101606-9590 ZEXEL F 019 Z20 476 BOSCH INJECTION-PUMP ASSEMBLY f019z20476 1016069590 16713z6176


 

Information injection-pump assembly

BOSCH F 019 Z20 476 f019z20476
ZEXEL 101606-9590 1016069590
NISSAN-DIESEL 16713Z6176 16713z6176
101606-9590 INJECTION-PUMP ASSEMBLY
Rating:
8
Buy INJECTION-PUMP ASSEMBLY 101606-9590 zexel genuine, new aftermarket engine parts with delivery

Service parts 101606-9590 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-3440
3. GOVERNOR 105921-2273
4. SUPPLY PUMP 105220-7050
5. AUTOM. ADVANCE MECHANIS 105614-3401
6. COUPLING PLATE 105661-1130
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6690
11. Nozzle and Holder 16600-Z5519
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105031-4650
14. NOZZLE 105015-6380
15. NOZZLE SET

Include in #1:

101606-9590 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

Zexel num
Bosch num
Firm num
Name
101606-9590 
101607-9160 
F 019 Z20 476 
16713Z6176  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FE6B * K 14BE PE6A PE




Information:

(1) End play for shaft (new) ... 0.102 0.025 mm (.004 .001 in) Maximum permissible end play (worn) ... 0.20 mm (.008 in)(2) Thickness of thrust bearing (where thrust rings contact bearing) ... 5.36 0.03 mm (.211 .001 in)(3) Diameter of shaft (new) ... 12.697 to 12.705 mm (.4999 to .5002 in) Bore in the bearing (new) ... 12.741 to 12.748 mm (.5016 to .5019 in)Maximum permissible clearance between bearing and shaft (worn) ... 0.05 mm (.002 in)(4) Maximum permissible gap of oil seal ring, measured in bore of housing ... 0.25 mm (.010 in)
The impeller shaft nut is a left hand thread (CCW).
(5) Install the compressor wheel (at room temperature) as follows: a. Put compressor wheel on the shaft.b. Put a small amount of clean engine oil on the threads.c. Tighten the nut (CCW) to 14 to 17 N m (125 to 150 lb in).d. Loosen the nut and tighten again to 9 N m (80 lb in) plus an additional 60 degrees (1/6 turn).
Do not bend or add stress to the shaft when the nut is loosened or tightened.
(6) Thickness of each thrust ring ... 2.553 0.013 mm (.1005 .0005 in)(7) Bore in housing (new) ... 20.744 to 20.757 mm (.8167 to .8172 in) Outside diameter of the bearing (new) ... 20.630 to 20.643 mm (.8122 to .8127 in)Maximum permissible clearance between bearing and bore in housing (worn) ... 0.15 mm (.006 in)Torque for four nuts (put 5P3931 Anti-Seize Compound on threads) and bolts that hold turbocharger to exhaust manifold ... 55 5 N m (40 4 lb ft)Install the band clamps to hold the cartridge to the compressor housing as follows: a. Tighten clamps to ... 14 1.1 N m (125 10 lb in)b. Tap (hit) clamp lightly all around.c. Tighten again to ... 14 1.1 N m (125 10 lb in) Put clean engine oil in the oil inlet of the turbocharger after assembly or before installation to provide start up lubrication and/or storage protection.

Have questions with 101606-9590?





Group cross 101606-9590 ZEXEL

Nissan-Diesel 

 
16713Z6170 
INJECTION-PUMP ASSEMBLY
FE6B
9 400 615 568 
16713Z6171 
INJECTION-PUMP ASSEMBLY
FE6B
F 019 Z20 475 
16713Z6172 
INJECTION-PUMP ASSEMBLY
FE6B
 
16713Z6173 
INJECTION-PUMP ASSEMBLY
FE6B
9 400 615 569 
16700Z5712 
INJECTION-PUMP ASSEMBLY
FE6B
9 400 615 570 
16700Z5713 
INJECTION-PUMP ASSEMBLY
FE6B
9 400 615 571 
16700Z5714 
INJECTION-PUMP ASSEMBLY
FE6B
 
16713Z6174 
INJECTION-PUMP ASSEMBLY
FE6B
9 400 615 572 
16713Z6175 
INJECTION-PUMP ASSEMBLY
FE6B
101606-9590  

101607-9160 
F 019 Z20 476 
16713Z6176 
INJECTION-PUMP ASSEMBLY
FE6B
Back to top