101606-9710 ZEXEL 9 400 615 579 BOSCH INJECTION-PUMP ASSEMBLY 9400615579 1016069710 16713z6262


 

Information injection-pump assembly

BOSCH 9 400 615 579 9400615579
ZEXEL 101606-9710 1016069710
NISSAN-DIESEL 16713Z6262 16713z6262
101606-9710 INJECTION-PUMP ASSEMBLY
Rating:
19
Buy INJECTION-PUMP ASSEMBLY 101606-9710 zexel genuine, new aftermarket engine parts with delivery

Service parts 101606-9710 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-5040
3. GOVERNOR 105921-5651
4. SUPPLY PUMP 105220-7010
5. AUTOM. ADVANCE MECHANIS 105672-0270
6. COUPLING PLATE 105662-1370
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6690
11. Nozzle and Holder 16600Z5519
12. Open Pre:MPa(Kqf/cm2) 19.6(200)
13. NOZZLE-HOLDER 105031-4650
14. NOZZLE 105015-6380
15. NOZZLE SET

Include in #1:

101606-9710 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

Zexel num
Bosch num
Firm num
Name
101606-9710 
9 400 615 579 
16713Z6262  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FE6B * K




Information:

1. Remove cylinder head assembly mounting bolts (1) and (2).
To prevent damage to the cylinder head assembly-to-spacer block dowels, keep the head assembly level during removal.
2. Fasten a hoist to the cylinder head assembly as shown. Lift the cylinder head assembly off of the spacer block. The approximate weight of the cylinder head is 236 kg (520 lb).3. Remove the cylinder head assembly gasket from the spacer block. The following steps are for the installation of the cylinder head assembly.4. Thoroughly clean the mating surfaces of the cylinder head assembly and the spacer block.5. Install the head gasket on the spacer block.6. Fasten a hoist to the cylinder head assembly. Position the cylinder head assembly on the dowels in the spacer block. Lower the cylinder head assembly onto the spacer block.7. Put clean engine oil on the threads of bolts (1) and (2) that hold the cylinder head assembly in position. Install bolts (1) and (2).
Cylinder Head Assembly Tightening Sequence8. Tighten cylinder head assembly mounting bolts (1) and (2) as follows:a. Put 2P2506 Thread Lubricant on the threads of bolts (1) and (2).b . Tighten bolts 1 through 26 in numerical sequence shown to a torque of 150 15 N m (110 11 lb ft).c. Tighten bolts 1 through 26 in numerical sequence shown to a torque of 275 15 N m (200 11 lb ft).d. Retorque bolts 1 through 26 in numerical sequence shown to 275 15 N m (200 11 lb ft).e. Tighten bolts 27 through 33 in numerical sequence shown to a torque of 25 7 N m (18 5 lb ft).End By:a. install valve cover baseb. install (EUI) fuel injectorsc. install rocker arm assemblies and push rodsd. install water outlet manifolde. install exhaust manifold

Have questions with 101606-9710?





Group cross 101606-9710 ZEXEL

F 019 Z10 607 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16713Z6261 
INJECTION-PUMP ASSEMBLY
FE6B
101606-9710  
9 400 615 579 
16713Z6262 
INJECTION-PUMP ASSEMBLY
FE6B
 
1671395261 
INJECTION-PUMP ASSEMBLY
NE6TA
9 400 615 580 
1670095075 
INJECTION-PUMP ASSEMBLY
NE6
 
1671395219 
INJECTION-PUMP ASSEMBLY
NE6
9 400 615 581 
1670095076 
INJECTION-PUMP ASSEMBLY
NE6
 
16713Z6265 
INJECTION-PUMP ASSEMBLY
FE6A
 
1671395273 
INJECTION-PUMP ASSEMBLY
NE6TA
 
16713Z6269 
INJECTION-PUMP ASSEMBLY
D539X

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
6D22
F 019 Z10 996 
 
INJECTION-PUMP ASSEMBLY
6D22
Back to top