101603-6220 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016036220


 

Information injection-pump assembly

ZEXEL 101603-6220 1016036220
101603-6220 INJECTION-PUMP ASSEMBLY
Rating:
40
Buy INJECTION-PUMP ASSEMBLY 101603-6220 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101603-6220 1016036220


Zexel num
Bosch num
Firm num
Name
101603-6220 
101603-6221 
 
  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D14 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5520
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.3 3.25 3.35
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11
Pump speed r/min   850 850 850
Each cylinder's injection qty mm3/st.   65 63 67
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   275 275 275
Each cylinder's injection qty mm3/st.   10.5 9 12
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11)
Pump speed r/min   850 850 850
Average injection quantity mm3/st.   65 64 66
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(11)
Pump speed r/min   1450 1450 1450
Average injection quantity mm3/st.   77.5 75.5 79.5
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   C
Rack position   R1(11)
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   51.5 49.5 53.5
Fixing the lever   *
Injection quantity adjustment_06
Adjusting point   I
Rack position   14.1+-0. 5
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   90 70 110
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   900--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   850
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   900
Advance angle deg.   0.8
Timer adjustment_04
Pump speed r/min   1200
Advance angle deg.   2.6 2.1 3.1
Timer adjustment_05
Pump speed r/min   1500
Advance angle deg.   5.5 5 6
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101603-6220
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)RACK LIMIT
----------
T1=A10
----------

Speed control lever angle

Test data 101603-6220
F:Full speed I:Idle (1)Stopper bolt set position 'H'
----------

----------
a=18.5deg+-5deg b=40.5deg+-3deg

Stop lever angle

Test data 101603-6220
N:Engine manufacturer's normal use S:Stop the pump. (1)Set the stopper bolt at speed = rated point and rack position = aa (non-injection rack position). Confirm non-injection. (2)After setting the stopper bolt , confirm non-injection at pump speed bb. Rack position = cc (non-injection rack position). (3)Rack position = approximately dd (4)Free (at shipping)
----------
aa=(5.4)mm bb=275r/min cc=(7.4)mm dd=17.4mm
----------
a=38.5deg+-5deg b=(27deg) c=17deg+-5deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=400+-5r/min Ra=9.2mm
----------

0000001601 ACS

Test data 101603-6220
(A) Housing (B) Snap ring (C) adjusting screw (D) Set screw (E): Push rod (F) Spacer 1. Adjustment of the aneroid compensator (1)Adjust with the (D) set screw so that the clearance between the (A) housing and (B) snap ring is L1. (2)Select the push rod (E) so that the distance from the end surface of the (F) spacer becomes L2. (3)(C) Turn the screw to adjust the beginning of aneroid compensator operation. 2. Adjustment when mounting the governor. (1)Set the speed of the pump to N1 r/min and fix the control lever at the full set position. (2)Adjust using screw C to obtain the performance shown in the graph above. (3)After final adjustment, confirm that the gap between housing (A) and snapring (B) is L3.
----------
N1=850r/min L1=1.4~1.7mm L2=0.5+-0.5mm L3=(0.1~0.5)mm
----------
Ra=R1(11)mm Rb=R1-0.3mm Pa=89.8+-2.7kPa(674+-20mmHg) Pb=79.4kPa(596mmHg) Q1=65+-1cm3/1000st Q2=(59)cm3/1000st

Timing setting

Test data 101603-6220
(1)Pump vertical direction (2)Position of timer's tooth at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=13deg
----------
a=(0deg)




Information:

Use the following tests for troubleshooting and repair steps. Use the ""Test for Cylinder Cutout"" in order to determine if the replacement of individual injectors is needed. Replace suspect injectors with the part number of the original injector. Use the ""Test for Leakage from Poppet Valve"" in order to determine if the full set of injectors need to be replaced. For replacement of the full set of injectors, use the current injectors and new software that is listed in Table 2.Test for Cylinder Cutout
The cylinder cutout test should be used in order to determine if an individual injector may have caused the failure.
Warm the engine out of cold mode.
Connect Cat ET to the engine while the engine is running.
Ensure that the engine speed is 1200 rpm 125 rpm. An extremely rough running engine will need to be diagnosed by other methods.
Cut out one bank of cylinders. Note engine rpm and the fuel position on the Cat ET screen at that time.
Cut out one of the remaining cylinders from the cylinder bank that is running. Allow the engine to stabilize, and note the fuel position.
Give power back to that cylinder. Allow the engine to stabilize. Note the fuel position.
Repeat steps 5 through 6 until the cylinder bank has been completely checked.
Power all cylinders. Allow the engine to stabilize.
Cut out the other cylinder bank and repeat steps 5 through 8.
Repeat steps 4 through 9 with the engine at 2000 rpm.
Compare the results from the fuel position from each cylinder.
If the cylinder was cut out and the fuel position did not change the cylinder may not have been producing power. This cylinder would be suspect.
When you are finished with the test, reduce engine RPM to low idle. Shut off the engine.
Replace any suspect injector with a similar original injector. Install new seals for the injector and the jumper tube during this repair. The repair procedure for the injector is found in Special Instruction, REHS0116.It is possible that multiple injectors are functioning improperly. Complete ""Test for Leakage from Poppet Valve"" in order to evaluate possible excessive leakage from the injectors.Test for Leakage from Poppet Valve
Warm the engine out of Cold Mode to normal operating temperature.
Turn off the engine.
Remove the valve cover bolts in preparation in order to observe the injectors. Leave the covers in place.
Hot oil and components can cause personal injury.Do not allow hot oil or components to contact skin.
Restart the engine and run at low idle with no load.
Use Cat ET in order to perform the test that overrides the injection actuation system. Increase injection actuation pressure to the maximum value.
Observe all of the injectors under each valve cover for leakage at the spill port. A small amount of dripping is acceptable. However, a continuous stream of oil is an indication of excessive leakage of the poppet valve. Only leaks at the spill port are an indication of excessive leakage from the poppet valve.
If multiple injectors display excessive leakage from the poppet valves, update the set of injectors with

Have questions with 101603-6220?





Group cross 101603-6220 ZEXEL

Mitsubishi 

 
 
INJECTION-PUMP ASSEMBLY
6D14T
 
 
INJECTION-PUMP ASSEMBLY
6D14T
 
ME035585 
INJECTION-PUMP ASSEMBLY
6D14T
 
ME035600 
INJECTION-PUMP ASSEMBLY
6D15
101603-6220  

101603-6221 
 
 
INJECTION-PUMP ASSEMBLY
6D14
9 400 615 115 
ME035639 
INJECTION-PUMP ASSEMBLY
6D14
 
 
INJECTION-PUMP ASSEMBLY
6D15CT
9 400 615 116 
ME032949 
INJECTION-PUMP ASSEMBLY
6D15CT
9 400 615 117 
ME032934 
INJECTION-PUMP ASSEMBLY
6D14MT
 
ME035699 
INJECTION-PUMP ASSEMBLY
6D15
9 400 610 274 
ME032957 
INJECTION-PUMP ASSEMBLY
6D14CT
 
ME035574 
INJECTION-PUMP ASSEMBLY
6D14
 
ME056479 
INJECTION-PUMP ASSEMBLY
6D22
 
 
INJECTION-PUMP ASSEMBLY
6D14
9 400 615 118 
ME035510 
INJECTION-PUMP ASSEMBLY
6D14
Back to top