101605-0180 ZEXEL 9 400 612 997 BOSCH INJECTION-PUMP ASSEMBLY 9400612997 1016050180 1156034350


 

Information injection-pump assembly

BOSCH 9 400 612 997 9400612997
ZEXEL 101605-0180 1016050180
ISUZU 1156034350 1156034350
101605-0180 INJECTION-PUMP ASSEMBLY
Rating:
41
Buy INJECTION-PUMP ASSEMBLY 101605-0180 zexel genuine, new aftermarket engine parts with delivery

Service parts 101605-0180 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101062-8030
3. GOVERNOR 105411-2110
4. SUPPLY PUMP 105220-6240
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156639-0320
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105160-4170
11. Nozzle and Holder 1-15300-331-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105030-4361
14. NOZZLE 105025-0290
15. NOZZLE SET

Include in #1:

101605-0180 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

Zexel num
Bosch num
Firm num
Name
101605-0180 
9 400 612 997 
1156034350  ISUZU
INJECTION-PUMP ASSEMBLY
6BG1-T K 14BF INJECTION PUMP ASSY PE6AD PE




Information:


Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Remove idler gear (7).2. Remove the gear train housing, which has the Power Take Off, (PTO), mounted to it.3. Remove bolts (3) and drive opening cover (10). Remove PTO gear assembly (1). Remove six nuts (4).4. Remove adapter assembly (2) and o-ring seals (6) and (8).5. If necessary, remove bearing sleeves (9) and (5) for the idler gear and the PTO gear (1). Make note of the positioning of the oil holes in the bearings. Proper location of the holes during installation is necessary for lubrication. The following steps are for the installation of the PTO Assembly.6. Install bearing sleeves (5) and (9). Be sure to align oil holes.7. Install PTO assembly in the gear train housing. Coat the bearing sleeves with clean engine oil. Install o-ring seal (8). Position adapter assembly (2) on the studs and install the nuts8. Install o-ring seal (6), drive opening cover (10) and bolts (3).9. Install the gear train housing on the engine block.10. Install the idler gear. Apply 5P3414 Pipe Sealant to the threads of the bolts and install. Torque to 135 15 N m (100 11 lb ft).
Perform Scheduled Oil Sampling on oil wetted compartments after performing service work to check for contaminants left in the system following repair. Contaminants put into the system may cause rapid wear and shortened component life.
End By:a. install flywheel housing

Have questions with 101605-0180?





Group cross 101605-0180 ZEXEL

Isuzu 

9 400 612 260 
1156033960 
INJECTION-PUMP ASSEMBLY
6BG1-T
F 019 Z10 729 
1156033980 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 612 166 
1156033981 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 612 614 
1156034040 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 611 995 
1156034050 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 612 261 
1156034030 
INJECTION-PUMP ASSEMBLY
6BG1-T
F 019 Z10 730 
1156034220 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 612 365 
1156034221 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 612 366 
1156034270 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 612 615 
1156034271 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 612 367 
1156034310 
INJECTION-PUMP ASSEMBLY
6BG1-T
101605-0180  
9 400 612 997 
1156034350 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 615 320 
1156034510 
INJECTION-PUMP ASSEMBLY
6BG1-T
Back to top