Information injection-pump assembly
BOSCH
9 400 615 638
9400615638
ZEXEL
101607-1720
1016071720
MITSUBISHI
ME047666
me047666

Rating:
Service parts 101607-1720 INJECTION-PUMP ASSEMBLY:
1.
_
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
12.
Open Pre:MPa(Kqf/cm2)
21.6(220)
15.
NOZZLE SET
Cross reference number
BOSCH
9 400 615 638
9400615638
ZEXEL
101607-1720
1016071720
MITSUBISHI
ME047666
me047666
Zexel num
Bosch num
Firm num
Name
101607-1720
9 400 615 638
ME047666 MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D16T * K
6D16T * K
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-5520
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Left L
Left L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left L
Left L
Injection order
1-5-3-6-
2-4
Pre-stroke
mm
4.2
4.15
4.25
Beginning of injection position
Governor side NO.1
Governor side NO.1
Difference between angles 1
Cal 1-5 deg. 60 59.5 60.5
Cal 1-5 deg. 60 59.5 60.5
Difference between angles 2
Cal 1-3 deg. 120 119.5 120.5
Cal 1-3 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cyl.1-2 deg. 240 239.5 240.5
Cyl.1-2 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-4 deg. 300 299.5 300.5
Cal 1-4 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
9.5
Pump speed
r/min
750
750
750
Average injection quantity
mm3/st.
105.1
101.6
108.6
Max. variation between cylinders
%
0
-3
3
Basic
*
Fixing the rack
*
Injection quantity adjustment_02
Adjusting point
B
Rack position
6.9+-0.5
Pump speed
r/min
250
250
250
Average injection quantity
mm3/st.
10.6
9.1
12.1
Max. variation between cylinders
%
0
-15
15
Fixing the rack
*
Timer adjustment
Pump speed
r/min
900++
Advance angle
deg.
0
0
0
Remarks
Do not advance until starting N = 900.
Do not advance until starting N = 900.
Timer adjustment_02
Pump speed
r/min
-
Advance angle
deg.
2
1.5
2.5
Remarks
Measure the actual speed, stop
Measure the actual speed, stop
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)Torque spring does not operate.
(3)Rack difference between N = N1 and N = N2
(4)Set at delivery
(5)Idle sub spring setting: L1.
----------
K=11 N1=700r/min N2=350r/min L1=4.5+-0.1mm
----------
----------
K=11 N1=700r/min N2=350r/min L1=4.5+-0.1mm
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Pump speed = aa
(2)Pump speed = bb
(3)At delivery
(4)Stopper bolt setting
----------
aa=900r/min bb=750r/min
----------
a=1deg+-5deg b=24deg+-5deg c=(2deg) d=5deg+-5deg
----------
aa=900r/min bb=750r/min
----------
a=1deg+-5deg b=24deg+-5deg c=(2deg) d=5deg+-5deg
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=26deg+-5deg b=53deg+-5deg
----------
----------
a=26deg+-5deg b=53deg+-5deg
Timing setting

(1)Pump vertical direction
(2)Position of gear mark '2' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=14deg
----------
a=(80deg)
----------
aa=14deg
----------
a=(80deg)
Information:
Illustration 1 g00293000
Junction Box-ETR Switchgear Required (OP, WT, OS)
(1) Electronic speed switch ("ESS").
(2) Lockwire (for seal screw plugs).
(3) Identification foil.
(4) Diode ("D4").
(5) Diode ("D3").
(6) Slave relay ("SR1").
(7) Slave relay ("SR2").
(8) Emergency stop switch ("ES").
(9) Circuit breakers.
Illustration 2 g00293001
Junction Box-ETS Switchgear Not Required (OP, WT, OS)
(1) Electronic speed switch ("ESS").
(2) Lockwire (for seal screw plugs).
(3) Identification foil.
(4) Slave relay ("SR1").
(5) Emergency stop switch ("ES").
(6) Time delay relay ("TD1").
(7) Start-stop switch ("SSS").
Illustration 3 g00293002
Junction Box-ETS Switchgear Required (OP, WT, OS)
(1) Electronic speed switch ("ESS").
(2) Lockwire (for seal screw plugs).
(3) Slave relay ("SR1").
(4) Emergency stop switch ("ES").
(5) Time delay relay ("TD1").
(6) Circuit breakers.
(7) Engine mounted start-stop switch ("EMSS."
Illustration 4 g00293003
Junction Box-ETS Switchgear Not Required (OP, WT)
(1) Time delay relay ("TD2").
(2) Emergency stop switch ("ES").
(3) Identification foil.
(4) Slave relay ("SR1").
(5) Slave relay ("SR2").
(6) Time delay relay ("TD1").
(7) Circuit breakers.
Illustration 5 g00293004
Junction Box With Start-stop Switch ("SSS")
(1) Emergency stop switch ("ES").
(2) Circuit breaker reset buttons.
(3) Start-stop switch ("SSS").
Illustration 6 g00293005
(1) Power distribution box. (2) Circuit breaker reset button.
Illustration 7 g00293006
(1) Hour meter.
Illustration 8 g00293007
(1) Air starting motor. (2) Air starting valve. (3) Air supply pipe.
Have questions with 101607-1720?
Group cross 101607-1720 ZEXEL
Mitsubishi
101607-1720
9 400 615 638
ME047666
INJECTION-PUMP ASSEMBLY
6D16T
6D16T