101603-0740 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1016030740 1156018621


 

Information injection-pump assembly

ZEXEL 101603-0740 1016030740
ISUZU 1156018621 1156018621
101603-0740 INJECTION-PUMP ASSEMBLY
Rating:
33
Buy INJECTION-PUMP ASSEMBLY 101603-0740 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
101603-0740 
101603-4670 
 
1156018621  ISUZU
INJECTION-PUMP ASSEMBLY
6BG1 * K




Information:

1. Drain the cooling system.2. Remove bolt (2) and spacer (1). 3. Remove clip (3) that holds line (4) to the cylinder head. 4. Remove bolts (5) that hold fuel filter base and filter (6) to the cylinder head. 5. Fasten a chain and hoist to the cylinder head lifting brackets. Remove the bolts and nuts that hold the cylinder head. Remove the cylinder head. Weight of the cylinder head is 41 kg (90 lb.). 6. Remove cylinder head gasket (7).7. Check the condition of the cylinder head assembly before installation.Install Cylinder Head Assembly
1. Use a tap of the correct size to clean each threaded hole in the cylinder block for the cylinder head mounting bolts.2. Thoroughly clean the surface for the cylinder head gasket on the cylinder head assembly and cylinder block.
Be sure the gasket is positioned so that all coolant passages in the cylinder block can be seen through the gasket.
3. Put cylinder head gasket (1) in place on the studs in the cylinder block. 4. Put the cylinder head in position on the studs.5. Put clean engine oil on the bolt threads, and install the bolts that hold the cylinder head. 6. Tighten the bolts and nuts in the number sequence shown as follows:a. Tighten all bolts and nuts in number sequence to a torque of 45 N m (35 lb.ft.).b. Tighten all bolts and nuts in number sequence to a torque of 95 N m (70 lb.ft.).c. Again, tighten all bolts and nuts in number sequence to a final torque of 135 N m (100 lb.ft.). Retighten the cylinder head bolts and nuts after the engine has run under part load for approximately thirty minutes.a. If the bolts and nuts move before the correct final torque is reached, retighten every thing in the sequence again to the final torque of 135 N m (100 lb.ft.).b. If the bolts and nuts do not move before the correct final torque is reached, back each one off 30 to 60°, and retighten again, in the sequence shown, to the final torque. After all the bolts and nuts are retightened, check the first 10 positions to make sure they are tightened to the correct torque. 7. Install fuel filter base and filter (2) on the cylinder head with bolts (3).8. Install clip (4) that holds fuel line (5) to the cylinder head.9. Install the alternator bracket bolt and spacer in the cylinder head.End By:a. install fuel injection nozzle assembliesb. install fuel injection linesc. install inlet and exhaust manifoldd. install rocker shaft and push rods

Have questions with 101603-0740?





Group cross 101603-0740 ZEXEL

Isuzu 

 
1156016181 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156016191 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018601 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018611 
INJECTION-PUMP ASSEMBLY
6BG1
101603-0740  

101603-4670 
 
1156018621 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018540 
INJECTION-PUMP ASSEMBLY
6BD1T
 
1156018550 
INJECTION-PUMP ASSEMBLY
6BD1T
 
1156018551 
INJECTION-PUMP ASSEMBLY
6BD1-T
 
1156018570 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018571 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018572 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018573 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018580 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018581 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018582 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018583 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018590 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018591 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018592 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018593 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156018594 
INJECTION-PUMP ASSEMBLY
6BG1
Back to top