101607-1861 ZEXEL 9 400 615 648 BOSCH INJECTION-PUMP ASSEMBLY 9400615648 1016071861 me076865


 

Information injection-pump assembly

BOSCH 9 400 615 648 9400615648
ZEXEL 101607-1861 1016071861
MITSUBISHI ME076865 me076865
101607-1861 INJECTION-PUMP ASSEMBLY
Rating:
8
Buy INJECTION-PUMP ASSEMBLY 101607-1861 zexel genuine, new aftermarket engine parts with delivery

Service parts 101607-1861 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-8391
3. GOVERNOR 105931-9030
4. SUPPLY PUMP 105210-4661
5. AUTOM. ADVANCE MECHANIS 105672-5100
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105110-7062
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 15.7(160)/21.6(220)
13. NOZZLE-HOLDER 105041-3031
14. NOZZLE
15. NOZZLE SET 105019-0230

Include in #1:

101607-1861 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 615 648 9400615648
ZEXEL 101607-1861 1016071861
MITSUBISHI ME076865 me076865


Zexel num
Bosch num
Firm num
Name
101607-1861 
101607-6070 
9 400 615 648 
ME076865  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D16 K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-8420
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.2 3.15 3.25
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.7
Pump speed r/min   850 850 850
Each cylinder's injection qty mm3/st.   77.8 75.5 80.1
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   9.5+-0.5
Pump speed r/min   800 800 800
Each cylinder's injection qty mm3/st.   10.8 9.2 12.4
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.7)
Pump speed r/min   850 850 850
Average injection quantity mm3/st.   77.8 76.8 78.8
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.6
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   89.9 85.9 93.9
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   C
Rack position   R1-0.4
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   56.3 52.3 60.3
Fixing the lever   *
Injection quantity adjustment_06
Adjusting point   I
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   91 81 101
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1100--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1050
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   6 5.5 6.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101607-1861
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT
----------
T1=G75
----------

Speed control lever angle

Test data 101607-1861
F:Full speed I:Idle (1)Stopper bolt set position 'H'
----------

----------
a=18.5deg+-5deg b=41deg+-3deg

Stop lever angle

Test data 101607-1861
N:Engine manufacturer's normal use S:Stop the pump. (1)Set the stopper bolt at pump speed = aa and rack position = bb (non-injection rack position). Confirm non-injection. (2)After setting the stopper bolt, confirm non-injection at speed cc. Rack position = dd (non-injection rack position). (3)Rack position = approximately ee. (4)Free (at delivery)
----------
aa=1450r/min bb=7.2-0.5mm cc=275r/min dd=(8.8)mm ee=15mm
----------
a=36.5deg+-5deg b=(25deg) c=13deg+-5deg

0000001501 LEVER

Test data 101607-1861
(A) Idle (B) Full speed (C) Base lever (D) Accelerator lever (E) Accelerator lever delivery position 1. Measure speed lever angle (1)Measure the angle when the accelerator lever (D) contacted the base lever (C) at a.
----------

----------
b=41deg+-3deg c=18.5deg+-5deg

Timing setting

Test data 101607-1861
(1)Pump vertical direction (2)Position of timer's tooth at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=10deg
----------
a=(3deg)




Information:


Install Tooling (E). Tighten Tooling (E) to a torque of 9 1 N m (80 9 lb in).Note: The pump will not function while Tooling (E) is installed. Running the fuel injection pump with the tooling installed will result in pump damage and system contamination.
Illustration 6 g02025176
Disconnect harness assemblies (3).
Remove nut (5) and remove the clamp assembly. Discard the clamp assembly.
Loosen nuts (4) and (7). Remove the fuel line and discard the fuel line.
Disconnect hose assembly (6).
Illustration 7 g02029098
Disconnect tube assemblies (9).
Disconnect hose assemblies (10) and (11).
Remove bolts (8).
Illustration 8 g02029093
Disconnect tube assembly (12).
Illustration 9 g02025262
Remove bolts (13) and remove fuel pump (14).Installing the Fuel Injection Pump
Note: Check the O-ring seals, the gaskets, and the seals for wear or for damage. Replace the components, if necessary.
Illustration 10 g02385860
Service replacement pump
Note: Service replacement pump is shipped pinned with warning tag (Z) installed under pinch bolt (E).
Illustration 11 g02025262
Position fuel pump (14) and install bolts (13).
Illustration 12 g02029093
Connect tube assembly (12).
Illustration 13 g02029098
Install bolts (8).
Connect tube assembly (9) and connect both hose assemblies (10) and (11).
Illustration 14 g02025176Note: During installation, make sure that the fuel line caps remain in position until the fuel line is positioned near the corresponding ports in order to prevent contamination. Ensure that the areas around the rail and fuel lines are thoroughly clean before continuing this procedure. If any parts are worn or damaged, use new parts for replacement. Cleanliness is an important factor. Ensure that no debris gets introduced into the fuel system during the installation procedure. If any parts are worn or damaged, use new parts for replacement.
Connect harness assemblies (3).
Install a new fuel line. Hand tighten nuts (4) and (7).
Position the clamp assembly and install nut (5). Hand tighten the nut. Failure to place the grommet correctly on the fuel line could result in a failed fuel line.Note: Ensure that the fuel lines are centered in the nuts prior to tightening. Do not use excessive force or bending in order to assemble the fuel lines.
Tighten nut (4) at the fuel rail to a torque of 27 3 N m (239 27 lb in).
Tighten nut (7) to a torque of 27 3 N m (239 27 lb in).
Tighten nut (5) to a torque of 12 3 N m (105 27 lb in).
Illustration 15 g02351995
Remove Tooling (E) and warning tag (Z).Note: The pump will not function while Tooling (E) is installed. Running the fuel injection pump with the tooling installed will result in pump damage and system contamination.
Illustration 16 g02351981
Install O-ring seal (2) and plug (1). Tighten the plug to a torque of 9 1 N m (80 9 lb in).
Illustration 17 g02112896
Remove all tooling. Reinstall plug (X) into the timing hole that is located in the flywheel housing.
Connect Caterpillar Electronic Technician (ET). Perform a “Fuel System Functional Test ”and a “Fuel System Verification Test”.

Have questions with 101607-1861?





Group cross 101607-1861 ZEXEL

Mitsubishi 

9 400 615 643 
XE130116 
INJECTION-PUMP ASSEMBLY
6D17
9 400 615 644 
ME076692 
INJECTION-PUMP ASSEMBLY
6D16
9 400 615 645 
ME076693 
INJECTION-PUMP ASSEMBLY
6D15T2
9 400 615 646 
ME076694 
INJECTION-PUMP ASSEMBLY
6D15T2
9 400 615 647 
ME076876 
INJECTION-PUMP ASSEMBLY
6D16
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 613 502 
ME076869 
INJECTION-PUMP ASSEMBLY
6D17
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

101607-1861  

101607-6070 
9 400 615 648 
ME076865 
INJECTION-PUMP ASSEMBLY
6D16
F 01G 09U 05B 
 
INJECTION-PUMP ASSEMBLY
F 01G 09U 05C 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 649 
ME076884 
INJECTION-PUMP ASSEMBLY
6D15T3
F 01G 09U 05D 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 508 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 650 
ME076883 
INJECTION-PUMP ASSEMBLY
6D15T2
F 01G 09U 05E 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 615 651 
ME076868 
INJECTION-PUMP ASSEMBLY
6D16
Back to top