101606-9930 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016069930 1671395271


 

Information injection-pump assembly

ZEXEL 101606-9930 1016069930
NISSAN-DIESEL 1671395271 1671395271
101606-9930 INJECTION-PUMP ASSEMBLY
Rating:
48
Buy INJECTION-PUMP ASSEMBLY 101606-9930 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101606-9930 
101607-9240 
 
1671395271  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
NE6 * K




Information:

Start By:a. remove cylinder head assemblyb. remove engine balancer group (3114 Engines)c. remove oil pump (3116 Engines)d. remove piston cooling tubes 1. Check the connecting rods and caps for their identification and location in the engine. The connecting rods are to be marked (only by etching) with the number of the cylinder in which they are used. Rods and caps are to be marked on the same side of the rod in relation to the bearing retainer notch.2. Remove rod cap nuts (1) and rod bearing cap (2) from the connecting rod. Remove the lower half of the bearing from the rod bearing cap.
To protect the crankshaft from the threaded portion of the connecting rod bolts, cut short pieces of rubber hose, and install them over the threaded portion of the bolts as shown in Photo C20235P1.
3. Carefully remove the piston and connecting rod from the cylinder block. Remove the upper half of the bearing from the connecting rod.4. Remove the remainder of the pistons and connecting rods as in Steps 1 through 3. The following steps are for the installation of the pistons and connecting rod assemblies. 5. Position the piston ring end gaps 120 degrees apart. Install Tool (A) on the piston as shown.6. Be sure the short pieces of rubber hose are installed on the connecting rod bolts. Install the connecting rod and piston group with the rod forging part number facing to the rear of the engine. The rear of the engine is the flywheel end. Thoroughly lubricate the piston crown, piston skirt and the cylinder bore with clean engine oil just prior to installation of the piston group in the cylinder block.7. With the number one crankshaft throw at bottom center, carefully install the piston and connecting rod assembly in the cylinder block. 8. Put the connecting rod in alignment with the crankshaft. Using a rubber mallet, tap the piston into the cylinder bore until Tool (A) comes off of the piston.9. Before the connecting rod comes in contact with the crankshaft, install the upper half of the rod bearing. Be sure the bearing tab engages with the groove in the connecting rod.10. Apply clean engine oil on the upper rod bearing. Continue tapping the piston down, guiding the connecting rod onto the crankshaft.11. Position the lower half of the rod bearing in the corresponding numbered rod bearing cap. Be sure the bearing tab engages with the groove in the rod bearing cap.13. Put clean engine oil on the lower rod bearing surface. Install the rod bearing cap on the connecting rod with the number on the bearing cap on the same side and same number as on the connecting rod.14. Tighten the connecting rod bolts as follows: a. Put clean engine oil on the bolt threads, and all surfaces that make contact between the bolts and cap.b. Tighten

Have questions with 101606-9930?





Group cross 101606-9930 ZEXEL

Nissan-Diesel 

 
1671395274 
INJECTION-PUMP ASSEMBLY
NE6TA
 
16713Z6319 
INJECTION-PUMP ASSEMBLY
FE6E
9 400 615 583 
1670095077 
INJECTION-PUMP ASSEMBLY
NE6
101606-9930  

101607-9240 
 
1671395271 
INJECTION-PUMP ASSEMBLY
NE6
 
16713Z6308 
INJECTION-PUMP ASSEMBLY
FE6A
 
16713Z6309 
INJECTION-PUMP ASSEMBLY
FE6B
 
16713Z6318 
INJECTION-PUMP ASSEMBLY
FE6A
 
16713Z6373 
INJECTION-PUMP ASSEMBLY
FE6A
 
16713Z6360 
INJECTION-PUMP ASSEMBLY
FE6E

Dpico 

F 019 Z10 999 
 
INJECTION-PUMP ASSEMBLY
6D22
F 019 Z20 000 
 
INJECTION-PUMP ASSEMBLY
6D22
Back to top