101605-9380 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016059380 1679095063


 

Information injection-pump assembly

ZEXEL 101605-9380 1016059380
NISSAN-DIESEL 1679095063 1679095063
101605-9380 INJECTION-PUMP ASSEMBLY
Rating:
71
Buy INJECTION-PUMP ASSEMBLY 101605-9380 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101605-9380 1016059380
NISSAN-DIESEL 1679095063 1679095063


Zexel num
Bosch num
Firm num
Name
101605-9380 
101605-9381 
 
1679095063  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
NE6T * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   2.75 2.7 2.8
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.9
Pump speed r/min   750 750 750
Average injection quantity mm3/st.   107 105.5 108.5
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Boost pressure kPa   84 84
Boost pressure mmHg   630 630
Injection quantity adjustment_02
Adjusting point   D
Rack position   6.4+-0.5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   10.5 9 12
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   600 600 600
Rack position   10.4
Boost pressure kPa   45.3 42.6 48
Boost pressure mmHg   340 320 360
Boost compensator adjustment_02
Pump speed r/min   600 600 600
Rack position   R1(10.9)
Boost pressure kPa   70.6 70.6 70.6
Boost pressure mmHg   530 530 530

Test data Ex:

Governor adjustment

Test data 101605-9380
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator excessive fuel lever at operation: L1 (at 0 boost pressure) (4)Boost compensator stroke: BCL (5)Set idle sub-spring (6)Main spring setting
----------
K=13 L1=11.5+-0.2mm BCL=(0.5)mm
----------

Speed control lever angle

Test data 101605-9380
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=5deg+-5deg b=16deg+-5deg

Stop lever angle

Test data 101605-9380
N:Pump normal S:Stop the pump.
----------

----------
a=26.5deg+-5deg b=53deg+-5deg

0000001101

Test data 101605-9380
N:Normal B:When boosted (1)Rack position = aa at boost pressure 0.
----------
aa=11.5+-0.2mm
----------
a=(8deg) b=(15deg)

Timing setting

Test data 101605-9380
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=16deg
----------
a=(30deg)




Information:

Replace:
Thrust, Main and Rod Bearings, Valve Rotators, Thermostat and Throttle Position SensorIn most probability, these components will not last until the second overhaul. Therefore, Caterpillar recommends the installation of these components new at each overhaul period.Inspect:
Crankshaft, Camshaft, Camshaft Followers, Vibration Damper, Spacer Block, Oil Pump and Fuel Transfer PumpThe ideal time for inspecting your crankshaft, camshaft and vibration damper is while the engine is disassembled for overhaul. Inspect each component for potential damage as follows:Crankshaft - Inspect for bend, journal damage and bearing material seized to the journal. At the same time, check the taper and profile of the crankshaft journals by interpreting your main and rod bearing wear patterns. In case of an out-of-frame overhaul, use the magnetic particle inspection process to check the crankshaft for cracks.* Camshaft - Inspect the camshaft for journal damage. In case of an out-of-frame overhaul, use the magnetic particle inspection process to check the camshaft for cracks.* Camshaft Followers - For out-of-frame overhaul, inspect the cam bearing for fatigue and wear.* Vibration Damper - Inspect the damper for rubber deterioration and movement of the outer ring relative to the inner hub.* Spacer Block - Inspect the spacer block for excessive wear or warping. For additional information regarding these components, contact your local Caterpillar dealer for assistance.Test:
Electronic Unit Injectors For additional information regarding this component, contact your local Caterpillar dealer for assistance.Clean/Test:
Oil Cooler Core and Aftercooler CoreCaterpillar recommends that the oil cooler core and the air-to-air aftercooler core be cleaned and pressure tested at each overhaul. For additional specifications and/or pressure test information, contact your local Caterpillar dealer.Cleaning Procedure for Air-to-Air Aftercooler
Caterpillar recommends that the air-to-air aftercooler core be removed, cleaned, and tested at overhaul time, if a turbocharger failure has occurred, or if at any time the turbocharger develops an oil leak.To clean the air-to-air aftercooler system:1. Remove the air-to-air aftercooler core. Turn the core upside down to remove debris from the inlet tank.
Do not use caustic cleaners to clean the air-to-air aftercooler core. Caustic cleaners will attack the internal metals of the core and cause leakage.
2. Back flush internally with a solvent to loosen foreign substances and to remove oil.Caterpillar recommends the use of Caterpillar Hydrosolv 4165 or Hydrosolv 100 Liquid Cleaners. For more information see "General Instructions and Application Guide" Form LEHQ6101 or contact your Caterpillar dealer.3. Shake the core vigorously to eliminate any trapped debris.4. Wash the core with hot, soapy water. Rinse thoroughly with clean water.
The maximum air pressure must not be above 30 psi (205 kPa) for cleaning purposes.
5. Dry the core with compressed air. Blow air in reverse direction of normal flow. Use all necessary safety equipment while using compressed air.6. Inspect the system to ensure cleanliness and install the air-to-air aftercooler core.Caterpillar Recommendation
The "repair before failure" concept makes sense. It saves money, lowers operating costs and minimizes downtime.As previously illustrated, it is not cheaper to operate the truck until an engine component fails, since failing components may increase fuel costs and upon failure, could

Have questions with 101605-9380?





Group cross 101605-9380 ZEXEL

Dpico 

9 400 612 034 
 
INJECTION-PUMP ASSEMBLY
D2156
F 019 Z10 986 
 
INJECTION-PUMP ASSEMBLY
D2156
 
 
INJECTION-PUMP ASSEMBLY
DB58
 
 
INJECTION-PUMP ASSEMBLY
9 400 610 696 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 611 602 
1679095064 
INJECTION-PUMP ASSEMBLY
NE6T
9 400 615 376 
16790NB000 
INJECTION-PUMP ASSEMBLY
NE6T
 
1679095065 
INJECTION-PUMP ASSEMBLY
NE6T
9 400 610 697 
1679095070 
INJECTION-PUMP ASSEMBLY
NE6T
9 400 615 377 
16790NB002 
INJECTION-PUMP ASSEMBLY
NE6T

Mitsubishi-Heav 

 
3436102030 
INJECTION-PUMP ASSEMBLY
S6K-T
9 400 615 378 
3436102031 
INJECTION-PUMP ASSEMBLY
S6K-T

Nissan-Diesel 

 
16790Z5604 
INJECTION-PUMP ASSEMBLY
FM6TA16
 
16790Z5605 
INJECTION-PUMP ASSEMBLY
9 400 610 698 
16790Z5608 
INJECTION-PUMP ASSEMBLY
FE6T
9 400 615 379 
16790Z5613 
INJECTION-PUMP ASSEMBLY
FE6T
101605-9380  

101605-9381 
 
1679095063 
INJECTION-PUMP ASSEMBLY
NE6T
9 400 615 380 
1679095069 
INJECTION-PUMP ASSEMBLY
NE6T

Mitsubishi-Heav 

9 400 610 699 
3436100060 
INJECTION-PUMP ASSEMBLY
S6K
Back to top