101603-9731 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016039731 16713z5877


 

Information injection-pump assembly

ZEXEL 101603-9731 1016039731
NISSAN-DIESEL 16713Z5877 16713z5877
101603-9731 INJECTION-PUMP ASSEMBLY
Rating:
67
Buy INJECTION-PUMP ASSEMBLY 101603-9731 zexel genuine, new aftermarket engine parts with delivery

Service parts 101603-9731 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-3970
3. GOVERNOR 105921-4551
4. SUPPLY PUMP 105220-7060
5. AUTOM. ADVANCE MECHANIS 105672-0190
6. COUPLING PLATE 105661-0391
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6690
11. Nozzle and Holder 16600-Z5519
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105031-4650
14. NOZZLE 105015-6380
15. NOZZLE SET

Include in #1:

101603-9731 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101603-9731 
101603-9790 
 
16713Z5877  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FE6B * K 14BF PE6AD PE




Information:

START BY:a. remove fuel filter and base1. Drain the coolant from the engine.
Do not disconnect the air line from the compressor governor until the air pressure is zero.
2. Loosen the bleed valve and release the air pressure in the air tank. 3. Disconnect air compressor line (1) and fuel ratio control line (2) from the aftercooler housing. 4. Remove four turbocharger tube adapter to aftercooler housing bolts (3), nuts and cover. Loosen turbocharger compressor housing clamp (4), and rotate turbocharger tube (5) out of the way of the aftercooler housing. 5. Fasten tooling (A) and a hoist to aftercooler housing (6). Remove bolts (7) that hold the aftercooler housing to the cylinder head assembly. Remove the aftercooler housing from the engine. The weight is 36 kg (80 lb.).Install Aftercooler Housing
1. Install new O-ring seals (1) on the aftercooler water inlet and outlet pipes. Lubricate the O-ring seals with clean engine oil. Put new gaskets in position on the cylinder head assembly.2. Fasten tooling (A) and a hoist to aftercooler housing (2), and put the aftercooler housing in position on the water pipes and cylinder head assembly.3. Put 9S3263 Thread Lock on the threads of the bolts, and install the bolts that hold the aftercooler housing to the cylinder head assembly. 4. Rotate turbocharger tube (3) into position. Place a gasket between the aftercooler housing and adapter, and install four bolts and nuts that hold it. Tighten turbocharger clamp nut (4) to a torque of 18 3 N m (13 2 lb.ft.). Lightly hit all around the clamp with a soft faced hammer, and tighten the clamp nut again to the same torque value. 5. Connect air compressor line (5) and fuel ratio control line (6).6. Fill engine with coolant to the correct level. See the Maintenance Guide.END BY:a. install fuel filter and base

Have questions with 101603-9731?





Group cross 101603-9731 ZEXEL

Nissan-Diesel 

 
16713Z5875 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16800Z5518 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16800Z5519 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

101603-9731  

101603-9790 
 
16713Z5877 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
KH
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 615 303 
16713Z5908 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

F 019 Z10 603 
16713Z5909 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

F 019 Z10 604 
16713Z5910 
INJECTION-PUMP ASSEMBLY
FE6B
Back to top