101603-2790 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016032790 220206380a


 

Information injection-pump assembly

ZEXEL 101603-2790 1016032790
HINO 220206380A 220206380a
101603-2790 INJECTION-PUMP ASSEMBLY
Rating:
44
Buy INJECTION-PUMP ASSEMBLY 101603-2790 zexel genuine, new aftermarket engine parts with delivery

Service parts 101603-2790 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-6590
3. GOVERNOR 105419-4670
4. SUPPLY PUMP 105210-6060
5. AUTOM. ADVANCE MECHANIS 105672-5450
6. COUPLING PLATE 105662-1520
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-8384
11. Nozzle and Holder 23600-3233B
12. Open Pre:MPa(Kqf/cm2) 16.7{170}/21.6{220}
13. NOZZLE-HOLDER 105030-3700
14. NOZZLE
15. NOZZLE SET 105019-2132

Include in #1:

101603-2790 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101603-2790 1016032790
HINO 220206380A 220206380a


Zexel num
Bosch num
Firm num
Name
101603-2790 
101603-2791 
 
220206380A  HINO
INJECTION-PUMP ASSEMBLY
J08C * K 14BF PE6AD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131425-0620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.8 3.77 3.83
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.75 60.25
Difference between angles 2
Cyl.1-2
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-5
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   A
Rack position   9.5
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   104.5 102.5 106.5
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   6.5+-0.5
Pump speed r/min   620 620 620
Average injection quantity mm3/st.   9.5 8.5 10.5
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   D
Rack position   9.7++
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   120 120 130
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   [N1+50]- -
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   N1(895)
Advance angle deg.   0.3
Timer adjustment_03
Pump speed r/min   (1065)
Advance angle deg.   1.5 1.2 1.8
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101603-2790
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Rack difference between N = N1 and N = N2 (5)Set idle sub-spring
----------
K=10 N1=1250r/min N2=600r/min
----------

Speed control lever angle

Test data 101603-2790
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=15deg+-5deg b=24deg+-5deg

Stop lever angle

Test data 101603-2790
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa (2)Normal stop (3)Rack position = bb or less, speed = cc
----------
aa=25mm bb=5.5mm cc=0r/min
----------
a=19deg+-5deg b=53deg+-5deg

Timing setting

Test data 101603-2790
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(20deg)




Information:

Start By:a. remove valve covers
Do not let the tops of the fuel nozzles turn when the fuel lines are loosened. The nozzles will be damaged if the top of the nozzles turns in the body.
1. Loosen the fuel injection line nut at the nozzle end with tool (A) and a 7/8 5P0328 ( in) Crow Foot Wrench.2. Loosen the fuel line nut at the fuel injection line adapter with Tool (B). Remove inner fuel injection lines (1). Install caps and plugs on all fuel line openings to keep dirt out of the fuel system.
Typical Example If necessary, use Tool (D) to turn the engine so the valves do not make contact with the pistons when the valves are opened with Tool (C) to remove the push rods.3. Put compression on the valve springs with Tool (C), and remove push rods (2). Put identification marks on the push rods as to their location in the engine.4. Push the push rod end of the rocker arms down. 5. Remove the intake valve lifter with Tool (E) as follows:a. Install 5P2685 Nut (3) and 5P6601 Collet (4) on 5P2408 Outer Handle Assembly (5).b. Install 5P6599 Inner Handle Assembly (6) in 5P2408 Outer Handle Assembly (5).
Typical Examplec. Install Tool (E) in the intake valve lifter. Hold the 5P2408 Outer Handle Assembly and tighten the 5P6599 Inner Handle Assembly until the 5P6601 Collet is tight against the inside of the intake valve lifter.
Typical Exampled. Remove intake valve lifters (7) from the cylinder block with Tool (E). Put identification marks on the lifters as to their location in the engine.
Typical Example6. Remove the exhaust valve lifters with Tool (E) as follows:a. Install 5P2685 Nut (3) and 5P6601 Collet (4) on 5P2408 Outer Handle Assembly (5). The opening in the cylinder head assembly for the intake valve lifter is larger than the opening in the exhaust valve lifter side. The tooling and each valve lifter must be installed and removed from the intake valve lifter side.b. Install the outer handle assembly in the intake valve lifter side of the cylinder head assembly. Slide the flat area of 5P2408 Outer Handle Assembly (5) through the head casting and install the 5P6601 Collet in the exhaust valve lifters.
Typical Examplec. Install 5P6599 Inner Handle Assembly (6) in 5P2408 Outer Handle Assembly (5). Hold the 5P2408 Handle Assembly and tighten the 5P6599 Handle Assembly until the 5P6601 Collet is tight against the inside of the exhaust valve lifter.d. Pull the exhaust valve lifter up until the spring on the exhaust valve lifter is free from the cylinder block.e. Remove the 5P6599 Inner Handle Assembly. Slide the 5P2408 Outer Handle Assembly through the head casting and remove it from the intake valve lifter side of the cylinder head.
Typical Examplef. Use a magnet and remove exhaust valve lifters (8) from the intake valve lifter side of the cylinder head assembly. Put identification makes on the lifters as to their location in the engine.7. Remove the guide springs from the lifters.Install Valve

Have questions with 101603-2790?





Group cross 101603-2790 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Hino 

9 400 615 061 
220205780A 
INJECTION-PUMP ASSEMBLY
H07C-T
9 400 611 994 
220205690A 
INJECTION-PUMP ASSEMBLY
H07C-T
9 400 611 598 
220205820A 
INJECTION-PUMP ASSEMBLY
W06D
9 400 612 944 
220205860A 
INJECTION-PUMP ASSEMBLY
H07C-T
9 400 615 062 
220206020A 
INJECTION-PUMP ASSEMBLY
W06D
9 400 612 531 
220206210A 
INJECTION-PUMP ASSEMBLY
J08C
9 400 612 303 
220206240A 
INJECTION-PUMP ASSEMBLY
J08C
9 400 612 747 
220206240B 
INJECTION-PUMP ASSEMBLY
J08C
9 400 615 063 
220206241A 
INJECTION-PUMP ASSEMBLY
J08C
 
220206340A 
INJECTION-PUMP ASSEMBLY
W06D-TI
9 400 615 064 
220206340B 
INJECTION-PUMP ASSEMBLY
W06D-TI
 
220206350A 
INJECTION-PUMP ASSEMBLY
J08C-T
9 400 615 065 
220206350B 
INJECTION-PUMP ASSEMBLY
J08C-T
F 019 Z10 797 
220206350C 
INJECTION-PUMP ASSEMBLY
J08C-T
101603-2790  

101603-2791 
 
220206380A 
INJECTION-PUMP ASSEMBLY
J08C
9 400 613 368 
220206380B 
INJECTION-PUMP ASSEMBLY
J08C
F 019 Z10 982 
220206381A 
INJECTION-PUMP ASSEMBLY
J08C
Back to top