101606-9390 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016069390 16713z6115


 

Information injection-pump assembly

ZEXEL 101606-9390 1016069390
NISSAN-DIESEL 16713Z6115 16713z6115
101606-9390 INJECTION-PUMP ASSEMBLY
Rating:
86
Buy INJECTION-PUMP ASSEMBLY 101606-9390 zexel genuine, new aftermarket engine parts with delivery

Service parts 101606-9390 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-5270
3. GOVERNOR 105921-7050
4. SUPPLY PUMP 105220-7010
5. AUTOM. ADVANCE MECHANIS 105614-3600
6. COUPLING PLATE 105662-1340
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6890
11. Nozzle and Holder 16600-Z5609
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105030-3490
14. NOZZLE 105015-9460
15. NOZZLE SET

Include in #1:

101606-9390 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101606-9390 1016069390
NISSAN-DIESEL 16713Z6115 16713z6115


Zexel num
Bosch num
Firm num
Name
101606-9390 
101606-9420 
 
16713Z6115  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FE6E * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   134424-1520
Overflow valve opening pressure kPa   162 147 177
Overflow valve opening pressure kgf/cm2   1.65 1.5 1.8
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.7 3.65 3.75
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.5
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   78 76.4 79.6
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   275 275 275
Average injection quantity mm3/st.   12.5 10.7 14.3
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.5)
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   78 77 79
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-0.05
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   87.5 83.5 91.5
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   C
Rack position   R1-0.35
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   63 59.8 66.2
Fixing the lever   *
Injection quantity adjustment_06
Adjusting point   I
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   105 105 115
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   (1087)
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1200
Advance angle deg.   1.5 1 2
Timer adjustment_03
Pump speed r/min   1500
Advance angle deg.   5.5 5 6
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101606-9390
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT
----------
T1=J01
----------

Speed control lever angle

Test data 101606-9390
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=39mm
----------
a=17deg+-5deg b=34.5deg+-3deg

Stop lever angle

Test data 101606-9390
N:Pump normal S:Stop the pump. (1)Use the pin at R = aa
----------
aa=42mm
----------
a=40deg+-5deg b=25deg+-5deg

0000001501 LEVER

Test data 101606-9390
(a) Speed lever (B) Accelerator lever (C) Accelerator lever stopper bolt 1. Accelerator lever setting method With the speed lever in the idling position, back off the accelerator lever stopper bolt L1 from where it contacts point a. (Back off 1+0.5 turns and set.)
----------
L1=1+0.5mm
----------

Timing setting

Test data 101606-9390
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(60deg)




Information:

7. Remove inner fuel lines (13). 8. Remove Jacobs washers (14) and Jacobs shims (15) from the Jacobs stud assemblies. 9. Remove bolt (17) and two Jacobs stud assemblies (16) that hold the rocker shaft assembly to the head. Remove rocker shaft assembly (18). 10. Remove Jacobs exhaust valve bridges (20) from the exhaust valves only. The intake valves have the Caterpillar intake valve bridges. Remove the Caterpillar intake valve bridges (19).Install Jacobs Engine Brake
Do each step for each end of the engine. The front half is shown.1. Put clean engine oil on the bridges and dowels.2. Install Jacobs exhaust valve bridges (20) and the Caterpillar intake valve bridges (19) on the dowels.3. Keep hand pressure on the bridges, and turn the adjustment screw clockwise until contact is made with the valve stem. Turn the screw an extra 20° to 30°. This will make the dowel straight in the guide and compensate for gap (slack) in the threads. Hold the adjustment screw in this position, and tighten the locknut to a torque of 28 4 N m (21 3 lb.ft.). 4. Put rocker shaft assembly (18) in position on the cylinder head. 5. Install Jacobs washers (21) on the Jacobs stud assemblies (16). Put clean oil on the threads, and install washer and bolt (17) and Jacobs stud assemblies (16). Tighten the center bolt and Jacobs stud assemblies in increments of 70 N m (50 lb.ft.) each until a final torque of 450 N m (330 lb.ft.) is obtained.6. Make an adjustment to the valves to have a clearance of .015 (0.38 mm) for the intake valves and .030 (0.76 mm) for the exhaust valves. Tighten the locknuts to a torque of 28 4 N m (21 3 lb.ft.), and check the valve clearance again. See Testing And Adjusting for the correct procedure. 7. Install a new Jacobs O-ring seal (22) on the Jacobs oil supply adapter in the rocker shaft assembly. Put clean oil on the Jacobs O-ring seal.
Do not cause damage to the O-ring seals on the inner fuel lines.
8. Install inner fuel lines (13). Tighten the fuel line nuts to a torque of 40 7 N m (30 5 lb.ft.) with tooling (A) and (B). The Jacobs brake for the 3406B Truck Engine has only one support bracket (11).9. Put jacobs support brackets (11) in position as shown. Put oil on the threads of Jacobs bolts (12). Install the washers on the Jacobs bolts. Install Jacobs bolts (12) that hold the Jacobs support bracket in place. Tighten the Jacobs bolts to a torque of 450 N m (330 lb.ft.). 10. Install Jacobs washers (14) on the Jacobs stud assemblies.
Be extra careful not to cause damage to the Jacobs oil supply adapter O-ring seal when the Jacobs brake housing assembly is installed.
The brake housing assembly with the mark "FRONT" on it must be installed on the front three cylinders. The brake housing assembly with the mark "REAR" must be installed

Have questions with 101606-9390?





Group cross 101606-9390 ZEXEL

Hyundai 

 
 
INJECTION-PUMP ASSEMBLY
6D22
 
 
INJECTION-PUMP ASSEMBLY
6D22
 
 
INJECTION-PUMP ASSEMBLY
6D22

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
6D22
F 019 Z10 994 
 
INJECTION-PUMP ASSEMBLY
6D22

Hyundai 

 
 
INJECTION-PUMP ASSEMBLY
6D22
 
 
INJECTION-PUMP ASSEMBLY
6D22
 
 
INJECTION-PUMP ASSEMBLY
6D22

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
6D22
F 019 Z10 995 
 
INJECTION-PUMP ASSEMBLY
6D22

Nissan-Diesel 

 
16713Z6108 
INJECTION-PUMP ASSEMBLY
FE6A
9 400 615 561 
16713Z6109 
INJECTION-PUMP ASSEMBLY
FE6B

Hyundai 

 
 
INJECTION-PUMP ASSEMBLY
6D22
 
 
INJECTION-PUMP ASSEMBLY
6D22
 
 
INJECTION-PUMP ASSEMBLY
6D22
 
 
INJECTION-PUMP ASSEMBLY
6D22
 
 
INJECTION-PUMP ASSEMBLY
6D16
 
 
INJECTION-PUMP ASSEMBLY
6D16

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
6D16

Hyundai 

 
 
INJECTION-PUMP ASSEMBLY
6D16
 
 
INJECTION-PUMP ASSEMBLY
6D16

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
6D16
 
 

Nissan-Diesel 

 
16713Z6114 
INJECTION-PUMP ASSEMBLY
FE6E
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16713Z6210 
INJECTION-PUMP ASSEMBLY
FE6E
9 400 615 562 
16713Z6907 
INJECTION-PUMP ASSEMBLY
FE6E
101606-9390  

101606-9420 
 
16713Z6115 
INJECTION-PUMP ASSEMBLY
FE6E
Back to top