction (2)Position of timer's tooth at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=7deg
----------
a=(4deg)




Information:


Install the pump cover onto the pump housing. Tighten the four middle bolts. Then, tighten the end bolts in a crisscross pattern. Tighten the bolts to a torque of 10.2 N m (90 lb in).Note: Make sure that the gasket is in place between the housing and the cover.
Repeat Step 1 and Step 2 in order to confirm the electrical connection for the pump coil was not damaged during the removal of the pump cover.
Install the oil inlet line adapter, inlet line, and harness connector to the pump.Note: After the HEUI pump is replaced or reassembled, the engine must be cranked for an extended length of time to fill the pump with oil.Note: Clear any diagnostic or event codes that activated during the initial start-up.
If the engine would not start before inspecting for debris and no debris was found in the HEUI pump, return to Step D in the diagnostic flow chart.If the engine would start before inspecting for debris and no debris was found in the HEUI pump, return to Step L in the diagnostic flow chart.If the pump is to be replaced, complete the checklist form in Special Instruction, REHS5031 that is provided with the service replacement part and insert the completed form back into the box containing the part that is being returned. Proceed to the section of this instruction titled "Oil Rail Cleaning Procedure" for the correct engine size that is being serviced.Oil Rail Cleaning Procedure For the C7 Engine
Illustration 12 g02702636
C7 Cylinder Head
Illustration 13 g02708256
The oil and fuel passages are the same for both the C7 and C9.
(6) Oil Rail for a HEUI fuel system
(7) Oil passage to injector bore
(8) Fuel passage
(9) Injector bore Note: Contain any oil and cleaner that will flow from the cylinder and the lines during the following process. Properly dispose of the oil and contaminated cleaner when work is complete.
Remove fuel injectors. Refer to Disassembly and Assembly for specific machine.
Install six plugs 9U-7080 Tapered Cap/Plug into the lower injector bores. The plugs will prevent oil, cleaners, and debris from entering the cylinders.
Remove the plugs from the front and rear of the cylinder head main oil gallery
Remove the pressure sensor from the cylinder head. Protect the sensor.
Clean out the two rail drain holes by removing their plugs and using the brake cleaner and long squirting straw to flush these passages to the oil rail.
Using the solvent gun with and without the

Have questions with 101607-6895?





Group cross 101607-6895 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

101607-6895  
9 400 610 720 
ME075609 
INJECTION-PUMP ASSEMBLY
6D17-2
Back to top