Information injection-pump assembly
BOSCH
9 400 615 624
9400615624
ZEXEL
101607-1572
1016071572
MITSUBISHI
ME076741
me076741

Rating:
Service parts 101607-1572 INJECTION-PUMP ASSEMBLY:
1.
_
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
ME076742
12.
Open Pre:MPa(Kqf/cm2)
15.7{160}/21.6{220}
14.
NOZZLE
Include in #1:
101607-1572
as INJECTION-PUMP ASSEMBLY
Include in #2:
104746-6625
as _
Cross reference number
BOSCH
9 400 615 624
9400615624
ZEXEL
101607-1572
1016071572
MITSUBISHI
ME076741
me076741
Zexel num
Bosch num
Firm num
Name
9 400 615 624
ME076741 MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D17 K 14BF INJECTION PUMP ASSY PE6AD PE
6D17 K 14BF INJECTION PUMP ASSY PE6AD PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-8420
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Left L
Left L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left L
Left L
Injection order
1-5-3-6-
2-4
Pre-stroke
mm
3.2
3.15
3.25
Beginning of injection position
Governor side NO.1
Governor side NO.1
Difference between angles 1
Cal 1-5 deg. 60 59.5 60.5
Cal 1-5 deg. 60 59.5 60.5
Difference between angles 2
Cal 1-3 deg. 120 119.5 120.5
Cal 1-3 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cyl.1-2 deg. 240 239.5 240.5
Cyl.1-2 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-4 deg. 300 299.5 300.5
Cal 1-4 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
-
Rack position
12
Pump speed
r/min
850
850
850
Each cylinder's injection qty
mm3/st.
85.1
82.5
87.7
Basic
*
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_02
Adjusting point
Z
Rack position
9.5+-0.5
Pump speed
r/min
800
800
800
Each cylinder's injection qty
mm3/st.
10.8
9.2
12.4
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_03
Adjusting point
A
Rack position
R1(12)
Pump speed
r/min
850
850
850
Average injection quantity
mm3/st.
85.1
84.1
86.1
Basic
*
Fixing the lever
*
Injection quantity adjustment_04
Adjusting point
B
Rack position
R1+0.85
Pump speed
r/min
1450
1450
1450
Average injection quantity
mm3/st.
99.9
95.9
103.9
Fixing the lever
*
Injection quantity adjustment_05
Adjusting point
I
Rack position
-
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
91
81
101
Fixing the lever
*
Rack limit
*
Timer adjustment
Pump speed
r/min
1150--
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
1100
Advance angle
deg.
0.5
Timer adjustment_03
Pump speed
r/min
1450
Advance angle
deg.
6
5.5
6.5
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Torque cam stamping: T1
(2)Tolerance for racks not indicated: +-0.05mm.
(3)RACK LIMIT
----------
T1=G43
----------
----------
T1=G43
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt setting
----------
----------
a=18.5deg+-5deg b=(42deg)+-3deg
----------
----------
a=18.5deg+-5deg b=(42deg)+-3deg
Stop lever angle

N:Engine manufacturer's normal use
S:Stop the pump.
(1)Set the stopper bolt at speed = aa and rack position = bb and confirm non-injection.
(2)After setting the stopper bolt, confirm non-injection at speed = cc and rack position = dd.
(3)Rack position = approximately ee.
(4)Free (at delivery)
----------
aa=1450r/min bb=7.2-0.5mm cc=275r/min dd=(8.8)mm ee=15mm
----------
a=36.5deg+-5deg b=(25deg) c=13deg+-5deg
----------
aa=1450r/min bb=7.2-0.5mm cc=275r/min dd=(8.8)mm ee=15mm
----------
a=36.5deg+-5deg b=(25deg) c=13deg+-5deg
0000001501 LEVER

(A) Idle
(B) Full speed
(C) Base lever
(D) Accelerator lever
(E) Accelerator lever delivery position
1. Measure speed lever angle
(1)Measure the angle when the accelerator lever (D) contacted the base lever (C) at a.
----------
----------
b=(42deg)+-3deg c=18.5deg+-5deg
----------
----------
b=(42deg)+-3deg c=18.5deg+-5deg
0000001601 MICRO SWITCH
Adjustment of the micro-switch
Adjust the bolt to obtain the following lever position when the micro-switch is ON.
(1)Speed N1
(2)Rack position Ra
----------
N1=400r/min Ra=9.2+-0.1mm
----------
----------
N1=400r/min Ra=9.2+-0.1mm
----------
Timing setting

(1)Pump vertical direction
(2)Position of timer's tooth at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=10deg
----------
a=(2deg)
----------
aa=10deg
----------
a=(2deg)
Information:
PROBLEM
On certain C175-16 and C175-20 Generator Sets the 276-1242 4 pin connector that connects the engine harness to the individual cylinder injector harnesses may not be fully latched do to a damaged connector locking tab.
AFFECTED PRODUCT
Model Identification Number
C175-16 WYB00649-00652, 656, 664-665, 1231-1232, 1237, 1241, 1243, 1249, 1253-1254, 1413, 1417, 1424, 1426, 1431, 1434, 1436, 1438, 1476, 1478-1484, 1508, 1564, 1566, 1569-1570, 1573-1574, 1578, 1610, 1612, 1614, 1622, 1625, 1627, 1630, 1825-1826, 1840-1841, 1846-1853, 1857-1860, 1862-1863, 1869-1871, 1873, 1876-1878, 1885, 1888-1891, 1895, 1899, 1904-1909, 1911, 1914-1920, 1925-1927, 1929, 1931-1932, 1936-1940, 1954, 1956, 1958, 2075, 2084, 2087-2088, 2091-2092, 2095-2096, 2098, 2100-2105, 2108-2109, 2112-2113, 2115-2116, 2118, 2127-2129, 2136-2142, 2179, 2182-2185, 2189, 2192-2193, 2195-2196, 2198, 2200, 2203, 2206-2209, 2214, 2227, 2229, 2232-2233, 2244, 2246, 2248-2257, 2332, 2337, 2342, 2352-2353, 2355-2356, 2359, 2362-2364, 2370-2371, 2416, 2437, 2470, 2475, 2479, 2481, 2493, 2500
C175-20 BXR01781, 1798-1807, 1809, 1826, 1828, 1944-1950, 1953-1956, 1959-1960, 1962, 2013-2014, 2026-2027, 2029, 2036, 2042-2046, 2048-2050, 2055-2058
PARTS NEEDED
Qty
Part Number Description
1 4C6389 TUBING-HEAT SHRI
1 1134630 RECEPTACLE AS
1 2300940 SEAL-PIP
1 2761242 KIT-PLUG CONN
In order to allow equitable parts availability to all participating dealers, please limit your initial parts order to not exceed 1% of dealership population. This is an initial order recommendation only, and the ultimate responsibility for ordering the total number of parts needed to satisfy the program lies with the dealer.
ACTION REQUIRED
1. Inspect 276-1242 4 pin engine harness connector and check the connector locking tab for proper engagement with injector harness receptacle. Image 1 is a damaged locking tab. Image 2 is a good locking tab. If locking tab is found to be damage proceed with replacement.
2. Disconnect the 276-1242 4 pin engine harness connector from the 113-4630 injector harness receptacle at the cylinder head.
3. Remove and replace 276-1242 4 pin connector with new. Insure to reinstall 4C-6389 heat shrink on the connector.
4. Inspect the inside of 113-4630 injector harness receptacle mounted on cylinder head for debris, damage, or paint. If debris, damage, or paint is present, remove and replace 113-4630 injector harness receptacle with new.
Note: Always use a new valve cover gasket if removal of valve cover is required.
5. Reconnect new 276-1242 4 pin engine harness connector to the new 113-4630 injector harnesses receptacle. Insure the connector is fully seated, audible click is heard, lock tab in the proper position, and connector cannot be pulled out.
Image1
Image2
SERVICE CLAIM ALLOWANCES
Product smu/age whichever comes first Caterpillar Dealer Suggested Customer Suggested
Parts % Labor Hrs% Parts % Labor Hrs% Parts % Labor Hrs%
0-600 hrs,
0-45 mo 100.0% 100.0% 0.0% 0.0% 0.0% 0.0%
This is a 1.0-hour job
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.