101606-1150 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016061150


 

Information injection-pump assembly

ZEXEL 101606-1150 1016061150
101606-1150 INJECTION-PUMP ASSEMBLY
Rating:
13
Buy INJECTION-PUMP ASSEMBLY 101606-1150 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101606-1150 1016061150


Zexel num
Bosch num
Firm num
Name
101606-1150 
101606-1152 
 
  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D15 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5520
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11
Pump speed r/min   850 850 850
Each cylinder's injection qty mm3/st.   60 58.1 61.9
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   10+-0.5
Pump speed r/min   275 275 275
Each cylinder's injection qty mm3/st.   10 8.9 11.1
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11)
Pump speed r/min   850 850 850
Average injection quantity mm3/st.   60 59 61
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.6
Pump speed r/min   1450 1450 1450
Average injection quantity mm3/st.   80.5 78.5 82.5
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   I
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   80 75 85
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1250--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1200
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1350
Advance angle deg.   2.4 1.9 2.9
Timer adjustment_04
Pump speed r/min   1500
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101606-1150
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)RACK LIMIT
----------
T1=C14
----------

Speed control lever angle

Test data 101606-1150
F:Full speed I:Idle (1)Stopper bolt set position 'H'
----------

----------
a=18.5deg+-5deg b=(42deg)+-3deg

Stop lever angle

Test data 101606-1150
N:Engine manufacturer's normal use S:Stop the pump. (1)Set the stopper bolt at speed = rated point and rack position = aa (non-injection rack position). Confirm non-injection. (2)After setting the stopper bolt , confirm non-injection at pump speed bb. Rack position = cc (non-injection rack position). (3)Rack position = approximately dd (4)Free (at shipping)
----------
aa=7mm bb=275r/min cc=8mm dd=15mm
----------
a=38deg+-5deg b=(26.5deg) c=12.5deg+-3deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=400+-5r/min Ra=9.2mm
----------

Timing setting

Test data 101606-1150
(1)Pump vertical direction (2)Position of timer's tooth at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=12deg
----------
a=(1deg)




Information:

Engine Lifting
When it is necessary to remove a component on an angle, remember that the capacity of an eyebolt is less as the angle between the supporting members and the object becomes less than 90 degrees. Eye Bolts and brackets should never be bent, and should only be loaded under tension.
Use a hoist to remove heavy components. Use an adjustable lifting beam to lift the engine. All supporting members (chains and cables) should be parallel to each other, and perpendicular as possible to the top of the object being lifted.Some removals require the use of lifting fixtures, to obtain proper balance and provide safe handling.To remove the engine ONLY, use the lifting eyes equipped with the engine.The lifting eyes are designed for the engine arrangement as sold. Modifying the lifting eyes and/or engine arrangement weight renders the lifting eyes and devices obsolete.If you modify the lifting eyes and/or engine arrangement weight, you are responsible for providing adequate lifting devices. Contact your Caterpillar dealer for information regarding fixtures for proper engine package lifting.Engine Storage
The following Engine Storage procedures and recommendations minimize the possibility of damage to engines stored for one year or less.When an engine is not started for several weeks, the lubricating oil drains from the cylinder walls and piston rings. Rust can then form on the cylinder liner surface, increasing engine wear and decreasing engine life.Special precautions should be used with engines remaining out of service for extended periods.After one year, a complete protection procedure must be followed if the engine is kept in storage longer. To prevent excessive engine wear:* Be sure all lubrication recommendations mentioned in the Maintenance Schedule intervals chart are completed.* If freezing temperatures are expected, check the cooling system for adequate protection against freezing. A 50/50 solution of Caterpillar (permanent-type) Antifreeze and approved water will give protection to -29°C (-20°F).If it will be impossible to start the engine periodically, consult your Caterpillar dealer for instructions to prepare your engine for longer storage periods.Refer to Storage Procedures For Caterpillar Products, SEHS9031, for more detailed information on engine storage.Engine and Marine Transmission Lifting
To remove the engine only, or the engine and marine gear together, use the lifting eyes on the engine.Marine Transmission Lifting
To remove the marine transmission only, use the eye bolts in the marine transmission housing.If a component resists removal, check to be certain all nuts and bolts have been removed and that an adjacent part is not interfering.Marine Transmission Storage
Transmission Storage Procedure
1. First, thoroughly clean the transmission and put on good quality paint.2. If the marine transmission is to be in storage for more than six months, add VCI oil at a rate of two percent of lube oil capacity. This will give additional protection from moisture.3. Operate the marine transmission for a short period to circulate oil.4. Cover and/or put tape over all openings.5. Put a heavy amount of multipurpose grease on all outside parts that move: linkage, etc.6. Put a waterproof or plastic cover over the unit.Transmission Procedure After Storage
1.

Have questions with 101606-1150?





Group cross 101606-1150 ZEXEL

Mitsubishi 

9 400 615 425 
ME050825 
INJECTION-PUMP ASSEMBLY
6D22
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
9 400 615 426 
ME076010 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
ME076011 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
ME076012 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
ME076013 
INJECTION-PUMP ASSEMBLY
6D15
101606-1150  

101606-1152 
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
F 01G 09U 04D 
ME076017 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
ME076018 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D15
9 400 615 427 
ME076019 
INJECTION-PUMP ASSEMBLY
6D15
 
 
INJECTION-PUMP ASSEMBLY
6D16
9 400 615 428 
ME047471 
INJECTION-PUMP ASSEMBLY
6D16
9 400 615 429 
ME047289 
INJECTION-PUMP ASSEMBLY
6D16T
Back to top