101603-1870 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016031870 me056430


 

Information injection-pump assembly

ZEXEL 101603-1870 1016031870
MITSUBISHI ME056430 me056430
101603-1870 INJECTION-PUMP ASSEMBLY
Rating:
81
Buy INJECTION-PUMP ASSEMBLY 101603-1870 zexel genuine, new aftermarket engine parts with delivery

Service parts 101603-1870 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-2411
3. GOVERNOR 105490-4890
4. SUPPLY PUMP 105210-4760
5. AUTOM. ADVANCE MECHANIS 105614-4100
6. COUPLING PLATE 105662-0590
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-6021
11. Nozzle and Holder ME056371
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105030-5010
14. NOZZLE 105015-5390
15. NOZZLE SET

Include in #1:

101603-1870 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101603-1870 1016031870
MITSUBISHI ME056430 me056430


Zexel num
Bosch num
Firm num
Name
101603-1870 
101606-1440 
 
ME056430  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D22 * K 14BF PE6AD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5120
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4.5 4.45 4.55
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   9.6
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   112 108.6 115.4
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   8+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   18.5 15.7 21.3
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(9.6)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   112 111 113
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(9.6)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   113.5 111 116
Difference in delivery mm3/st.   9 9 9
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   170 150 190
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   850--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   800
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   900
Advance angle deg.   0.9 0.4 1.4
Timer adjustment_04
Pump speed r/min   1150
Advance angle deg.   3 2.5 3.5
Timer adjustment_05
Pump speed r/min   -
Advance angle deg.   4 3 5
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 101603-1870
N:Pump speed R:Rack position (mm) (1)Adjust with speed control lever at full position (minimum-maximum speed specification) (2)Adjust with the load control lever in the full position (variable speed specification). (3)Excess fuel setting for starting: SXL (4)Damper spring setting: DL
----------
SXL=11.6+-0.1mm DL=7.5-0.2mm
----------

Speed control lever angle

Test data 101603-1870
F:Full speed I:Idle (1)Pump speed = aa (2)Pump speed = bb (3)Pump speed cc (4)Air cylinder's adjustable range
----------
aa=1150r/min bb=300r/min cc=575r/min
----------
a=4deg+-5deg b=10deg+-5deg c=15deg+-5deg d=10deg

0000000901

Test data 101603-1870
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=21deg+-5deg b=23.5deg+-3deg

Stop lever angle

Test data 101603-1870
N:Pump normal S:Stop the pump. (1)Rack position = aa (2)Rack position bb
----------
aa=2.5mm bb=21mm
----------
a=71deg+-5deg b=12deg+-5deg c=(9.5deg)

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325+-5r/min Ra=7.3mm
----------

Timing setting

Test data 101603-1870
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(7deg)




Information:

Oil Consumption as an Overhaul Indicator
When an engine's oil consumption has risen to three times the initial (new) consumption rate due to normal wear, then the engine should be scheduled for overhaul. There may be a corresponding increase in blowby and a slight increase in fuel consumption.Overhaul Before Failure
A planned Overhaul Before Failure may be your best value, because you can:* Avoid costly unplanned downtime.* Reuse as many original parts as standards permit.* Extend your engine's service life without the risk of a major catastrophe had you continued to operate to failure.* Get the best cost/value relationship per hour of extended life.After Failure Overhaul
If you experience a major engine failure which requires removal of the engine from the hull, there are also many After Failure Overhaul options available. An overhaul should be performed if your block or crankshaft needs to be repaired.If the block and/or crankshaft is repairable, overhaul cost should be between 40 and 50 percent of the cost of a new engine (with like exchange core).This lower cost can be attributed to Caterpillar "designed-in" features, Caterpillar dealer and Caterpillar Remanufactured exchange components.Overhaul Recommendation
To minimize downtime and provide you with the lowest cost and highest value, Caterpillar recommends that the engine be overhauled before failure by scheduling an overhaul with your Caterpillar dealer. Overhaul programs vary with engine application and from dealer to dealer. Therefore, Caterpillar recommends that you confer with your dealer to obtain specific information regarding the types of programs offered and overhaul services provided for extending the life of your engine.If you elect to perform an overhaul without Caterpillar dealer overhaul service, you should be aware of the maintenance that follows.Inspect/Rebuild or Exchange
Cylinder Head, Connecting Rods, Pistons, Cylinder Liners, Turbocharger, Oil Pump, Spacer Plates, Fuel Ratio Control, Cam Followers, Fuel Transfer Pump, and Timing Advance.
These components should be inspected according to the instructions found in various Caterpillar reusability publications. The Index of Publications on Reusability or Salvage of Used Parts, SEBF8029, lists reusability publications needed for inspecting parts.If your parts comply with established inspection specifications expressed in the reusable parts guideline, the parts should be reused.If your parts are not within specification, the parts should be salvaged, repaired, replaced. Failure to salvage, repair, or replace out-of-spec parts can result in unscheduled downtime, costly repairs, and damage to other engine parts.In addition, using out-of-spec parts can reduce your engine's efficiency and increase fuel consumption. Reduced engine efficiency and increase fuel consumption. Reduced engine efficiency and increased fuel consumption translates into higher operating costs. Therefore, Caterpillar recommends that you salvage, repair, or replace your out-of-spec parts.Install New
Piston Rings, Main Bearings, Rod Bearings, Valve Rotators and Crankshaft Seals.
Your thrust, main, and rod bearings, valve rotators, and crankshaft seals will probably not last until your second overhaul. Caterpillar recommends the installation of new parts at each overhaul period.Inspect/Replace
Crankshaft, Camshaft, and Cam Bearings, Crankshaft Vibration Damper, Governor, Fuel Pump Camshaft, and Fuel Racks.
The ideal time for inspecting these items is while your engine is disassembled for overhaul. Inspect each

Have questions with 101603-1870?





Group cross 101603-1870 ZEXEL

Mitsubishi 

 
 
INJECTION-PUMP ASSEMBLY
6D14T
 
ME035602 
INJECTION-PUMP ASSEMBLY
6D14T
 
 
INJECTION-PUMP ASSEMBLY
6D15
 
ME035697 
INJECTION-PUMP ASSEMBLY
6D15
 
ME035694 
INJECTION-PUMP ASSEMBLY
6D14
9 400 610 040 
ME056440 
INJECTION-PUMP ASSEMBLY
6D22

M.Bishi-Hi.-Nag 

9 400 615 023 
EZ40095 
INJECTION-PUMP ASSEMBLY
6AAC
 
EZ40096 
INJECTION-PUMP ASSEMBLY
6AAC

Mitsubishi 

9 400 615 024 
ME056439 
INJECTION-PUMP ASSEMBLY
6D22
101603-1870  

101606-1440 
 
ME056430 
INJECTION-PUMP ASSEMBLY
6D22
9 400 615 025 
ME037695 
INJECTION-PUMP ASSEMBLY
6D14T
9 400 615 026 
ME037680 
INJECTION-PUMP ASSEMBLY
6D14T
Back to top