101606-1521 ZEXEL F 01G 09U 04E BOSCH INJECTION-PUMP ASSEMBLY f01g09u04e 1016061521 me076014


 

Information injection-pump assembly

BOSCH F 01G 09U 04E f01g09u04e
ZEXEL 101606-1521 1016061521
MITSUBISHI ME076014 me076014
101606-1521 INJECTION-PUMP ASSEMBLY
Rating:
43
Buy INJECTION-PUMP ASSEMBLY 101606-1521 zexel genuine, new aftermarket engine parts with delivery

Service parts 101606-1521 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-9020
3. GOVERNOR 105931-5500
4. SUPPLY PUMP 105210-4700
5. AUTOM. ADVANCE MECHANIS 105643-0070
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-5990
11. Nozzle and Holder ME035748
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105031-3900
14. NOZZLE 105015-5670
15. NOZZLE SET

Include in #1:

101606-1521 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 01G 09U 04E f01g09u04e
ZEXEL 101606-1521 1016061521
MITSUBISHI ME076014 me076014


Zexel num
Bosch num
Firm num
Name
101606-1521 
F 01G 09U 04E 
ME076014  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D15 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5520
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.5
Pump speed r/min   850 850 850
Each cylinder's injection qty mm3/st.   69 66.9 71.1
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.9+-0.5
Pump speed r/min   275 275 275
Each cylinder's injection qty mm3/st.   9.2 8.1 10.3
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.5)
Pump speed r/min   850 850 850
Average injection quantity mm3/st.   69 68 70
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.35
Pump speed r/min   1450 1450 1450
Average injection quantity mm3/st.   82.5 78.5 86.5
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   C
Rack position   R1-0.2
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   47.6 43.6 51.6
Fixing the lever   *
Injection quantity adjustment_06
Adjusting point   I
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   80 75 85
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1250--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1200
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1350
Advance angle deg.   2.4 1.9 2.9
Timer adjustment_04
Pump speed r/min   1500
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101606-1521
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)RACK LIMIT
----------
T1=C92
----------

Speed control lever angle

Test data 101606-1521
F:Full speed I:Idle (1)Stopper bolt set position 'H'
----------

----------
a=33deg+-5deg b=(42deg)+-3deg

Stop lever angle

Test data 101606-1521
N:Engine manufacturer's normal use S:Stop the pump. (1)Free (at shipping) (2)Rack position = approximately aa. (3)Set the stopper bolt at speed = rated point and rack position = bb (non-injection rack position). Confirm non-injection. (4)After setting the stopper bolt, confirm non-injection at speed cc. Rack position = dd (non-injection rack position).
----------
aa=17.4mm bb=(7)mm cc=275r/min dd=(8)mm
----------
a=17deg+-5deg b=(27deg) c=2deg+-5deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=400+-5r/min Ra=9.7mm
----------

Timing setting

Test data 101606-1521
(1)Pump vertical direction (2)Position of timer's tooth at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=12deg
----------
a=(1deg)




Information:

You must read and understand the warnings and instructions contained in the Safety section of this manual before performing any operation or maintenance procedures.For most users, a top end overhaul is not needed until the major OVERHAUL interval. A top end overhaul is generally indicated by increased fuel consumption and reduced power. This option consists of completely reconditioning your cylinder head, but the cylinder components are not worn enough to need repair. Overhaul Programs
Your Caterpillar dealer may be offering a variety of options regarding overhaul programs and Caterpillar recommends that an Overhaul be performed at this maintenance interval.Overhaul Options
Caterpillar Dealer - Contact your Caterpillar dealer to schedule a Before Failure Overhaul. Overhaul Kit - This useful kit was developed for those users that prefer to perform their own overhaul. This kit includes a combination of new, reused and Remanufactured parts. Also included is a step-by-step instruction regarding how to perform an overhaul. An Overhaul Kit simplifies parts ordering, helps speed repairs and reduces parts costs. Contact your local Caterpillar dealer for information regarding the Overhaul Kit.Overhaul Recommendation
Overhaul programs vary from dealer to dealer. Therefore, Caterpillar recommends that you confer with your dealer to obtain specific information regarding the types of programs offered and overhaul services provided for extending the life of your engine.After Failure Overhaul
If you experience a major engine failure which requires removal of the engine, there are also many After Failure Overhaul options available. An overhaul should be performed if your block or crankshaft needs to be repaired. If the block and/or crankshaft is repairable, then the cost of an overhaul should be between 40 and 50% of the cost of a new engine (with like exchange core).This lower cost can be attributed to Caterpillar "designed-in" features that include regrindable crankshaft, undersize bearings, if needed and Cat dealer and Caterpillar Remanufactured exchange components.

Have questions with 101606-1521?





Group cross 101606-1521 ZEXEL

Mitsubishi 

9 400 615 454 
ME086549 
INJECTION-PUMP ASSEMBLY
6D31
9 400 615 455 
ME7H6006 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
101606-1521  
F 01G 09U 04E 
ME076014 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
F 01G 09U 04F 
ME076015 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
ME076016 
INJECTION-PUMP ASSEMBLY
6D15
 
ME035359 
INJECTION-PUMP ASSEMBLY
6D14
9 400 615 456 
ME047495 
INJECTION-PUMP ASSEMBLY
6D16T
9 400 610 095 
ME086553 
INJECTION-PUMP ASSEMBLY
6D31
 
 
INJECTION-PUMP ASSEMBLY
6D14T
 
 
INJECTION-PUMP ASSEMBLY
6D14T
9 400 615 457 
ME076223 
INJECTION-PUMP ASSEMBLY
6D14T
 
 
INJECTION-PUMP ASSEMBLY
6D14T
F 01G 09U 04G 
ME076224 
INJECTION-PUMP ASSEMBLY
6D14T
Back to top