101605-3290 ZEXEL 9 400 619 724 BOSCH INJECTION-PUMP ASSEMBLY 9400619724 1016053290 6138721420


 

Information injection-pump assembly

BOSCH 9 400 619 724 9400619724
ZEXEL 101605-3290 1016053290
KOMATSU 6138721420 6138721420
101605-3290 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 101605-3290 zexel genuine, new aftermarket engine parts with delivery

Service parts 101605-3290 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-4110
3. GOVERNOR 105410-8460
4. SUPPLY PUMP 105210-4800
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105662-0870
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6000
11. Nozzle and Holder 6-13812-310-0
12. Open Pre:MPa(Kqf/cm2) 24.5{250}
13. NOZZLE-HOLDER 105031-4480
14. NOZZLE 105015-5680
15. NOZZLE SET

Include in #1:

101605-3290 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 619 724 9400619724
ZEXEL 101605-3290 1016053290
KOMATSU 6138721420 6138721420


Zexel num
Bosch num
Firm num
Name
101605-3290 
9 400 619 724 
6138721420  KOMATSU
INJECTION-PUMP ASSEMBLY
SA6D110 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4 3.95 4.05
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.7
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   123 122 124
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   7+-0.5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   11.8 10.6 13
Max. variation between cylinders %   0 -10 10
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 101605-3290
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Idle sub spring setting: L1. (3)Rack difference between N = N1 and N = N2
----------
K=11 L1=6.1-0.5mm N1=750r/min N2=400r/min
----------

Speed control lever angle

Test data 101605-3290
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=4deg+-5deg b=24deg+-5deg

Stop lever angle

Test data 101605-3290
N:Pump normal S:Stop the pump.
----------

----------
a=27deg+-5deg b=53deg+-5deg

Timing setting

Test data 101605-3290
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(0deg)




Information:


Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Turn the crankshaft until the "C" mark on the crankshaft gear is in alignment with the "C" mark on the camshaft gear. To keep the engine timing correct during removal and installation of the camshaft, put a mark on the teeth of the fuel injection pump drive gear and idler gear at location (A). Put a mark on the teeth of the idler gear and camshaft gear at location (B). When installing the camshaft, the engine timing will be correct when the marks at locations (A) and (B) are in alignment and the "C" marks on the crankshaft and camshaft gears are in alignment.2. Remove the bolts, lock and washer (1) that hold the camshaft in position.
Do not cause damage to the lobes or bearings when the camshaft is removed.
3. Remove the camshaft and gear (2).4. If necessary, remove the bolts and gear. The following steps are for the installation of the camshaft.5. Put the camshaft drive gear in position on the end of the camshaft, and install the bolts that hold it. Tighten the bolts to a torque of 55 7 N m (41 5 lb ft).
Do not cause damage to the lobes or bearings when the camshaft is installed.
6. Put 2P2506 Thread Lubricant on the camshaft lobes only, and clean engine oil on the bearing journals. Install camshaft (3) aligning the "C" marks and the marks put on the gears during removal.7. Install washer (1), the lock and bolts.End By:a. install valve liftersb. install timing gear cover

Have questions with 101605-3290?





Group cross 101605-3290 ZEXEL

Komatsu 

 
6137721370 
INJECTION-PUMP ASSEMBLY
S6D105
 
6136721151 
INJECTION-PUMP ASSEMBLY
6D105
 
6136721152 
INJECTION-PUMP ASSEMBLY
6D105
9 400 615 331 
6136721153 
INJECTION-PUMP ASSEMBLY
6D105
9 400 615 332 
6137721521 
INJECTION-PUMP ASSEMBLY
S6D105
 
6138721871 
INJECTION-PUMP ASSEMBLY
S6D110
 
 
INJECTION-PUMP ASSEMBLY
S6D105
 
 
INJECTION-PUMP ASSEMBLY
S6D105
9 400 615 333 
6137721420 
INJECTION-PUMP ASSEMBLY
S6D105
9 400 615 334 
6137721430 
INJECTION-PUMP ASSEMBLY
S6D105
 
 
INJECTION-PUMP ASSEMBLY
6D105
 
6136721630 
INJECTION-PUMP ASSEMBLY
6D105
 
6136721170 
INJECTION-PUMP ASSEMBLY
6D105
9 400 615 335 
6137721210 
INJECTION-PUMP ASSEMBLY
SA6D105
101605-3290  
9 400 619 724 
6138721420 
INJECTION-PUMP ASSEMBLY
SA6D110
Back to top