101606-6862 ZEXEL 9 400 615 541 BOSCH INJECTION-PUMP ASSEMBLY 9400615541 1016066862 me086598


 

Information injection-pump assembly

BOSCH 9 400 615 541 9400615541
ZEXEL 101606-6862 1016066862
MITSUBISHI ME086598 me086598
101606-6862 INJECTION-PUMP ASSEMBLY
Rating:
16
Buy INJECTION-PUMP ASSEMBLY 101606-6862 zexel genuine, new aftermarket engine parts with delivery

Service parts 101606-6862 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-9530
3. GOVERNOR 105921-4391
4. SUPPLY PUMP 105220-7110
5. AUTOM. ADVANCE MECHANIS 105676-0760
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-4310
11. Nozzle and Holder ME086575
12. Open Pre:MPa(Kqf/cm2) 17.7{180}
13. NOZZLE-HOLDER 105048-3000
14. NOZZLE 105017-0240
15. NOZZLE SET

Include in #1:

101606-6862 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 615 541 9400615541
ZEXEL 101606-6862 1016066862
MITSUBISHI ME086598 me086598


Zexel num
Bosch num
Firm num
Name
101606-6862 
9 400 615 541 
ME086598  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D31 K 14BE INJECTION PUMP ASSY PE6A PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-6720
Overflow valve opening pressure kPa   191 157 225
Overflow valve opening pressure kgf/cm2   1.95 1.6 2.3
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   10.3
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   41.1 40.1 42.1
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   275 275 275
Average injection quantity mm3/st.   8.3 7 9.6
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(10.3)
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   41.1 40.1 42.1
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.15
Pump speed r/min   1600 1600 1600
Average injection quantity mm3/st.   47.6 43.6 51.6
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   C
Rack position   R1+0.2
Pump speed r/min   650 650 650
Average injection quantity mm3/st.   37.3 33.3 41.3
Fixing the lever   *
Injection quantity adjustment_06
Adjusting point   D
Rack position   (R1+0.75 )
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   34.4 30.4 38.4
Fixing the lever   *
Injection quantity adjustment_07
Adjusting point   E
Rack position   (R1+0.57 )
Pump speed r/min   550 550 550
Average injection quantity mm3/st.   35.8 31.8 39.8
Fixing the lever   *
Timer adjustment
Pump speed r/min   1380+-50
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1600
Advance angle deg.   4.5 4 5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101606-6862
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT: RAL
----------
T1=F23 RAL=13.6+-0.1mm
----------

Speed control lever angle

Test data 101606-6862
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=40mm
----------
a=26deg+-5deg b=(36deg)+-3deg

Stop lever angle

Test data 101606-6862
N:Engine manufacturer's normal use S:Stop the pump. (1)Free (at shipping) (2)Use the hole at R = aa (3)Rack position corresponding to bb (4)Set the stopper bolt at speed = cc and rack position = dd. (5)After setting the stopper bolt, confirm non-injection at speed ee. (Rack position = ff or less)
----------
aa=40mm bb=16mm cc=1700r/min dd=6.5-0.5mm ee=275r/min ff=8mm
----------
a=8deg+-5deg b=15deg+-5deg c=25deg+-5deg

Timing setting

Test data 101606-6862
(1)Pump vertical direction (2)Position of gear mark '3' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=10deg
----------
a=(130deg)




Information:

Start By:a. remove timing gear coverb. remove fuel injection pump housing governor 1. Remove four bolts (2), plate (3) and idler gear (1). 2. If the camshaft is not going to be removed, use tooling (A) to remove camshaft gear (4).
Do not turn the crankshaft with the camshaft gear removed. Damage can be caused to the pistons and valves, or both.
3. Remove bolts (5) that hold timing gear plate (6) to the cylinder block.4. Remove timing gear plate (6). 5. Use tooling (B) to remove the bearing from the idler gear. The following steps are for the installation of the timing gears and plate.6. Install a new gasket on the timing gear plate.7. Put timing gear plate (6) in position on the cylinder block, and install the bolts that hold the timing gear plate to the cylinder block.8. Heat camshaft gear (4) to a maximum temperature of 315° C (600° F), and install it on the camshaft.9. Use tooling (B), and install the bearing in the idler gear. Set the gear on the front face, (face with timing marks). Drive the bearing from the rear face toward the front face of the gear. Install the bearing to a depth of 1.5 0.5 mm (.06 .02 in.) below the rear face of the idler gear.10. Install the idler gear, plate and bolts. Be sure No. 1 cylinder is at top center on the compression stroke. Install the idler gear so "V" mark (7) on the idler gear is in alignment with the "V" mark on the crankshaft gear. "K" marks (8) of the camshaft gear can be seen at the outer edges of the idler gear.End By:a. install fuel injection pump housing and governorb. install timing gear cover

Have questions with 101606-6862?





Group cross 101606-6862 ZEXEL

Mitsubishi 

 
ME076552 
INJECTION-PUMP ASSEMBLY
6D16
F 01G 09U 04P 
ME076578 
INJECTION-PUMP ASSEMBLY
6D16
F 01G 09U 04R 
ME076580 
INJECTION-PUMP ASSEMBLY
6D16
9 400 615 538 
ME076568 
INJECTION-PUMP ASSEMBLY
6D14
9 400 615 539 
ME076569 
INJECTION-PUMP ASSEMBLY
6D16
9 400 615 540 
ME076570 
INJECTION-PUMP ASSEMBLY
6D14
101606-6862  
9 400 615 541 
ME086598 
INJECTION-PUMP ASSEMBLY
6D31
9 400 615 542 
ME047582 
INJECTION-PUMP ASSEMBLY
6D14T
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 613 374 
ME086583 
INJECTION-PUMP ASSEMBLY
6D31T
9 400 615 543 
ME056854 
INJECTION-PUMP ASSEMBLY
6D22
Back to top