Buy 101605-3990 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016053990 6221711310


 

Information injection-pump assembly

ZEXEL 101605-3990 1016053990
KOMATSU 6221711310 6221711310
101605-3990 INJECTION-PUMP ASSEMBLY
Rating:
12
Buy INJECTION-PUMP ASSEMBLY 101605-3990 zexel genuine, new aftermarket engine parts with delivery

Compare Prices: .

As an associate, we earn commssions on qualifying purchases through the links below
$1,483.00

02 Jan 2025

CN: qian cheng
Injection Pump Assembly 6221-71-1310 6221-71-1311 for Komatsu Engine S6D108 S6D108-1B
ADPelcote Part number:6221-71-1310 || Applications:for Komatsu Engine S6D108 S6D108-1B

Cross reference number

ZEXEL 101605-3990 1016053990
KOMATSU 6221711310 6221711310


Zexel num
Bosch num
Firm num
Name
101605-3990 
101605-3991 
 
6221711310  KOMATSU
INJECTION-PUMP ASSEMBLY
S6D108 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.9
Pump speed r/min   950 950 950
Average injection quantity mm3/st.   83.3 82.3 84.3
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6+-0.5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   14 12.8 15.2
Max. variation between cylinders %   0 -10 10
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 101605-3990
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)RACK LIMIT: RAL (3)Rack difference between N = N1 and N = N2
----------
K=5 RAL=14+0.2mm N1=950r/min N2=700r/min
----------

Speed control lever angle

Test data 101605-3990
F:Full speed I:Idle S:Stop
----------

----------
a=1deg+-5deg b=26deg+-5deg c=32deg+-3deg

Timing setting

Test data 101605-3990
(1)Pump vertical direction (2)Position of camshaft's key groove at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(50deg)




Information:

Storage Procedure
When a generator is in storage for any length of time, moisture condenses in the windings. Minimize the condensation by use of a dry storage space and space heaters. Refer to step 2 belowIf a brush-type generator (SRCR) is to be in storage for a year or more, lift the brushes off the slip ring to prevent damage to the slip ring by chemical action.After Storage
Test the main stator windings with a megohmmeter in the following situations: 1. Before initial startup of generator set.2. Every 3 months* if generator is operating in a humid environment.3. If generator has not been run under load for 3 months* or more.*This is a guideline only. It may be necessary to megger more frequently if environment is extremely humid, salty or if the last megger test was close to 1 megohm.The megohmmeter test is described in Service Manuals SENR2180 or SENR7968. A reading of 1 meghom or less indicates that the winding has absorbed too much moisture.To Remove Moisture
To remove moisture caused by high humidity, use one of the following methods to make the generator dry:1. Energize space heaters in generator if so equipped.2. Put the generator in an oven at a temperature of not more than 85°C (185°F) for four hours.
If an oven is used for drying, use a forced air type rather than a radiant type. Radiant ovens can cause localized overheating.
3. Space heaters of the same type used in marine applications, can be installed on generators. (See the Parts Book.) These heaters heat the windings to remove moisture and should be connected at all times in high humidity conditions whenever the generator is not running.4. Use a canvas enclosure around the generator and heating lamps to increase the temperature. Make an opening in the top for release of moisture.5. Send a low voltage current through the windings to increase the temperature of the windings. Do not exceed 85°C (185°F).If the megohmmeter test reads under 1 megohm after the drying or if it goes below 1 megohm shortly after drying, contact your Caterpillar dealer. The insulation has deteriorated and should be reconditioned.

Have questions with 101605-3990?





Group cross 101605-3990 ZEXEL

Komatsu 

 
6137721621 
INJECTION-PUMP ASSEMBLY
S6D105
 
6138721481 
INJECTION-PUMP ASSEMBLY
S6D110
 
6138721421 
INJECTION-PUMP ASSEMBLY
SA6D110
9 400 611 437 
6138721441 
INJECTION-PUMP ASSEMBLY
SA6D110
 
6209711350 
INJECTION-PUMP ASSEMBLY
6M91A
9 400 615 359 
6209711351 
INJECTION-PUMP ASSEMBLY
6M91A-1
9 400 611 438 
6209711360 
INJECTION-PUMP ASSEMBLY
6M95A
9 400 612 113 
6209711361 
INJECTION-PUMP ASSEMBLY
6M95A-2
 
 
INJECTION-PUMP ASSEMBLY
S6D108
9 400 615 360 
6221711810 
INJECTION-PUMP ASSEMBLY
S6D108
F 019 Z10 834 
6137721270 
INJECTION-PUMP ASSEMBLY
S6D105
F 019 Z10 605 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 615 361 
6138721153 
INJECTION-PUMP ASSEMBLY
S6D110
101605-3990  

101605-3991 
 
6221711310 
INJECTION-PUMP ASSEMBLY
S6D108
9 400 615 362 
6221711311 
INJECTION-PUMP ASSEMBLY
S6D108
Back to top