101603-2495 ZEXEL 9 400 611 992 BOSCH INJECTION-PUMP ASSEMBLY 9400611992 1016032495 220205202a


 

Information injection-pump assembly

BOSCH 9 400 611 992 9400611992
ZEXEL 101603-2495 1016032495
HINO 220205202A 220205202a
101603-2495 INJECTION-PUMP ASSEMBLY
Rating:
80
Buy INJECTION-PUMP ASSEMBLY 101603-2495 zexel genuine, new aftermarket engine parts with delivery

Service parts 101603-2495 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-5621
3. GOVERNOR 105401-1022
4. SUPPLY PUMP 105210-5570
5. AUTOM. ADVANCE MECHANIS 105672-0670
6. COUPLING PLATE 105662-1680
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-8301
11. Nozzle and Holder 23600-3111A
12. Open Pre:MPa(Kqf/cm2) 15.7{170}/21.6{220}
13. NOZZLE-HOLDER 105030-4850
14. NOZZLE
15. NOZZLE SET 105019-0970

Include in #1:

101603-2495 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

BOSCH 9 400 611 992 9400611992
ZEXEL 101603-2495 1016032495
HINO 220205202A 220205202a


Zexel num
Bosch num
Firm num
Name
101603-2495 
9 400 611 992 
220205202A  HINO
INJECTION-PUMP ASSEMBLY
H07C-T K 14BF INJECTION PUMP ASSY PE6AD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   134424-0920
Overflow valve opening pressure kPa   162 147 177
Overflow valve opening pressure kgf/cm2   1.65 1.5 1.8
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   4.8 4.77 4.83
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.75 60.25
Difference between angles 2
Cyl.1-2
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-5
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   A
Rack position   10.1
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   110 108.5 111.5
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the lever   *
Boost pressure kPa   66.7 66.7
Boost pressure mmHg   500 500
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.4+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   8 7 9
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_03
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   140 140 150
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Rack limit   *
Boost compensator adjustment
Pump speed r/min   800 800 800
Rack position   9.1
Boost pressure kPa   37.3 36 38.6
Boost pressure mmHg   280 270 290
Boost compensator adjustment_02
Pump speed r/min   800 800 800
Rack position   10.1
Boost pressure kPa   56 52 60
Boost pressure mmHg   420 390 450
Timer adjustment
Pump speed r/min   1150--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1100
Advance angle deg.   0.3
Timer adjustment_03
Pump speed r/min   1400
Advance angle deg.   6 5.7 6.3
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101603-2495
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Boost compensator stroke: BCL (6)Main spring setting
----------
K=10 BCL=1+-0.1mm
----------

Speed control lever angle

Test data 101603-2495
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=18deg+-5deg b=34deg+-5deg

Stop lever angle

Test data 101603-2495
N:Pump normal S:Stop the pump. (1)Normal (2)Pump speed aa and rack position bb (to be sealed at delivery) (3)Use the hole above R = cc
----------
aa=0r/min bb=1-0.5mm cc=30mm
----------
a=21deg+-5deg b=(55deg)

Timing setting

Test data 101603-2495
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(50deg)




Information:

1. Disconnect boost hose (2) at fuel ratio control (1).2. Remove lockwire (3) and the seal from the bolts.3. Remove the two bolts that hold fuel ratio control (1).4. Pull up on the fuel ratio control, and move it toward the front of the engine so the valve on the fuel ratio will disengage with the groove (slot) in the governor collar. Remove the fuel ratio control and gasket. The following steps are for installation of the fuel ratio control.5. Install a new gasket on fuel ratio control (1).6. Engage valve (4) with the groove (slot) in collar (5) for the governor.7. Install the bolts that hold fuel ratio control (1) to the governor plate.8. Connect boost hose (2) to the fuel ratio control.9. Install new lockwire (3) and seal. See Fuel Rack Setting in Testing And Adjusting.10. Lower the hoods.Disassemble Fuel Ratio Control
Start By:a. remove fuel ratio control The illustrations which follow show a different design fuel ratio control. However, the service procedure is the same. 1. Remove two bolts (1) and cover (2). 2. Remove valve assembly (3).3. Remove seal (4) and the O-ring seal from the valve assembly.4. Remove retainer (5) and two springs (6). 5. Remove the three bolts from the cover. Remove cover (12) and gasket (11).6. Remove valve (13), diaphragm (8), retainer (9) and spring (10).7. Remove pin (14) from valve (13).8. Remove cover (7) from the valve.Assemble Fuel Ratio Control
The illustrations which follow show a different design fuel ratio control. However, the service procedure is the same. 1. Put clean SAE 30 Oil on the seal. Install seal (1) in cover (2) with the lip of the seal toward the inside of the cover. 2. Install valve (3) in cover (2).3. Install the pin that holds the cover on the valve. 4. Install the spring and the retainer in cover (6).5. Install diaphragm (5) on valve assembly (4) and in the cover.6. Install cover (8). Install three bolts (7) that hold the cover in position. 7. Put clean SAE 30 Oil on the seal and the ring seal. Install seals (11) on the valve.8. Install two springs (12), retainer (13) and valve assembly (10).9. Install housing (9) and the bolts.
Correct adjustment must be made to fuel ratio control before installation. See the topic "Adjustment Of Air Fuel Ratio Control" in Testing & Adjusting.
End By:a. install fuel ratio control

Have questions with 101603-2495?





Group cross 101603-2495 ZEXEL

Hino 

 
220205200A 
INJECTION-PUMP ASSEMBLY
H07C-T
 
 
INJECTION-PUMP ASSEMBLY
9 400 611 436 
 
INJECTION-PUMP ASSEMBLY

Hino 

9 400 611 596 
220205200B 
INJECTION-PUMP ASSEMBLY
H07C-T
9 400 611 697 
220205201A 
INJECTION-PUMP ASSEMBLY
H07C-T
101603-2495  
9 400 611 992 
220205202A 
INJECTION-PUMP ASSEMBLY
H07C-T
Back to top