101606-6730 ZEXEL F 01G 09U 04M BOSCH INJECTION-PUMP ASSEMBLY f01g09u04m 1016066730 me076547


 

Information injection-pump assembly

BOSCH F 01G 09U 04M f01g09u04m
ZEXEL 101606-6730 1016066730
MITSUBISHI ME076547 me076547
101606-6730 INJECTION-PUMP ASSEMBLY
Rating:
81
Buy INJECTION-PUMP ASSEMBLY 101606-6730 zexel genuine, new aftermarket engine parts with delivery

Service parts 101606-6730 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-8141
3. GOVERNOR 105954-0060
4. SUPPLY PUMP 105210-4661
5. AUTOM. ADVANCE MECHANIS 105692-0050
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7990
11. Nozzle and Holder ME076565
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
13. NOZZLE-HOLDER 105030-4290
14. NOZZLE 105015-8470
15. NOZZLE SET

Include in #1:

101606-6730 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

BOSCH F 01G 09U 04M f01g09u04m
ZEXEL 101606-6730 1016066730
MITSUBISHI ME076547 me076547


Zexel num
Bosch num
Firm num
Name
101606-6730 
101607-1010 
F 01G 09U 04M 
ME076547  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D15T2 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5520
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
RED3 control unit part number   407910-2 470
RED3 rack sensor specifications mm   15
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4.2 4.15 4.25
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Rack position   (11.4)
Vist V   1.72 1.72 1.72
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   88 87 89
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Injection quantity adjustment_02
Rack position   (7.9)
Vist V   2.4 2.3 2.5
Pump speed r/min   275 275 275
Average injection quantity mm3/st.   10.5 9 12
Max. variation between cylinders %   0 -10 10

Test data Ex:

Governor adjustment

Test data 101606-6730
(1)Adjusting range (2)Step response time (N): Speed of the pump (L): Load (theta) Advance angle (Srd1) Step response time 1 (Srd2) Step response time 2 1. Adjusting conditions for the variable timer (1)Adjust the clearance between the pickup and the protrusion to L.
----------
L=1.5+-0.2mm N2=800r/min C3=(8)deg t1=2--sec. t2=2--sec.
----------
N1=1400r/min P1=0kPa(0kgf/cm2) P2=392kPa(4kgf/cm2) C1=0.5--deg C2=8+-0.3deg R01=0/4load R02=4/4load

Speed control lever angle

Test data 101606-6730
N:Pump normal S:Stop the pump. (1)Rack position = aa (2)Rack position bb
----------
aa=1mm bb=16mm
----------
a=31deg+-5deg b=29deg+-5deg

0000000901

Test data 101606-6730
(1)Pump vertical direction (2)Position of timer's tooth at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=11deg
----------
a=(1deg)

Stop lever angle

Test data 101606-6730
(Rs) rack sensor specifications (C/U) control unit part number (V) Rack sensor output voltage (R) Rack position (mm) 1. Confirming governor output characteristics (rack 15 mm, span 6 mm) (1)When the output voltages of the rack sensor are V1 and V2, check that the rack positions R1 and R2 in the table above are satisfied.
----------

----------




Information:

Turn the engine to (TDC) top center compression stroke for the No. 1 piston and install crankshaft flywheel timing pin. This will help when timing the camshaft when installing.
Wire used to hold cam roller followers up off camshaft. It is not necessary to remove the cylinder head. With the cylinder head in place, just wire the cam roller followers up off the camshaft and then remove the camshaft. 1. Remove camshaft retainer bolt (1) and remove camshaft assembly (2). The following steps are for the installation of the camshaft assembly. When installing the camshaft, rotating it both clockwise and counter clockwise directions will help prevent it from binding in the bearing bores.2. Put engine oil on the lobes and journals of the camshaft. Carefully install the camshaft. When installing the camshaft, be sure the number one cylinder is at (TDC) top dead center of the compression stroke with the timing pin installed in the flywheel. Camshaft timing is very important. Cam gear timing marks must line up with idler gear timing marks as illustrated. For more information about timing of engine, refer to SPECIFICATIONS module, FORM No. SENR3908.
Camshaft Timing3. With the camshaft properly timed and positioned, install retaining bolt (1). Tighten bolt (1) to a torque of 48 7 N m (35 5 lb.ft.). Remove the wire that was used to hold the cam roller followers up off the camshaftEnd By:a. install fuel transfer pumpb. install front coverc. install front pulley and damperd. install fuel injectorse. install rocker arm assemblies and push rodsDisassembly And Assembly of Camshaft And Gear/Weight Assembly
If the disassembly is being done, just to replace any or all of the twelve retainers, then it may not be necessary to remove the weight assembly from the camshaft. Depending on the press set-up, the retainers may be removed and installed with the camshaft and weight assembly still assembled.Start By:a. remove camshaft assembly 1. Wrap camshaft portion of camshaft and gear/weight assembly (1) with paper towels (2) to protect the camshaft from being damaged. Remove bolts (3) and remove cover plate (4) from assembly (1). Care must be taken not to damage the timing/speed sensor ring gear when removing. Using the prybar, work around the ring gear and pry the ring gear off a little at a time. 2. Using a prybar, carefully pry timing/speed sensor ring gear (5) off the gear/weight assembly. 3. Reposition the camshaft and gear/weight assembly. Remove bolts (6) and remove retainer ring (7), then remove cam gear (8).
Care must be taken not to allow the camshaft to fall to the floor when pressing it from the weight. Also be sure that a camshaft lobe does not catch on the press plates.
4. Place the camshaft and weight assembly through spacer pipe (10) and place it in the press as illustrated. Press the camshaft from weight assembly (9). 5. Position weight assembly (9) in press as illustrated. Use a small spacer pipe (11) to support weight (9) and with a block on

Have questions with 101606-6730?





Group cross 101606-6730 ZEXEL

Mitsubishi 

9 400 615 534 
ME056839 
INJECTION-PUMP ASSEMBLY
6D22
9 400 615 535 
ME076518 
INJECTION-PUMP ASSEMBLY
6D16
 
ME076546 
INJECTION-PUMP ASSEMBLY
6D15T2
101606-6730  

101607-1010 
F 01G 09U 04M 
ME076547 
INJECTION-PUMP ASSEMBLY
6D15T2
 
ME076548 
INJECTION-PUMP ASSEMBLY
6D16
 
ME076550 
INJECTION-PUMP ASSEMBLY
6D16
9 400 615 536 
ME086588 
INJECTION-PUMP ASSEMBLY
6D31
 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 006 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 708 
ME076572 
INJECTION-PUMP ASSEMBLY
6D16
9 400 615 537 
ME157190 
INJECTION-PUMP ASSEMBLY
6D22
F 01G 09U 04N 
ME076551 
INJECTION-PUMP ASSEMBLY
6D16
Back to top