101607-6350 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016076350


 

Information injection-pump assembly

ZEXEL 101607-6350 1016076350
101607-6350 INJECTION-PUMP ASSEMBLY
Rating:
23
Buy INJECTION-PUMP ASSEMBLY 101607-6350 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101607-6350 1016076350


Zexel num
Bosch num
Firm num
Name
101607-6350 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-8420
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.2 3.15 3.25
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   12.3
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   101.8 98.7 104.9
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   9.5+-0.5
Pump speed r/min   600 600 600
Each cylinder's injection qty mm3/st.   11.5 9.8 13.2
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12.3)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   101.8 100.8 102.8
Basic   *
Fixing the lever   *
Boost pressure kPa   36 36
Boost pressure mmHg   270 270
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+1
Pump speed r/min   1350 1350 1350
Average injection quantity mm3/st.   117.9 113.9 121.9
Fixing the lever   *
Boost pressure kPa   36 36
Boost pressure mmHg   270 270
Injection quantity adjustment_05
Adjusting point   C
Rack position   R2(R1-0. 4)
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   92.6 88.6 96.6
Fixing the lever   *
Boost pressure kPa   36 36
Boost pressure mmHg   270 270
Injection quantity adjustment_06
Adjusting point   E
Rack position   R1+0.7
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   113.5 109.5 117.5
Fixing the lever   *
Boost pressure kPa   36 36
Boost pressure mmHg   270 270
Boost compensator adjustment
Pump speed r/min   400 400 400
Rack position   R2-0.75
Boost pressure kPa   3.3 2 4.6
Boost pressure mmHg   25 15 35
Boost compensator adjustment_02
Pump speed r/min   400 400 400
Rack position   R2(R1-0. 4)
Boost pressure kPa   22.7 22.7 22.7
Boost pressure mmHg   170 170 170
Timer adjustment
Pump speed r/min   1150--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1100
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1340
Advance angle deg.   3.5 3 4
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101607-6350
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Boost compensator stroke: BCL
----------
T1=H52 BCL=0.75+-0.1mm
----------

Speed control lever angle

Test data 101607-6350
F:Full speed I:Idle (1)Accelerator lever (2)Use the hole at R = aa (3)Stopper bolt set position 'H'
----------
aa=35mm
----------
a=41deg+-5deg b=(42deg)+-3deg

Stop lever angle

Test data 101607-6350
N:Pump normal S:Stop the pump. (1)Set the stopper bolt at pump speed = aa and rack position = bb (non-injection rack position). Confirm non-injection. (2)After setting the stopper bolt, confirm non-injection at speed cc. Rack position = dd (non-injection rack position).
----------
aa=1350r/min bb=7-0.5mm cc=275r/min dd=(8)mm
----------
a=25deg+-5deg b=27deg+-5deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=400r/min Ra=9.2+-0.1mm
----------

Timing setting

Test data 101607-6350
(1)Pump vertical direction (2)Position of timer's tooth at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=11deg
----------
a=(1deg)




Information:


Personal injury can result from being struck by parts propelled by a released spring force.Make sure to wear all necessary protective equipment.Follow the recommended procedure and use all recommended tooling to release the spring force.
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.Dispose of all fluids according to local regulations and mandates.
If possible, take the fuel injection pump to a clean work area.
Clean the outside surfaces of the fuel injection pump.
Illustration 1 g03117860
Typical example
Place a suitable container under the fuel injection pump to collect any fuel from the fuel injection pump. Use a suitable tool to loosen the drain plug (1). If necessary, retain the fuel collected for analysis if required.
Illustration 2 g03117878
Typical example
Use a suitable pair of pliers to remove the throttle return spring (2).Note: Care should be taken when the spring is removed.
Illustration 3 g03117896
Typical example
Loosen self-locking nut (3). Do not remove the nut.
Illustration 4 g03117916
Typical example
Use a suitable pair of pliers to lift and disconnect throttle spring (4). Remove self-locking nut (3), washer, upper retainer, spring, lower retainer, spacer, lever, and dust cap.Note: Care should be taken when the spring is removed.
Illustration 5 g03117938
Typical example
Remove four screws (6) in the governor cover (7). Gently push the throttle shaft (5) down into the cover (7).
Illustration 6 g03117956
Typical example
To inspect the internal components of the fuel injection pump, gently lift and rotate the cover (7).Note: The cover is still connected internally, if resistance is felt, lower the cover and move the cover backwards. Attempt to lift the cover again.
Inspect the internal components of the fuel injection pump. Refer to steps 9a and 9b.
Illustration 7 g03117961
Typical example
If good quality fuel is being used, the components will be clean. Refer to illustration 7. Take photographs of the identification plate of the fuel injection pump and any evidence found. Attach the photographs to support the claim story.
Illustration 8 g03118119
Typical example
Illustration 9 g03118121
Typical example
If the injection pump has been run with excessive water in the fuel, there will be signs of rust and oxidization of the steel components. Refer to illustration 8. Fuel with dirt ingress will show a build-up of dirt on the components. Refer to illustration 9.Note: Issues with the fuel injection pump that are due to dirt and water void Caterpillar warranty. Advise the customer on the correct fuel, maintenance, and fuel storage procedures. Refer to the relevant Operation and Maintenance Manual for more information.If the fuel injection pump shows signs that contaminated fuel is the root cause of the problem, the evidence can be shown to the customer immediately.After the fuel injection pump has been inspected, the fuel injection pump must not be used in service.Rebuild the fuel injection pump. Refer to steps 1 to 6
Lower the cover (7) back into position. Ensure the throttle shaft (5), has been returned to the original position.
Install the four screws (6) to the cover (7). Tighten the

Have questions with 101607-6350?





Group cross 101607-6350 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 691 
ME076360 
INJECTION-PUMP ASSEMBLY
6D16
9 400 615 692 
ME076424 
INJECTION-PUMP ASSEMBLY
6D17
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 693 
ME076396 
INJECTION-PUMP ASSEMBLY
6D17
101607-6350  
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 694 
ME076397 
INJECTION-PUMP ASSEMBLY
6D15T3
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 710 
ME076417 
INJECTION-PUMP ASSEMBLY
6D16
9 400 615 695 
ME046050 
INJECTION-PUMP ASSEMBLY
6D16TL
F 019 Z10 390 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 391 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 696 
ME086721 
INJECTION-PUMP ASSEMBLY
6D31T
9 400 615 697 
ME046025 
INJECTION-PUMP ASSEMBLY
6D14T
Back to top