101603-4590 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016034590 1156022520


 

Information injection-pump assembly

ZEXEL 101603-4590 1016034590
ISUZU 1156022520 1156022520
101603-4590 INJECTION-PUMP ASSEMBLY
Rating:
75
Buy INJECTION-PUMP ASSEMBLY 101603-4590 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101603-4590 1016034590
ISUZU 1156022520 1156022520


Zexel num
Bosch num
Firm num
Name
101603-4590 
101603-4594 
 
1156022520  ISUZU
INJECTION-PUMP ASSEMBLY
6BG1S *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.6
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   74.5 72.9 76.1
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   9.6+-0.5
Pump speed r/min   260 260 260
Average injection quantity mm3/st.   9.4 8.1 10.7
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.6)
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   74.5 73.5 75.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.25
Pump speed r/min   1500 1500 1500
Average injection quantity mm3/st.   86 82.8 89.2
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   I
Rack position   14.9+-0. 5
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   105 105 113
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   1275--
Advance angle deg.   0 0 0
Load   3/4
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1225
Advance angle deg.   0.5
Load   3/4
Timer adjustment_03
Pump speed r/min   1275
Advance angle deg.   0.5
Load   4/4
Timer adjustment_04
Pump speed r/min   1500
Advance angle deg.   5.5 5 6
Load   4/4
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101603-4590
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)RACK LIMIT
----------
T1=A93
----------

Speed control lever angle

Test data 101603-4590
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H'
----------
aa=35mm
----------
a=(44deg)+-3deg b=42deg+-5deg

Stop lever angle

Test data 101603-4590
N:Pump normal S:Stop the pump.
----------

----------
a=25deg+-5deg b=40deg+-5deg

Timing setting

Test data 101603-4590
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=13deg
----------
a=(60deg)




Information:


PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Rework Procedure
Diesel Exhaust Fluid Pressure Line Removal Process:
1. Follow the Disassembly and Assembly, UENR4468, for Diesel Exhaust Fluid Lines ? Remove and Install, steps 1 to 9 to remove the DEF pressure line.
2. Remove p-clips (3) and (4) on the plate attached to the hydraulic tank and on the sound wall support leg. Keep the bolt and washer from p-clip (4) as it will be used to install the new pressure line (Image1.1.1).
Image1.1.1
3. Remove p-clip (8) from the inside of the frame and p-clips (10,12) inside of the DEF enclosure from the diesel exhaust fluid pressure line (11) (Image1.2.1).
4. Cut cable ties (9,13) near the PETU from the diesel exhaust fluid pressure line (11) (Image1.2.1).
5. Pull the diesel exhaust fluid pressure line (11) out of the machine (Image1.2.1).
Image1.2.1
DEF Injector Replacement ? Remove and Install:
1. Remove DEF injector and replace. Follow Disassembly and Assembly, UENR6559, for DEF Injector and Mounting - Remove and Install.
New Diesel Exhaust Fluid Pressure Line Preparation:
1. Lay the 3.65 m pressure line out straight on a flat surface
2. Measure 308 mm from the mating point of the line and the connector and mark the location
3. Measure 631 mm from the mating point of the line and the connector and mark the location
4. Measure 996 mm from the mating point of the line and the connector and mark the location
5. Measure 1386 mm from the mating point of the line and the connector and mark the location
6. Place p-clip (6D-4246) on the line with its edge on the 1st mark
7. Place p-clip (336-8614) on the line with its edge on the 2nd mark
8. Place p-clip (336-8614) on the line with its edge on the 3rd mark
9. Place p-clip (336-8614) on the line with its edge on the 4th mark
Note: Keep lines capped when measuring and placing the p-clips
Image1.4.1
Machine Preparation:
1. Remove bracket (1) from machine. Keep the bolt and washer as it will be used when installing the new pressure line (Image1.5.1).
2. Drill an 11 mm diameter hole in the hood support. Refer to Image1.5.2 for location and Image1.5.3 for dimensions.
3. Remove the bolt and washer on the hydraulic tank support plate and keep as it will be used when installing the new diesel exhaust fluid pressure line (Image1.5.4).
Image1.5.1
Image1.5.2
Image1.5.3
Image1.5.4
Installation Process:
1. Remove plugs from the new diesel exhaust fluid pressure line
2. Attach p-clip 6D-4246 (1) and hose to the newly drilled 11 mm hole in the hood support using hardware nut 344-5675 (qty. 1), washer 8T-4121 (qty. 2), and bolt 8T-4195 (qty. 1). Once attached, the p-clip should be oriented at 15 degrees from vertical pointing downwards. Torque hardware to 55 Nm (Image1.6.1).
Image1.6.1
3. Attach p-clip 336-8614 (2) to the hydraulic tank and secure using the removed hardware (bolt: 8T-4136 and washer: 7X-7729) from step 3 of the machine preparation. Once attached, the p-clip should be oriented at 30 degrees from vertical pointing upwards to maintain the upwards slope of the line towards the hydraulic tank. Torque hardware to 55 Nm once p-clip is oriented correctly (Image1.7.1.).
Image1.7.1
4. Connect the diesel exhaust fluid line to the DEF injector
5. Attach

Have questions with 101603-4590?





Group cross 101603-4590 ZEXEL

Isuzu 

101603-4590  

101603-4594 
 
1156022520 
INJECTION-PUMP ASSEMBLY
6BG1S
 
1156022521 
INJECTION-PUMP ASSEMBLY
6BG1S
 
1156022522 
INJECTION-PUMP ASSEMBLY
6BG1S
 
1156022523 
INJECTION-PUMP ASSEMBLY
6BG1S
9 400 615 089 
 
INJECTION-PUMP ASSEMBLY
6BG1-S

Isuzu 

9 400 615 089 
1156022524 
INJECTION-PUMP ASSEMBLY
6BG1-S