101606-9410 ZEXEL F 019 Z10 369 BOSCH INJECTION-PUMP ASSEMBLY f019z10369 1016069410 16790z5600


 

Information injection-pump assembly

BOSCH F 019 Z10 369 f019z10369
ZEXEL 101606-9410 1016069410
NISSAN-DIESEL 16790Z5600 16790z5600
101606-9410 INJECTION-PUMP ASSEMBLY
Rating:
8
Buy INJECTION-PUMP ASSEMBLY 101606-9410 zexel genuine, new aftermarket engine parts with delivery

Service parts 101606-9410 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-9430
3. GOVERNOR 105400-7890
4. SUPPLY PUMP 105220-7050
5. AUTOM. ADVANCE MECHANIS 105671-0420
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-5511
11. Nozzle and Holder 16600Z5511
12. Open Pre:MPa(Kqf/cm2) 19.6(200)
13. NOZZLE-HOLDER 105031-4520
14. NOZZLE 105015-5170
15. NOZZLE SET

Include in #1:

101606-9410 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 019 Z10 369 f019z10369
ZEXEL 101606-9410 1016069410
NISSAN-DIESEL 16790Z5600 16790z5600


Zexel num
Bosch num
Firm num
Name
101606-9410 
F 019 Z10 369 
16790Z5600  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FD606 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3 2.95 3.05
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.2
Pump speed r/min   1350 1350 1350
Average injection quantity mm3/st.   62 61 63
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   7.5+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   8.2 7.2 9.2
Max. variation between cylinders %   0 -12 12
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   12+-0.1
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   71 61 81
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1250--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1200
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   2.5 2 3
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101606-9410
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT: RAL (4)Set idle sub-spring (5)Main spring setting
----------
K=18 RAL=12+-0.1mm
----------

Speed control lever angle

Test data 101606-9410
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=22deg+-5deg b=23deg+-5deg

Stop lever angle

Test data 101606-9410
N:Pump normal S:Stop the pump.
----------

----------
a=19deg+-5deg b=53deg+-5deg

0000001501 GOV FULL LOAD ADJUSTMENT

Test data 101606-9410
Title1:Full load stopper adjustment Title2:Governor set speed LABEL1:Distinguishing LABEL2:Pump speed (r/min) LABEL3:Ave. injection quantity (mm3/st) LABEL4:Max. var. bet. cyl. LABEL5:Remarks LABEL6:Distinguishing LABEL7:Governor set speed (r/min) LABEL8:Remarks (1)Adjustment conditions are the same as those for measuring injection quantity. (2)-
----------

----------
a1=M a2=F r1=1350r/min r2=1350r/min Q1=62+-1mm3/st Q2=54+-1mm3/st c1=+-2.5% c2=+-2.5% a3=M a4=F r3=1400r/min r4=1350r/min

Timing setting

Test data 101606-9410
(1)Pump vertical direction (2)Position of gear mark 'G' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=15deg
----------
a=(60deg)




Information:

1. Disconnect plug P7 from receptacle J7. Check the connections for damaged wires or pins and corrosion. Also check that the pins are at the proper height in the connector. Check that the wires and pins are tight in the connectors by pulling (slightly) on each wire of each connector (including the breakout "T").2. Install the 9X1160 Adapter (forty pin breakout "T") between J7 and P7 and secure the connections.3. Connect the voltmeter as shown. Check for the appropriate voltages between the lettered "T" pins as explained in Steps 4 through 18.4. Check system voltage.Pin 1 (+) to pin 2 (ground) system voltage should be approximately 12 volts DC with key on (no accessories). Minimum voltage is 11.0 volts DC. While cranking the voltage should be 8 to 12 volts DC. Diagnosis - Using the truck wiring schematic, check wires 1 and 2 and connections from J7 through the truck wiring harness back to the battery terminals for proper voltage.5. Check voltage drop from battery.If the voltage check between pins 1 and 2 on P7 is less than 11.0 volts with the key on, check the voltage drop from pin 2 of the J7 connector to the negative battery post while cranking. For this test, the common lead (black) should be connected to the negative battery post first. Then place the positive (red) lead into pin 2. (Pin 2 is chassis ground). Voltage should be less than .5 volts DC when cranking. Diagnosis - If voltage drop is greater than .5 volts DC, check wire 2 and connections (including the battery post connections) from J7 to battery negative.6. Parking BrakePin 11 (parking brake) to 2 (ground):* Less than .5 volts DC with the key on and parking brake applied.* More than 4.5 volts DC with the key on and parking brake released. Diagnosis - Disconnect breakout "T" and check the individual switch circuits for open, ground or faulty switch. Switch circuit must have less than 10 ohms resistance and more than 20,000 ohms resistance to chassis ground.7. Check brake switch.Pin 30 (brake switch) to 2:* Less than .5 volts DC with the key on.* More than 4.5 volts DC with brake pedal applied and the key on. Diagnosis - Disconnect breakout "T" and check the individual switch circuits for open, ground or faulty switch. Switch circuit must have less than 2.5 ohms resistance and more than 5000 ohms resistance to chassis ground.8. Check vehicle speed buffer.When testing for speedometer problems on trucks that have a single sensor with a single winding for vehicle speed, also follow J14 tests 6, 7 and 8.A. Disconnect the two buffer input wires from the Vehicle Speed Sensor. Using a long jumper wire, connect the white input wire to P7 Pin 1 (+ battery).* With key ON, engine OFF, measure voltage from P7 Pin 33 (vehicle speed) and P7

Have questions with 101606-9410?





Group cross 101606-9410 ZEXEL

9 400 619 523 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

101606-9410  
F 019 Z10 369 
16790Z5600 
INJECTION-PUMP ASSEMBLY
FD606
F 019 Z10 370 
16713Z6160 
INJECTION-PUMP ASSEMBLY
FE6E
9 400 615 563 
16713Z6908 
INJECTION-PUMP ASSEMBLY
FE6E
 
16713Z6167 
INJECTION-PUMP ASSEMBLY
FE6E

Hyundai 

9 400 615 564 
3310083C25 
INJECTION-PUMP ASSEMBLY
6D22

Nissan-Diesel 

9 400 615 565 
16790Z5601 
INJECTION-PUMP ASSEMBLY
FD606
9 400 619 555 
 
INJECTION-PUMP ASSEMBLY

Dpico 

9 400 613 053 
 
INJECTION-PUMP ASSEMBLY
EM100

Nissan-Diesel 

 
16713Z6178 
INJECTION-PUMP ASSEMBLY
FE6E
9 400 615 566 
16700Z5709 
INJECTION-PUMP ASSEMBLY
FE6B
9 400 615 567 
16700Z5710 
INJECTION-PUMP ASSEMBLY
FE6B
Back to top