101603-8100 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016038100 1156027871


 

Information injection-pump assembly

ZEXEL 101603-8100 1016038100
ISUZU 1156027871 1156027871
101603-8100 INJECTION-PUMP ASSEMBLY
Rating:
54
Buy INJECTION-PUMP ASSEMBLY 101603-8100 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101603-8100 1016038100
ISUZU 1156027871 1156027871


Zexel num
Bosch num
Firm num
Name
101603-8100 
101603-8101 
 
1156027871  ISUZU
INJECTION-PUMP ASSEMBLY
6SA1 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.7 3.65 3.75
Rack position
After adjusting injection quantity.
  R=A
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   12.3
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   79 77.4 80.6
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   260 260 260
Average injection quantity mm3/st.   9.1 7.1 11.1
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12.3)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   79 78 80
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.1
Pump speed r/min   1350 1350 1350
Average injection quantity mm3/st.   92.2 89 95.4
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   I
Rack position   -
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   121 121 153
Fixing the lever   *
Timer adjustment
Pump speed r/min   900--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   850
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   (900)
Advance angle deg.   1 0.4 1
Remarks
Measure the actual speed.
 
Timer adjustment_04
Pump speed r/min   1150
Advance angle deg.   1.7 1.2 2.2
Timer adjustment_05
Pump speed r/min   1300
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101603-8100
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm.
----------
T1=F25
----------

Speed control lever angle

Test data 101603-8100
F:Full speed I:Idle (1)Use the pin at R = aa (2)Stopper bolt setting
----------
aa=58mm
----------
a=22deg+-5deg b=(39deg)+-3deg

Stop lever angle

Test data 101603-8100
N:Pump normal S:Stop the pump.
----------

----------
a=25deg+-5deg b=40deg+-5deg

0000001501 I/P WITH LOAD PLUNGER ADJ

Plunger assembly number: PL (stamping: ST) 1. Adjustment procedures (1)Insert the pre-stroke adjusting shims L1 for each cylinder. (2)Adjust injection quantity.(max. var. bet. cyl. idling a1, full a2) (3)At basic point A, adjust so that the pre-stroke is L2. (4)Reconfirm the injection quantity.
----------
PL=131153-5620 ST=A735 L1=1mm L2=3.7+-0.05mm a1=+-14% a2=+-2.5%
----------

Timing setting

Test data 101603-8100
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=8.5deg
----------
a=(40deg)




Information:

start by:a) remove pistons 1. Remove bearings (3) from the connecting rod and connecting rod cap.2. Remove retainer ring (1) with tool (A).3. Remove pin (2) and connecting rod (4) from the piston. 4. Remove the piston rings (5) from the piston with tool (B). Clean the piston ring grooves on the pistons with an acceptable ring groove cleaning tool. See USE OF PISTON PIN BEARING REMOVAL AND INSTALLATION TOOLS, SPECIAL INSTRUCTIONS, Form No. SMHS7295.5. Heat the connecting rod (4) in an oven to a temperature of 350°-500°F (177°-260°C). Never use a direct flame to heat a connecting rod. 6. Put connecting rod (4) in position on the base plate of tooling (C). Put a new rod pin bearing (6) on the adapter part of tooling (C). The old bearing is pushed out by tooling (C) as the new bearing is installed.7. Use tooling (C) to push the new bearing into the connecting rod until the push adapter of tooling (C) makes full contact with the connecting rod surface.8. Use a pin boring machine to make the rod pin bearing the correct size. The bore in the new rod pin bearing must be 2.0012 .0003 in. (50.830 0.008 mm).9. Check the clearance between the ends of the piston rings. See PISTONS AND RINGS in SPECIFICATIONS.10. Install the oil ring spring in the oil ring groove of the piston. The oil ring is to be installed over the spring with the oil ring end gap 180° from the oil ring spring joint. 11. Install the oil ring on the piston with tool (B).12. Install the second (intermediate) piston ring with the side that has the identification "UP-2" toward the top of the piston with tool (B).13. Install the first (top) piston ring with the side that has the identification "UP-1" toward the top of the piston with tool (B). After the installation of all three piston rings, put the piston rings in position so the end gaps are 120° apart. 14. Put the piston in position on connecting rod (4). Put clean engine oil on pin (2) and install the pin. Install retainer rings (1) with tool (A). Make sure the retainer rings are in the grooves of the piston.15. Install bearings (3) in the connecting rod and connecting rod cap.end by:a) install pistons

Have questions with 101603-8100?





Group cross 101603-8100 ZEXEL

Isuzu 

101603-8100  

101603-8101 
 
1156027871 
INJECTION-PUMP ASSEMBLY
6SA1
9 400 615 243 
 
INJECTION-PUMP ASSEMBLY
6SA1

Isuzu 

9 400 615 243 
1156027872 
INJECTION-PUMP ASSEMBLY
6SA1
9 400 615 244 
1156028240 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156028220 
INJECTION-PUMP ASSEMBLY
6BG1-MTC
 
1156028221 
INJECTION-PUMP ASSEMBLY
6BG1-MTC
9 400 615 245 
8943939730 
INJECTION-PUMP ASSEMBLY
6HE1-S
 
8943943140 
INJECTION-PUMP ASSEMBLY
6HE1-S
9 400 615 246 
8943943141 
INJECTION-PUMP ASSEMBLY
6HE1-S
9 400 615 247 
1156027610 
INJECTION-PUMP ASSEMBLY
6SA1
F 019 Z10 602 
 
INJECTION-PUMP ASSEMBLY
9 400 615 248 
 
INJECTION-PUMP ASSEMBLY
6HE1

Isuzu 

9 400 615 248 
8943947350 
INJECTION-PUMP ASSEMBLY
6HE1
9 400 613 119 
1156028890 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 612 205 
1156029030 
INJECTION-PUMP ASSEMBLY
6SA1-T
9 400 615 249 
1156029040 
INJECTION-PUMP ASSEMBLY
6SA1
Back to top