101603-2502 ZEXEL 9 400 611 326 BOSCH INJECTION-PUMP ASSEMBLY 9400611326 1016032502 220205222a


 

Information injection-pump assembly

BOSCH 9 400 611 326 9400611326
ZEXEL 101603-2502 1016032502
HINO 220205222A 220205222a
101603-2502 INJECTION-PUMP ASSEMBLY
Rating:
83
Buy INJECTION-PUMP ASSEMBLY 101603-2502 zexel genuine, new aftermarket engine parts with delivery

Service parts 101603-2502 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-6590
3. GOVERNOR 105419-2781
4. SUPPLY PUMP 105210-6060
5. AUTOM. ADVANCE MECHANIS 105672-5450
6. COUPLING PLATE 105663-0970
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-8470
11. Nozzle and Holder 23600-3290A
12. Open Pre:MPa(Kqf/cm2) 16.7{170}/21.6{220}
13. NOZZLE-HOLDER 105030-3700
14. NOZZLE 105025-1770
15. NOZZLE SET

Include in #1:

101603-2502 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 611 326 9400611326
ZEXEL 101603-2502 1016032502
HINO 220205222A 220205222a


Zexel num
Bosch num
Firm num
Name
101603-2502 
101603-2503 
9 400 611 326 
220205222A  HINO
INJECTION-PUMP ASSEMBLY
J08C-H * K 14BF PE6AD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131425-0620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.8 3.77 3.83
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.75 60.25
Difference between angles 2
Cyl.1-2
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-5
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   A
Rack position   9.1
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   92 90 94
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   6.6+-0.5
Pump speed r/min   395 395 395
Average injection quantity mm3/st.   9.5 8.5 10.5
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   120 120 130
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   950--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   900
Advance angle deg.   0.3
Timer adjustment_03
Pump speed r/min   1050
Advance angle deg.   1.5 1.2 1.8
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101603-2502
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Main spring setting
----------
K=14
----------

Speed control lever angle

Test data 101603-2502
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=28deg+-5deg b=13deg+-5deg

Stop lever angle

Test data 101603-2502
N:Pump normal S:Stop the pump. (1)Rack position aa or less, pump speed bb (2)Normal
----------
aa=5.8mm bb=0r/min
----------
a=19deg+-5deg b=53deg+-5deg

Timing setting

Test data 101603-2502
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(20deg)




Information:

1. Remove plug (1) from the fuel injection pump housing.2. Use Tool (D) to loosen nut (2) for the fuel injection pump to be removed. Disconnect the fuel injection line nuts, and remove the felt washer. 3. Install Tool (A) in the fuel pump housing as shown with the square end down. Use a small amount of hand force to push down on Tool (A) while the control lever is moved forward to the "FUEL ON" position. Rack travel will stop in the center (zero) position. Hold a light forward force on the governor control lever to keep the fuel racks in the center (zero) position.4. Use Tool (B) to remove bushing (3) from the fuel injection pump housing. 5. Remove bushing (3) and O-ring seal (4).
When injection pumps, spacers and lifters are removed from the injection pump housing, keep the parts of each pump together so they can be installed in their original location.
6. Use Tool (C) to remove fuel injection pump (5). 7. Remove spacer (6) from the fuel injection pump housing. Make a note of the position from which each spacer was removed so each spacer can be installed in its original position.
Be careful when the fuel injection pumps are disassembled. Do not damage the surfaces of the plungers, barrels and bonnets. Any scratches will cause leakage inside the fuel injection pump. The plunger and barrel for each pump are made as a set. Do not put the plunger of one pump in the barrel of another pump. The check assemblies are made as a set. Do not mix the parts of the different check assemblies. Do not remove or make any adjustments of the gear segment on the plunger. It has been preset at the factory. If one part has wear, install a complete new pump assembly. Be careful when the plunger is put into the bore of the barrel.
8. Disassemble the fuel injection pump as follows: Remove ring (7). Separate bonnet (10) from barrel (9). Remove the spring and the check assembly from the bonnet. Remove plunger (8), the washer and spring from barrel (9).Install Fuel Injection Pumps
1. Inspect all parts for wear or damage. The plunger and barrel are serviced only as an assembly. 2. Put clean diesel fuel on plunger (1). Put plunger (1), washer (6) and spring (2) in position on barrel (3).3. Put check valve assembly (7) and spring (8) in bonnet (9). Connect bonnet (9) and barrel (3) together with ring (4). 4. Put spacer (10) into position in the pump housing bore. Be sure the correct spacer is with each pump. 5. Note the location of dowels (11) and (12) in the fuel injection pump housing. These dowels are for alignment of the fuel injection pump. 6. Slot (13) in gear segment (5) must align with dowel (11).7. Groove (14) must engage with dowel (12). 8. Use Tool (A) to put the fuel racks in the center (zero) position. See Remove Fuel Injection Pumps.9. Use Tool

Have questions with 101603-2502?





Group cross 101603-2502 ZEXEL

Hino 

 
220205220A 
INJECTION-PUMP ASSEMBLY
J08C-H
 
220205221A 
INJECTION-PUMP ASSEMBLY
J08C-H
101603-2502  

101603-2503 
9 400 611 326 
220205222A 
INJECTION-PUMP ASSEMBLY
J08C-H
9 400 613 499 
220205223A 
INJECTION-PUMP ASSEMBLY
J08C-H
 
220205230A 
INJECTION-PUMP ASSEMBLY
J08C-TN
F 019 Z20 467 
220401231A 
INJECTION-PUMP ASSEMBLY
J-2
F 01G 09U 043 
220401232A 
INJECTION-PUMP ASSEMBLY
J-2
 
220401300A 
INJECTION-PUMP ASSEMBLY
J-2
 
220401301A 
INJECTION-PUMP ASSEMBLY
J-2
 
220401302A 
INJECTION-PUMP ASSEMBLY
J-2
 
220401320A 
INJECTION-PUMP ASSEMBLY
J-2
 
220401321A 
INJECTION-PUMP ASSEMBLY
J-2
 
220401322A 
INJECTION-PUMP ASSEMBLY
J-2
 
220401330A 
INJECTION-PUMP ASSEMBLY
J-2
 
220401331A 
INJECTION-PUMP ASSEMBLY
J-2
9 400 615 056 
220205440A 
INJECTION-PUMP ASSEMBLY
J08C-TN
 
220401370A 
INJECTION-PUMP ASSEMBLY
J-2
 
220401380A 
INJECTION-PUMP ASSEMBLY
J-2
9 400 619 846 
220401381A 
INJECTION-PUMP ASSEMBLY
J-2
F 01G 09U 044 
220401382A 
INJECTION-PUMP ASSEMBLY
J-2
 
220401450A 
INJECTION-PUMP ASSEMBLY
J-2
9 400 619 797 
220401451A 
INJECTION-PUMP ASSEMBLY
J-2
9 400 615 057 
220401452A 
INJECTION-PUMP ASSEMBLY
J-2
Back to top