101603-2383 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016032383 220009611b


 

Information injection-pump assembly

ZEXEL 101603-2383 1016032383
HINO 220009611B 220009611b
101603-2383 INJECTION-PUMP ASSEMBLY
Rating:
41
Buy INJECTION-PUMP ASSEMBLY 101603-2383 zexel genuine, new aftermarket engine parts with delivery

Service parts 101603-2383 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-6171
3. GOVERNOR 105932-2192
4. SUPPLY PUMP 105210-6300
5. AUTOM. ADVANCE MECHANIS 105680-5010
6. COUPLING PLATE 105662-1460
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-8160
11. Nozzle and Holder 23600-2980A
12. Open Pre:MPa(Kqf/cm2) 16.7{170}/21.2{220}
13. NOZZLE-HOLDER 105030-3700
14. NOZZLE
15. NOZZLE SET 105019-0810

Include in #1:

101603-2383 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101603-2383 
101603-2384 
 
220009611B  HINO
INJECTION-PUMP ASSEMBLY
J-2 * K




Information:

Start By:a. remove valve covers Call out (1) and (2) are not used in this removal procedure. Call outs begin with number (3). 1. Remove bolts (3) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (4).
To prevent damage to the fuel injection nozzle, hold adapter assembly (5) in position at the of injection nozzle (6) when fuel line nut (7) is loosened or tightened.
2. Use Tool (A) and a 7/8 5P0328 Crow Foot ( in) to loosen the fuel injection line nut at the nozzle end. 3. Use Tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (8). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (9) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (10). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (11). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (12) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies & Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (1) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 1/31/2 20 to 30 degrees ( to of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position and tighten the locknut to a torque of 30 4 N m (22 3 lb ft). Install the original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (2). 4. Put rocker shaft assemblies (3) in position on the cylinder head assembly.5. Put clean engine oil on the threads of the bolts that hold the rocker shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb ft). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb ft). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb ft).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (4). Tighten the fuel injection line adapter nuts (5) to a torque 40 7 N m (30 5 lb ft) with Tool (A).
Do not let the tops of the fuel nozzles turn when the fuel

Have questions with 101603-2383?





Group cross 101603-2383 ZEXEL

Hino 

 
220009610A 
INJECTION-PUMP ASSEMBLY
J-2
 
 
INJECTION-PUMP ASSEMBLY

Hino 

9 400 619 949 
220009611A 
INJECTION-PUMP ASSEMBLY
J-2
101603-2383  

101603-2384 
 
220009611B 
INJECTION-PUMP ASSEMBLY
J-2
F 01G 09U 042 
220009612A 
INJECTION-PUMP ASSEMBLY
J-2
9 400 615 050 
220009613A 
INJECTION-PUMP ASSEMBLY
J-2
Back to top