Information injection-pump assembly
BOSCH
9 400 615 176
9400615176
ZEXEL
101603-7351
1016037351
ISUZU
1156025871
1156025871
Rating:
Include in #2:
104741-6831
as _
Cross reference number
BOSCH
9 400 615 176
9400615176
ZEXEL
101603-7351
1016037351
ISUZU
1156025871
1156025871
Zexel num
Bosch num
Firm num
Name
101603-7351
9 400 615 176
1156025871 ISUZU
INJECTION-PUMP ASSEMBLY
6BG1 * K
6BG1 * K
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-4920
Overflow valve opening pressure
kPa
127
107
147
Overflow valve opening pressure
kgf/cm2
1.3
1.1
1.5
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-5-3-6-
2-4
Pre-stroke
mm
3.6
3.55
3.65
Rack position
After adjusting injection quantity. R=A
After adjusting injection quantity. R=A
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-5 deg. 60 59.5 60.5
Cal 1-5 deg. 60 59.5 60.5
Difference between angles 2
Cal 1-3 deg. 120 119.5 120.5
Cal 1-3 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cyl.1-2 deg. 240 239.5 240.5
Cyl.1-2 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-4 deg. 300 299.5 300.5
Cal 1-4 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
-
Rack position
10.6
Pump speed
r/min
900
900
900
Average injection quantity
mm3/st.
54.2
52.6
55.8
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_02
Adjusting point
H
Rack position
9.5+-0.5
Pump speed
r/min
290
290
290
Average injection quantity
mm3/st.
8.4
7.1
9.7
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_03
Adjusting point
A
Rack position
R1(10.6)
Pump speed
r/min
900
900
900
Average injection quantity
mm3/st.
54.2
53.2
55.2
Basic
*
Fixing the lever
*
Injection quantity adjustment_04
Adjusting point
B
Rack position
R1(10.6)
Pump speed
r/min
1500
1500
1500
Average injection quantity
mm3/st.
66.8
63.6
70
Fixing the lever
*
Injection quantity adjustment_05
Adjusting point
I
Rack position
-
Pump speed
r/min
150
150
150
Average injection quantity
mm3/st.
87
55
119
Fixing the lever
*
Timer adjustment
Pump speed
r/min
1390--
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
1340
Advance angle
deg.
0.5
Timer adjustment_03
Pump speed
r/min
1530
Advance angle
deg.
3.5
3
4
Remarks
Finish
Finish
Test data Ex:
Governor adjustment
N:Pump speed
R:Rack position (mm)
(1)Torque cam stamping: T1
(2)Tolerance for racks not indicated: +-0.05mm.
----------
T1=C78
----------
----------
T1=C78
----------
Speed control lever angle
F:Full speed
I:Idle
(1)Use the hole at R = aa
(2)Stopper bolt set position 'H'
----------
aa=35mm
----------
a=42deg+-5deg b=35deg+-3deg
----------
aa=35mm
----------
a=42deg+-5deg b=35deg+-3deg
Stop lever angle
N:Pump normal
S:Stop the pump.
(1)Stopper bolt setting
(2)Upper lever angle
----------
----------
a=25deg+-5deg b=40deg+-5deg
----------
----------
a=25deg+-5deg b=40deg+-5deg
0000001501 ACS
(A) Set screw
(B) Push rod 1
(C) Push rod 2
(D) Cover
1. Aneroid compensator unit adjustment
(1)Select the push rod 2 to obtain L2.
(2)Screw in (A) to obtain L1.
2. Adjustment when mounting the governor.
(1)Set the speed of the pump to N1 r/min and fix the control lever at the full set position.
(2)Screw in the aneroid compensator to obtain the performance shown in the graph above.
(3)As there is hysterisis, measure when the absolute pressure drops.
(4)Hysterisis must not exceed rack position = h1.
----------
N1=900r/min L1=(1.5)mm L2=11+-0.5mm h1=0.15mm
----------
Ra=R1(10.6)mm Rb=R1-0.5mm Pa=84.5+-2.7kPa(634+-20mmHg) Pb=70.1+-0.7kPa(526+-5mmHg) Q1=54.2+-1cm3/1000st Q2=(39.8)+-1.6cm3/1000st
----------
N1=900r/min L1=(1.5)mm L2=11+-0.5mm h1=0.15mm
----------
Ra=R1(10.6)mm Rb=R1-0.5mm Pa=84.5+-2.7kPa(634+-20mmHg) Pb=70.1+-0.7kPa(526+-5mmHg) Q1=54.2+-1cm3/1000st Q2=(39.8)+-1.6cm3/1000st
0000001601 I/P WITH LOAD PLUNGER ADJ
Plunger assembly number: PL (stamping: ST)
1. Adjustment procedures
(1)Insert the pre-stroke adjusting shims L1 for each cylinder.
(2)Adjust injection quantity.(max. var. bet. cyl. idling a1, full a2)
(3)At basic point A, adjust so that the pre-stroke is L2.
(4)Reconfirm the injection quantity.
----------
PL=131154-2520 ST=A267 L1=1mm L2=3.6+-0.05mm a1=+-14% a2=+-2.5%
----------
----------
PL=131154-2520 ST=A267 L1=1mm L2=3.6+-0.05mm a1=+-14% a2=+-2.5%
----------
Timing setting
(1)Pump vertical direction
(2)Position of timer's threaded hole at the No. 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=12deg
----------
a=(60deg)
----------
aa=12deg
----------
a=(60deg)
Information:
This Revised Service Letter replaces the 20Nov2008 Service Letter. Changes have been made to Parts Needed Description.
TERMINATION DATE
30Nov2010
PROBLEM
The existing governor linkage can separate at the riveted joint on certain C1.6 engines. If the existing governor linkage fails, it can result in loss of engine speed governing.
AFFECTED PRODUCT
Model Identification Number
C1.6 C1M00596-00703, 740-883
PARTS NEEDED
Qty
Part Number Description
1 2152619 GASKET
1 2908469 LEVER AS
1 2952235 GASKET
In order to allow equitable parts availability to all participating dealers, please limit your initial parts order to not exceed 9% of dealership population. This is an initial order recommendation only, and the ultimate responsibility for ordering the total number of parts needed to satisfy the program lies with the dealer.
ACTION REQUIRED
Gain access to engine front cover and fuel pump. Replace the existing governor linkage using the following steps.
Refer to service manual module RENR2424.
Refer to the attached Rework Procedure.
SERVICE CLAIM ALLOWANCES
Product smu/age whichever comes first Caterpillar Dealer Suggested Customer Suggested
Parts % Labor Hrs% Parts % Labor Hrs% Parts % Labor Hrs%
0-2000 hrs,
0-24 mo 100.0% 100.0% 0.0% 0.0% 0.0% 0.0%
This is a 8.0-hour job
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Rework Procedure
Refer to service manual module RENR2424.
1. Remove fuel injection pump. Refer to SMCS 1251-011 (Fuel Injection Pump-Remove).
2. Remove crankshaft pulley. Refer to SMCS 1205-010 (Crankshaft Pulley-Remove and Install).
3. Remove engine front cover. Refer to SMCS 1151-011 (Housing (Front) Remove).
4. Remove fuel injection pump linkage from housing. Refer to SMCS 1151-015 (Housing (Front)-Disassemble).
5. Install new 290-8469 fuel injection pump linkage. Refer to 'Installation of fuel injection pump linkage' within SMCS 1151-016 (Housing (Front)-Assemble).
6. Install engine front cover with new gasket. Refer to SMCS 1151-012 (Housing (Front)-Install).
7. Install crankshaft pulley. Refer to SMCS 1205-010 (Crankshaft Pulley - Remove and Install).
8. Install fuel injection pump. Refer to SMCS 1251-012 (Fuel Injection Pump - Install).
9. Run engine to ensure correct operation. Check for any signs of leaks.
10. Check low and high idle, and reset appropriately.
11. Refit any machine parts that were removed to gain access to engine front cover and fuel pump.
Have questions with 101603-7351?
Group cross 101603-7351 ZEXEL
Isuzu
Isuzu
101603-7351
9 400 615 176
1156025871
INJECTION-PUMP ASSEMBLY
6BG1
6BG1