Information injection-pump assembly
BOSCH
9 400 615 217
9400615217
ZEXEL
101603-7821
1016037821
ISUZU
1156027931
1156027931

Rating:
Service parts 101603-7821 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
1-15300-266-4
12.
Open Pre:MPa(Kqf/cm2)
18.1{185}
15.
NOZZLE SET
Cross reference number
BOSCH
9 400 615 217
9400615217
ZEXEL
101603-7821
1016037821
ISUZU
1156027931
1156027931
Zexel num
Bosch num
Firm num
Name
101603-7821
9 400 615 217
1156027931 ISUZU
INJECTION-PUMP ASSEMBLY
6BG1-TC2 K
6BG1-TC2 K
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-4920
Overflow valve opening pressure
kPa
127
107
147
Overflow valve opening pressure
kgf/cm2
1.3
1.1
1.5
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-5-3-6-
2-4
Pre-stroke
mm
4.9
4.85
4.95
Rack position
After adjusting injection quantity. R=A
After adjusting injection quantity. R=A
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-5 deg. 60 59.5 60.5
Cal 1-5 deg. 60 59.5 60.5
Difference between angles 2
Cal 1-3 deg. 120 119.5 120.5
Cal 1-3 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cyl.1-2 deg. 240 239.5 240.5
Cyl.1-2 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-4 deg. 300 299.5 300.5
Cal 1-4 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
-
Rack position
13
Pump speed
r/min
850
850
850
Average injection quantity
mm3/st.
87.7
86.1
89.3
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_02
Adjusting point
H
Rack position
9.5+-0.5
Pump speed
r/min
275
275
275
Average injection quantity
mm3/st.
8
6.7
9.3
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_03
Adjusting point
A
Rack position
R1(13)
Pump speed
r/min
850
850
850
Average injection quantity
mm3/st.
87.7
86.7
88.7
Basic
*
Fixing the lever
*
Boost pressure
kPa
33.3
33.3
Boost pressure
mmHg
250
250
Injection quantity adjustment_04
Adjusting point
B
Rack position
R1+0.05
Pump speed
r/min
1400
1400
1400
Average injection quantity
mm3/st.
95.5
92.3
98.7
Fixing the lever
*
Boost pressure
kPa
33.3
33.3
Boost pressure
mmHg
250
250
Injection quantity adjustment_05
Adjusting point
C
Rack position
R2(R1-0.
5)
Pump speed
r/min
550
550
550
Average injection quantity
mm3/st.
72.8
69.6
76
Fixing the lever
*
Boost pressure
kPa
33.3
33.3
Boost pressure
mmHg
250
250
Injection quantity adjustment_06
Adjusting point
D
Rack position
R2-1.35
Pump speed
r/min
550
550
550
Average injection quantity
mm3/st.
54
50.8
57.2
Fixing the lever
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Injection quantity adjustment_07
Adjusting point
I
Rack position
-
Pump speed
r/min
150
150
150
Average injection quantity
mm3/st.
96
96
128
Fixing the lever
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Boost compensator adjustment
Pump speed
r/min
550
550
550
Rack position
R2-1.35
Boost pressure
kPa
4
4
6.7
Boost pressure
mmHg
30
30
50
Boost compensator adjustment_02
Pump speed
r/min
550
550
550
Rack position
R2(R1-0.
5)
Boost pressure
kPa
20
20
20
Boost pressure
mmHg
150
150
150
Timer adjustment
Pump speed
r/min
1200--
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
1150
Advance angle
deg.
0.5
Timer adjustment_03
Pump speed
r/min
1400
Advance angle
deg.
3
2.5
3.5
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Torque cam stamping: T1
(2)Tolerance for racks not indicated: +-0.05mm.
(3)Boost compensator stroke: BCL
----------
T1=F37 BCL=1.35+-0.1mm
----------
----------
T1=F37 BCL=1.35+-0.1mm
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Use the hole at R = aa
(2)Stopper bolt set position 'H'
----------
aa=35mm
----------
a=39.5deg+-5deg b=39deg+-3deg
----------
aa=35mm
----------
a=39.5deg+-5deg b=39deg+-3deg
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=25deg+-5deg b=40deg+-5deg
----------
----------
a=25deg+-5deg b=40deg+-5deg
0000001501 I/P WITH LOAD PLUNGER ADJ
Plunger assembly number: PL (stamping: ST)
1. Adjustment procedures
(1)Insert the pre-stroke adjusting shims L1 for each cylinder.
(2)Adjust injection quantity.(max. var. bet. cyl. idling a1, full a2)
(3)At basic point A, adjust so that the pre-stroke is L2.
(4)Reconfirm the injection quantity.
----------
PL=131153-5520 ST=A734 L1=1mm L2=4.9+-0.05mm a1=+-14% a2=+-2.5%
----------
----------
PL=131153-5520 ST=A734 L1=1mm L2=4.9+-0.05mm a1=+-14% a2=+-2.5%
----------
Timing setting

(1)Pump vertical direction
(2)Position of timer's threaded hole at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=11deg
----------
a=(60deg)
----------
aa=11deg
----------
a=(60deg)
Information:
ACTION REQUIRED
See the attached Rework Procedure.
OWNER NOTIFICATION
U.S. and Canadian owners will receive the attached Owner Notification.
SERVICE CLAIM ALLOWANCES
Service Claim Allowances for Inspection
Caterpillar Dealer Suggested Customer Suggested
Parts Labor Hrs. Parts Labor Hrs. Parts Labor Hrs.
0 1 0 0 0 0
Service Claim Allowances for Replacement of the Filter Housing (if required)
Parts Labor Hrs. Parts Labor Hrs. Parts Labor Hrs.
100% 1 0 0 0 0
Note: This is a 2-hour job if replacement is necessary.
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
MAKE EVERY EFFORT TO COMPLETE THIS PROGRAM AS SOON AS POSSIBLE.
Attach. (1-Owner Notification)
(2-Rework Procedure)
COPY OF OWNER NOTIFICATION FOR U.S. AND CANADIAN OWNERS
XYZ Corporation
3240 Arrow Drive
Anywhere, YZ 99999
Safety - THE SPIN ON FUEL FILTER BASE NEEDS TO BE INSPECTED
MODELS INVOLVED - CERTAIN 3508, 3508B, 3512, 3512B, 3516, 3516B DIESEL STANDBY ENGINES
Dear Caterpillar Product Owner:
The spin-on fuel filter base needs to be inspected on the products listed below. The stud height may be incorrect which can cause the spin-on fuel filter to blow off of the filter base and result in a fuel leakage hazard. You will not be charged for the service performed.
Contact your local Caterpillar dealer immediately to schedule this service. The dealer will advise you of the time required to complete this service. Please refer the dealer to their Service Letter dated November 23, 2000 when scheduling this service.
We regret the inconvenience this may cause you, but urge you to have this service performed for your added safety and satisfaction.
Caterpillar Inc.
Identification #(s)
Attached to November 23, 2000 Service Letter
Rework Procedure
Verification of Stud Height
Shut off the fuel supply to the engine.
Before removing the fuel filter, have a container ready to catch the fuel that will drain from the fuel system.
Remove the "Spin On" Fuel Filter. A filter wrench may be required.
Keep the fuel filter as it will be required for re-installation.
Measure the threaded nipple from the flat surface on the bottom of the filter base to the end of the nipple. See Illustration #1
Illustration #1
Check the stud height measurement from step #5 with Table #1
Table #1 - Stud Height Measurement
Acceptable Unacceptable
Stud Height 23.3 mm & up Less than 23.3 mm
If the stud height is falls in the "Unacceptable" Range, the fuel filter base must be replaced. See fuel filter base replacement instructions.
If the stud height is falls in the "Acceptable" range, the fuel filter should be reinstalled.
Return fuel flow to the engine.
Start the engine and check for leaks.
Replacement of 1N3789 Fuel Filter Base
Remove the fuel priming pump or cover from the base.
Loosen the fuel lines flowing into and out of the filter base.
Remove the fuel line adapters and the sensor (or plug) from the filter base before removing the filter base from the engine.
Remove the two mounts bolts, nuts and washers that mount the filter base. The filter base can then be removed.
Install a new 1N3789 Fuel Filter Base. Using the existing bolts, nuts and washers.
Note: The old 1N3789 Fuel Filter Base is not repairable and must be scrapped.
Reinstall the fuel line adapters and the sensor (or plug) with a new 3J1907 (adapters) and 6V5048 (sensor/plug) O-ring seals.
Reinstall the fuel lines.
Re-install the fuel priming pump or cover with new 9Y8589 and 9Y6094
See the attached Rework Procedure.
OWNER NOTIFICATION
U.S. and Canadian owners will receive the attached Owner Notification.
SERVICE CLAIM ALLOWANCES
Service Claim Allowances for Inspection
Caterpillar Dealer Suggested Customer Suggested
Parts Labor Hrs. Parts Labor Hrs. Parts Labor Hrs.
0 1 0 0 0 0
Service Claim Allowances for Replacement of the Filter Housing (if required)
Parts Labor Hrs. Parts Labor Hrs. Parts Labor Hrs.
100% 1 0 0 0 0
Note: This is a 2-hour job if replacement is necessary.
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
MAKE EVERY EFFORT TO COMPLETE THIS PROGRAM AS SOON AS POSSIBLE.
Attach. (1-Owner Notification)
(2-Rework Procedure)
COPY OF OWNER NOTIFICATION FOR U.S. AND CANADIAN OWNERS
XYZ Corporation
3240 Arrow Drive
Anywhere, YZ 99999
Safety - THE SPIN ON FUEL FILTER BASE NEEDS TO BE INSPECTED
MODELS INVOLVED - CERTAIN 3508, 3508B, 3512, 3512B, 3516, 3516B DIESEL STANDBY ENGINES
Dear Caterpillar Product Owner:
The spin-on fuel filter base needs to be inspected on the products listed below. The stud height may be incorrect which can cause the spin-on fuel filter to blow off of the filter base and result in a fuel leakage hazard. You will not be charged for the service performed.
Contact your local Caterpillar dealer immediately to schedule this service. The dealer will advise you of the time required to complete this service. Please refer the dealer to their Service Letter dated November 23, 2000 when scheduling this service.
We regret the inconvenience this may cause you, but urge you to have this service performed for your added safety and satisfaction.
Caterpillar Inc.
Identification #(s)
Attached to November 23, 2000 Service Letter
Rework Procedure
Verification of Stud Height
Shut off the fuel supply to the engine.
Before removing the fuel filter, have a container ready to catch the fuel that will drain from the fuel system.
Remove the "Spin On" Fuel Filter. A filter wrench may be required.
Keep the fuel filter as it will be required for re-installation.
Measure the threaded nipple from the flat surface on the bottom of the filter base to the end of the nipple. See Illustration #1
Illustration #1
Check the stud height measurement from step #5 with Table #1
Table #1 - Stud Height Measurement
Acceptable Unacceptable
Stud Height 23.3 mm & up Less than 23.3 mm
If the stud height is falls in the "Unacceptable" Range, the fuel filter base must be replaced. See fuel filter base replacement instructions.
If the stud height is falls in the "Acceptable" range, the fuel filter should be reinstalled.
Return fuel flow to the engine.
Start the engine and check for leaks.
Replacement of 1N3789 Fuel Filter Base
Remove the fuel priming pump or cover from the base.
Loosen the fuel lines flowing into and out of the filter base.
Remove the fuel line adapters and the sensor (or plug) from the filter base before removing the filter base from the engine.
Remove the two mounts bolts, nuts and washers that mount the filter base. The filter base can then be removed.
Install a new 1N3789 Fuel Filter Base. Using the existing bolts, nuts and washers.
Note: The old 1N3789 Fuel Filter Base is not repairable and must be scrapped.
Reinstall the fuel line adapters and the sensor (or plug) with a new 3J1907 (adapters) and 6V5048 (sensor/plug) O-ring seals.
Reinstall the fuel lines.
Re-install the fuel priming pump or cover with new 9Y8589 and 9Y6094
Have questions with 101603-7821?
Group cross 101603-7821 ZEXEL
Isuzu
101603-7821
9 400 615 217
1156027931
INJECTION-PUMP ASSEMBLY
6BG1-TC2
6BG1-TC2