101605-3970 ZEXEL F 019 Z10 834 BOSCH INJECTION-PUMP ASSEMBLY f019z10834 1016053970 6137721270


 

Information injection-pump assembly

BOSCH F 019 Z10 834 f019z10834
ZEXEL 101605-3970 1016053970
KOMATSU 6137721270 6137721270
101605-3970 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 101605-3970 zexel genuine, new aftermarket engine parts with delivery

Service parts 101605-3970 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-2470
3. GOVERNOR 105411-1410
4. SUPPLY PUMP 105210-4570
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105661-0371
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6440
11. Nozzle and Holder 6-13712-320-0
12. Open Pre:MPa(Kqf/cm2) 22.1(225)
13. NOZZLE-HOLDER 105031-4480
14. NOZZLE 105015-6130
15. NOZZLE SET

Include in #1:

101605-3970 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101605-3970 
F 019 Z10 834 
6137721270  KOMATSU
INJECTION-PUMP ASSEMBLY
S6D105 * K




Information:

Cold Weather Battery Maintenance
General Maintenance
1. After adding make-up water, charge the battery. The added water could dilute the electrolyte enough without charging to cause freezing and permanent damage to the battery.2. Keep the batteries fully charged either by operating the charging system or by using a battery charger.3. Keep the battery warm when not in use. In an unheated area, the heat from a lighted electric bulb is usually sufficient.
Use only a shop cord with a heavy wire guard around the light bulb.
Do not lay a lighted bulb directly on a battery case; the heat at point of contact could melt the battery case.Do not lay cloth or flammable material in contact with a lighted bulb; charring and/or fire could result.4. Use starting aids as instructed for starting the engine.5. Use booster batteries as required. Connect the batteries as instructed below.6. If a battery is not going to be used for a period of time, be sure the battery is fully charged while stored. Use a battery hydrometer to check the specific gravity of each cell, and use a battery charger to keep the battery charged. See the instructions below.Voltage Test (After Load)
A load test should be made on a battery that discharges very rapidly when in use. To do this apply a resistance of three times the ampere/hour rating of the battery across the battery main terminals. Allow the resistance to discharge the the battery for 15 seconds and immediately test the battery voltage. A 6 volt battery in good condition will test 4.5 volts; a 12 volt battery in good condition will test 9 volts and a 24 volt battery will test 18 volts.Starter
No periodic service is indicated for the electric starter brushes between general reconditioning periods. The brushes should only be inspected after removal of the starter from the engine and removal of the commutator end bearing frame. The electric starter commutator end and drive end bearings are equipped with wicks for lubrication purposes. The wicks should be saturated with oil whenever the electric starter is removed or disassembled.It is suggested that cleaning and reconditioning be entrusted to your authorized dealer.Pinion Clearance Adjustment
Whenever the solenoid is installed, the pinion clearance should be adjusted. The adjustment should be made with the starting motor removed.Bench test and adjust the pinion clearance at installation of solenoid as follows:
CIRCUIT FOR CHECKING AND ADJUSTING PINION CLEARANCE1. Install the solenoid without connector from the MOTOR terminal on solenoid to the motor.2. Connect a battery, of the same voltage as the solenoid, to the terminal marked SW.3. Connect the other side of battery to ground terminal or to solenoid frame.
ADJUSTING PINION CLEARANCE4. MOMENTARILY flash a jumper wire from the solenoid terminal marked MOTOR to the frame or ground terminal. The pinion will shift into cranking position and will remain there until the battery is disconnected.5. Push pinion towards commutator end to eliminate free movement.6. Pinion clearance should be .36 in. (9.14 mm).7. Adjust clearance by removing plug and turning shaft nut.
ADJUSTING PINION

Have questions with 101605-3970?





Group cross 101605-3970 ZEXEL

Komatsu 

 
6137721621 
INJECTION-PUMP ASSEMBLY
S6D105
 
6138721481 
INJECTION-PUMP ASSEMBLY
S6D110
 
6138721421 
INJECTION-PUMP ASSEMBLY
SA6D110
9 400 611 437 
6138721441 
INJECTION-PUMP ASSEMBLY
SA6D110
 
6209711350 
INJECTION-PUMP ASSEMBLY
6M91A
9 400 615 359 
6209711351 
INJECTION-PUMP ASSEMBLY
6M91A-1
9 400 611 438 
6209711360 
INJECTION-PUMP ASSEMBLY
6M95A
9 400 612 113 
6209711361 
INJECTION-PUMP ASSEMBLY
6M95A-2
 
 
INJECTION-PUMP ASSEMBLY
S6D108
9 400 615 360 
6221711810 
INJECTION-PUMP ASSEMBLY
S6D108
101605-3970  
F 019 Z10 834 
6137721270 
INJECTION-PUMP ASSEMBLY
S6D105
F 019 Z10 605 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 615 361 
6138721153 
INJECTION-PUMP ASSEMBLY
S6D110
 
6221711310 
INJECTION-PUMP ASSEMBLY
S6D108
9 400 615 362 
6221711311 
INJECTION-PUMP ASSEMBLY
S6D108
Back to top