Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-8420
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.2 3.15 3.25
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   12
Pump speed r/min   850 850 850
Each cylinder's injection qty mm3/st.   85.1 82.5 87.7
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   9.5+-0.5
Pump speed r/min   800 800 800
Each cylinder's injection qty mm3/st.   10.8 9.2 12.4
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12)
Pump speed r/min   850 850 850
Average injection quantity mm3/st.   85.1 84.1 86.1
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.85
Pump speed r/min   1450 1450 1450
Average injection quantity mm3/st.   99.9 95.9 103.9
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   I
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   91 81 101
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1100
Advance angle deg.   0.5
Timer adjustment_02
Pump speed r/min   1300
Advance angle deg.   2.5 2.5 3.5
Timer adjustment_03
Pump speed r/min   1450
Advance angle deg.   6 5.5 6.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101607-6800
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set using the changeover lever.
----------
T1=H28
----------

Speed control lever angle

Test data 101607-6800
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=29mm
----------
a=10deg+-5deg b=(47.5deg)+-3deg

Stop lever angle

Test data 101607-6800
N:Engine manufacturer's normal use S:Stop the pump. (1)Set the stopper bolt at pump speed = aa and rack position = bb (non-injection rack position). Confirm non-injection. (2)After setting the stopper bolt, confirm non-injection at speed cc. Rack position = dd (non-injection rack position). (3)Rack position = approximately ee. (4)Free (at delivery)
----------
aa=1450r/min bb=7.2-0.5mm cc=275r/min dd=(8.8)mm ee=15mm
----------
a=36.5deg+-5deg b=(25deg) c=13deg+-5deg

0000001201

Test data 101607-6800
I:Idle F:At operation, hold it in the full speed position. (1)Set the stopper bolt at rack position = aa, speed = bb. Apply red paint. (2)Actual measurement
----------
aa=9.9+-0.1mm bb=1575r/min
----------
a=15deg+-5deg

0000001501 MICRO SWITCH

Adjust the bolt to obtain the following lever position when the micro-switch is ON. 1. Microswitch adjustment (OPEN type) Confirm with the lever angle at full. (1)Speed N1 (2)Rack position Ra 2. Idle side microswitch adjustment (OPEN type) Confirm with the lever angle at idle. (1)Speed N2 (2)Rack position Rb
----------
N1=1675r/min Ra=9.9+-0.1mm N2=275r/min Rb=9.7+-0.1mm
----------

0000001601 RACK SENSOR

Test data 101607-6800
V1:Supply voltage V2f:Full side output voltage V2i:Idle side output voltage (A) Black (B) Yellow (C) Red (D) Trimmer (E): Shaft (F) Nut (G) Load lever 1. Load sensor adjustment (1)Connect as shown in the above diagram and apply supply voltage V1. (2)Hold the load lever (G) against the full side. (3)Turn the shaft so that the voltage between (A) and (B) is V2. (4)Hold the load lever (G) against the idle side. (5)Adjust (D) so that the voltage between (A) and (B) is V2i. (6)Repeat the above adjustments. (7)Tighten the nut (F) at the point satisfying the standards. (8)Hold the load lever against the full side stopper and the idle side stopper. (9)At this time, confirm that the full side output voltage is V2f and the idle side output voltage is V2i.
----------
V1=3.57+-0.02V V2f=3+0.05V V2i=1+0.1V
----------

Timing setting

Test data 101607-6800
(1)Pump vertical direction (2)Position of timer's tooth at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=10deg
----------
a=(2deg)




Information:


Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     380-5200     Tool Kit     1    
B     366-7782     Attenuator     1    Testing Procedure
Perform a "Manual Diesel Particulate Filter Regeneration" using the electronic service tool. If the "Manual Diesel Particulate Filter Regeneration" procedure follows the removal of excess oil from the exhaust system, proceed to Step 2.
Follow the procedure that is detailed by Step 1.b through to Step 1.m to clean oil from the exhaust system.
Remove excess oil from all pipes with a clean cloth.
Remove the DPF from the bracket for the clean emission module. Refer to Disassembly and Assembly, "Diesel Particulate Filter - Remove" for the correct procedure.
Use a suitable supporting device, position the DPF in a vertical position. Ensure that the inlet side of the DPF faces in a DOWNWARDS position.
Let the DPF drain overnight. The oil will collect inside the inlet face of the DPF. Position a suitable container under the inlet face of the DPF. Incline the inlet face of the DPF to drain the oil into the container.
If amount drained from DPF equals less than 1 L (0.26 US gal), proceed to Step 1.g. If amount is greater than 1 L (0.26 US gal), then the DPF should be replaced.
Remove excess oil from the inlet and outlet of the DPF with a clean cloth.
Install the DPF from the bracket for the clean emission module. Refer to Disassembly and Assembly, "Diesel Particulate Filter - Install" for the correct procedure.
Start the engine. Operate the engine a 100 percent throttle for a MINIMUM of 20 minutes. Do not operate the application under load at this time period.
After 20 minutes, use the electronic service tool to perform the "DPF Desulphation Procedure". The "DPF Desulphation Procedure" will last 60 minutes.
Once the "DPF Desulphation Procedure" has been completed, observe the soot load. If the soot load is at a value less than 80 percent, then the application can be returned to service.
Check the application for any signs of visible black smoke coming from the exhaust stack after the cleaning procedure has been completed. This could indicate a cracked DPF that will need to be replaced.Note: Black soot residue on the surface of the inside of the exhaust stack does not necessarily indicate a cracked DPF therefore should not be used in determining a problem with the DPF.
If white smoke does not dissipate, contact the Technical Communicator at a Caterpillar dealer. For further assistance, the Technical Communicator can confer with the Dealer Solutions Network.
After the manual DPF regeneration is complete, operate the engine at 1800 rpm for a MINIMUM of 20 minutes to stabilize the DPF temperatures.Note: The engine must maintain a steady speed for the entire duration of the test.
Hot engine components can cause injury from burns. Before performing maintenance on the engine, allow the engine and the components to cool.
Illustration 1 g02597531
Typical example (1) DPF Outlet Cap (2) Filter Paper (3) Hose Assembly (4) Air Pump
Illustration

Have questions with 101607-6800?





Group cross 101607-6800 ZEXEL

101607-6800  
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 730 
ME075552 
INJECTION-PUMP ASSEMBLY
6D17
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 716 
ME075572 
INJECTION-PUMP ASSEMBLY
6D16
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 717 
ME075573 
INJECTION-PUMP ASSEMBLY
6D17-2
9 400 615 731 
ME075595 
INJECTION-PUMP ASSEMBLY
6D15T3
9 400 615 732 
ME075596 
INJECTION-PUMP ASSEMBLY
6D15T3
9 400 615 733 
ME075594 
INJECTION-PUMP ASSEMBLY
6D14
 
 
INJECTION-PUMP ASSEMBLY
9 400 610 718 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 734 
ME078064 
INJECTION-PUMP ASSEMBLY
6D16TL
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 719 
ME075574 
INJECTION-PUMP ASSEMBLY
6D17-2
9 400 615 735 
ME077820 
INJECTION-PUMP ASSEMBLY
6D16
 
 
INJECTION-PUMP ASSEMBLY
 
 