101603-9061 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016039061


 

Information injection-pump assembly

ZEXEL 101603-9061 1016039061
101603-9061 INJECTION-PUMP ASSEMBLY
Rating:
61
Buy INJECTION-PUMP ASSEMBLY 101603-9061 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101603-9061 
 
   
INJECTION-PUMP ASSEMBLY




Information:

preparatory steps: a) remove rocker shaft assemblyb) remove water temperature regulator1. Disconnect the fuel ratio control sensing line (1). Remove the sensing line clamp bolt (2). 2. Disconnect the turbocharger oil supply line (3) and the oil drain line (4).3. Remove the fuel injection lines (5) and install protective caps.4. Disconnect the air compressor water return line (8). 5. Remove the retaining bolts (7) and the fan drive mounting bracket (6).6. Remove the cylinder head retaining bolts. Attach a hoist and remove the cylinder head assembly-weight 240 lbs. (109,1 kg).Install Cylinder Head Assembly
1. Thoroughly clean the sealing surfaces of the cylinder head and cylinder block. Position a new head gasket on the engine and install the cylinder head assembly.2. Install the push rods and rocker shaft assembly.3. Coat the threads of the cylinder head retaining bolts with 4S9416 Anti-Seize Compound. Install bolts and washers, and tighten them in the following sequence: 1 - Tighten all numbered bolts in numerical order to 115 lb. ft. (15,9 mkg).2 - Retighten all numbered bolts in numerical order to 175 5 lb. ft. (24,2 0,7 mkg).3 - Finally, retighten all numbered bolts (hand torque only) in numerical order to 175 5 lb. ft. (24,2 0,7 mkg).4 - Tighten all lettered bolts in alphabetical order to 22 lb. ft. (3,0 mkg).5 - Retighten all lettered bolts in alphabetical order to 32 5 lb. ft. (4,4 0,7 mkg).6 - Finally, retighten all lettered bolts (hand torque only) in alphabetical order to 32 5 lb. ft. (4,4 0,7 mkg).4. Adjust the inlet and exhaust valve clearance as covered in INSTALL ROCKER SHAFT ASSEMBLY AND PUSH RODS.5. Connect the air compressor water return line.6. Install the fuel lines and tighten the retaining nuts to 30 5 lb. ft. (4,1 0,7 mkg).7. Connect the turbocharger oil supply line and the oil drain line.8. Connect the fuel ratio control sensing line and install the sensing line clamp bolt.9. Install the fan drive mounting bracket and retaining bolts.concluding steps: a) install water temperature regulatorb) install valve cover

Have questions with 101603-9061?





Group cross 101603-9061 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
6D22

Dpico 

 
 
INJECTION-PUMP ASSEMBLY
6D22

Nissan-Diesel 

 
 
INJECTION-PUMP ASSEMBLY
NE6
9 400 615 285 
1671395076 
INJECTION-PUMP ASSEMBLY
NE6
9 400 615 286 
 
INJECTION-PUMP ASSEMBLY
6D16

Nissan-Diesel 

 
 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
16713Z6103 
INJECTION-PUMP ASSEMBLY
FE6B
 
1671395100 
INJECTION-PUMP ASSEMBLY
NE6
9 400 615 287 
1671395101 
INJECTION-PUMP ASSEMBLY
NE603
 
 
INJECTION-PUMP ASSEMBLY
FE6B
101603-9061  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 619 533 
16700Z5667 
INJECTION-PUMP ASSEMBLY
FE6B
9 400 615 288 
16700Z5706 
INJECTION-PUMP ASSEMBLY
FE6B
 
16700Z5668 
INJECTION-PUMP ASSEMBLY
FE6B
 
 
INJECTION-PUMP ASSEMBLY
FE6A
 
16713Z5673 
INJECTION-PUMP ASSEMBLY
FE6A
 
 
INJECTION-PUMP ASSEMBLY
FE6B
 
16713Z5674 
INJECTION-PUMP ASSEMBLY
FE6B
Back to top