101603-2365 ZEXEL 9 400 615 049 BOSCH INJECTION-PUMP ASSEMBLY 9400615049 1016032365 220009593a


 

Information injection-pump assembly

BOSCH 9 400 615 049 9400615049
ZEXEL 101603-2365 1016032365
HINO 220009593A 220009593a
101603-2365 INJECTION-PUMP ASSEMBLY
Rating:
32
Buy INJECTION-PUMP ASSEMBLY 101603-2365 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

Cross reference number

Zexel num
Bosch num
Firm num
Name
101603-2365 
9 400 615 049 
220009593A  HINO
INJECTION-PUMP ASSEMBLY
J-2 K




Information:


Typical Example1. Remove bolts (1) and cover (2). Remove bolts (3) and cover (4).
Typical Example2. Remove bolts (5) and adapter (6). Be sure that gear stays in place. Remove bolts (7) and cover (8). Keep gear in place.
Typical Example3. Remove gears (9) and crankshaft gear (10). Remove bolts (11) and idler gear (12) with retainer. Remove bolts (13) and idler gear (14) with retainer.
Typical Example4. Secure strap and a hoist to housing (15). Remove hose assembly (16) and small bolts (17) and large bolts (18). 5. Remove bolts (19) that connect housing to oil pan (20). Remove housing from cylinder block. The weight of housing is approximately 105 kg (230 lb). 6. Check O-ring seal (21) and bearing (22) on adapter and replace if necessary. 7. Check bearing (23) and O-ring seal (24) on cover and replace if necessary. 8. Remove retainer (25) from gear (9) and check bearings (26) and replace if necessary. The following steps are for the installation of the flywheel housing.9. Thoroughly clean the contact surfaces of the cylinder block and flywheel housing. Install a new gasket between the flywheel housing and the cylinder clock.10. Secure strap and a hoist to the flywheel housing, put flywheel housing in position on the cylinder block. 11. Install the bolts that hold the flywheel housing to the cylinder block. Tighten bolts 1 thru 22 in number sequence to a torque of 40 10 N m (30 7 lb ft). Tighten bolts 1 thru 9 in number sequence again to a torque of 135 20 N m (100 15 lb ft). Tighten bolts 10 thru 22 in number sequence again to a torque of 55 10 N m (40 7 lb ft).12. Install bolts that connect housing to oil pan.13. Cut flywheel housing gasket off even with the cylinder block surface. Remove excess sealant.End By:a. install crankshaft rear seal and wear sleeveb. install starting motor

Have questions with 101603-2365?





Group cross 101603-2365 ZEXEL

Hino 

 
220009590A 
INJECTION-PUMP ASSEMBLY
J-2
 
 
INJECTION-PUMP ASSEMBLY

Hino 

 
220009591A 
INJECTION-PUMP ASSEMBLY
J-2
 
220009591B 
INJECTION-PUMP ASSEMBLY
J-2
9 400 611 991 
220009592A 
INJECTION-PUMP ASSEMBLY
J-2
101603-2365  
9 400 615 049 
220009593A 
INJECTION-PUMP ASSEMBLY
J-2
Back to top