101603-9420 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016039420


 

Information injection-pump assembly

ZEXEL 101603-9420 1016039420
101603-9420 INJECTION-PUMP ASSEMBLY
Rating:
19
Buy INJECTION-PUMP ASSEMBLY 101603-9420 zexel genuine, new aftermarket engine parts with delivery

Service parts 101603-9420 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-3330
3. GOVERNOR 105921-3680
4. SUPPLY PUMP 105220-7050
5. AUTOM. ADVANCE MECHANIS 105614-3290
6. COUPLING PLATE 105661-0401
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6690
11. Nozzle and Holder 16600-Z5519
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105031-4650
14. NOZZLE 105015-6380
15. NOZZLE SET

Include in #1:

101603-9420 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

ZEXEL 101603-9420 1016039420


Zexel num
Bosch num
Firm num
Name
101603-9420 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.4 3.35 3.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.8
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   66.3 64.7 67.9
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   9.5 7.7 11.3
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.8)
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   66.3 65.3 67.3
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-0.2
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   73 69.8 76.2
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   C
Rack position   R1(11.8)
Pump speed r/min   1400 1400 1400
Average injection quantity mm3/st.   81 77 85
Fixing the lever   *
Injection quantity adjustment_06
Adjusting point   I
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   84 84 94
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   850--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   800
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   2 1.5 2.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101603-9420
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)RACK LIMIT
----------
T1=B55
----------

Speed control lever angle

Test data 101603-9420
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=26.5deg+-5deg b=(34deg)+-3deg

Stop lever angle

Test data 101603-9420
N:Pump normal S:Stop the pump.
----------

----------
a=20deg+-5deg b=40deg+-5deg

Timing setting

Test data 101603-9420
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(60deg)




Information:

(1) Maximum permissible temperature of the gear for installation on the camshaft (do not use a torch) ... 315°C (600°F)(2) Tight fit between the gear and camshaft ... 0.037 to 0.123 mm (.0015 to .0048 in)(3) Diameter of the surfaces (journals) for the camshaft bearings (new) ... 69.850 0.013 mm (2.7500 .0005 in) Bore in front bearing for the camshaft (after assembly) ... 69.969 0.048 mm (2.7547 .0019 in)Bore in the other six bearings for the camshaft (after assembly) ... 69.982 0.061 mm (2.7552 .0024 in)(4) Thickness of thrust plate (new) ... 4.65 0.03 mm (.183 .001 in) End play of the camshaft ... 0.10 to 0.26 mm (.004 to .010 in) (5) Height of camshaft lobes.To find lobe height, use the procedure that follows:A. Measure camshaft lobe height (5).B. Measure base circle (7).C. Subtract base circle (STEP B) from lobe height (STEP A). The difference is actual lobe lift (6).D. Specified camshaft lobe lift (6) is:4W2430 Camshaft Assembly
a. Exhaust lobe ... 10.211 mm (.4020 in)b. Intake lobe ... 10.211 mm (.4020 in)7W3797 Camshaft Assembly
a. Exhaust lobe ... 10.210 mm (.4020 in)b. Intake lobe ... 10.212 mm (.4021 in)Maximum permissible difference between actual lobe lift (STEP C) and specified lobe lift (STEP D) is 0.13 mm (.005 in).Intake Valve Timing
1. Check the No. 1 intake valve clearance with the engine stopped. The valve clearance must be 0.30 to 0.46 mm (.012 to .018 in). If the valve clearance is not in this range, adjust the clearance to 0.38 mm (.015 in).2. Mark Top Center Position of the crankshaft on the vibration damper or pulley.3. Use a dial indicator to measure the intake valve movement.4. Rotate the crankshaft in the direction of normal engine rotation. Stop when the intake valve is 1.91 mm (.075 in) off its seat in the opening sequence.At this point the crankshaft Top Center Position Mark must be in position as follows: Engines with the 4W2430 Camshaft Assembly ... 7 2° After Top CenterEngines with the 7W3797 Camshaft Assembly ... 1 2° After Top CenterChecking Valve-Camshaft Timing (field procedure)
The following factory procedure as described in the December 11, 1989 Service Magazine article will simplify in the field checking of the camshaft timing procedures.1. Set the No. 3 intake bridge adjustment.2. Set the No. 3 intake valve clearance.3. Install the bolt in the flywheel with No. 1 piston at top center.4. Install the dial indicator (magnetic base) to No. 3 intake bridge.5. Remove the bolt from the flywheel.6. Set the gauge at zero and rotate the engine in the normal direction of operation (counterclockwise as seen from the flywheel end) until dial travel stops.The following chart indicates the correct setting.

Have questions with 101603-9420?





Group cross 101603-9420 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16713Z5773 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16713Z5774 
INJECTION-PUMP ASSEMBLY
FE6B
101603-9420  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16713Z5776 
INJECTION-PUMP ASSEMBLY
FE6B

Yanmar 

9 400 615 298 
12861351010 
INJECTION-PUMP ASSEMBLY
6GHD

Nissan-Diesel 

 
16713Z5811 
INJECTION-PUMP ASSEMBLY
FE6B

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
6D16

Nissan-Diesel 

 
16800Z5508 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16800Z5509 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16713Z5814 
INJECTION-PUMP ASSEMBLY
FE6B
 
16700Z5676 
INJECTION-PUMP ASSEMBLY
FE6B
Back to top