101603-0284 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016030284 1156018195


 

Information injection-pump assembly

ZEXEL 101603-0284 1016030284
ISUZU 1156018195 1156018195
101603-0284 INJECTION-PUMP ASSEMBLY
Rating:
48
Buy INJECTION-PUMP ASSEMBLY 101603-0284 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101603-0284 1016030284
ISUZU 1156018195 1156018195


Zexel num
Bosch num
Firm num
Name
101603-0284 
101603-0286 
 
1156018195  ISUZU
INJECTION-PUMP ASSEMBLY
6BG1TC *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
RED3 control unit part number   407910-2 470
RED3 rack sensor specifications mm   15
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Rack position   (13.5)
Vist V   1.3 1.3 1.3
Pump speed r/min   850 850 850
Average injection quantity mm3/st.   99.5 98.5 100.5
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Injection quantity adjustment_02
Rack position   (9.5)
Vist V   2.1 2 2.2
Pump speed r/min   275 275 275
Average injection quantity mm3/st.   7.5 6.2 8.8
Max. variation between cylinders %   0 -14 14

Test data Ex:

Governor adjustment

Test data 101603-0284
(1)Adjusting range (2)Step response time (N): Speed of the pump (L): Load (theta) Advance angle (Srd1) Step response time 1 (Srd2) Step response time 2 1. Adjusting conditions for the variable timer (1)Adjust the clearance between the pickup and the protrusion to L.
----------
L=1.5+-0.2mm N2=800r/min C2=(6.4)deg t1=2--sec. t2=2--sec.
----------
N1=1200++r/min P1=0kPa(0kgf/cm2) P2=392kPa(4kgf/cm2) C1=6.4+-0.3deg R01=0/4load R02=4/4load

0000000901

Test data 101603-0284
(1)Pump vertical direction (2)Positions of coupling's threaded installation holes at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=13deg
----------
a=(60deg)

Stop lever angle

Test data 101603-0284
(Rs) rack sensor specifications (C/U) control unit part number (V) Rack sensor output voltage (R) Rack position (mm) 1. Confirming governor output characteristics (rack 15 mm, span 6 mm) (1)When the output voltages of the rack sensor are V1 and V2, check that the rack positions R1 and R2 in the table above are satisfied.
----------

----------




Information:

Action Required
See the attached procedure.
Service Claim Allowances
Group 1 Affected Product
All Group 2 Affected Product
This is a 1-hour job.
All Group 3 Affected Product
This is a .3-hour job. Submit a supplemental claim for Group 3 if a claim for Group 1 or 2 has already been submitted.
Parts Disposition
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Attach. (1-Rework Procedure)Rework Procedure
Refer to the following instructions and illustrations. Replace the existing fuel lines and their related parts with the new fuel line groups.
To insure correct clamp locations, install left and right fuel line groups as assembled. However, if clamps are removed, mark locations to insure correct positions when reassembling.
On the 992C Wheel Loader, it is necessary to remove the 6N8322 Air Outlet Tube Assembly to be able to install the right bank fuel line group.
Tighten the fuel line clamp screws to a torque of 2.25 N m (20 lb in). Do not over tighten. Use a 6V6069 Torque Screwdriver or similar tool to tighten the screws.
Group 1 Procedure
1. Clean and paint the new 6I0361 and 7E3539 Fuel Line Groups before proceeding to the job site.A) "Tape Off" the number 3, 5, and 6 fuel lines in the area of the tower clamp. (See Illustration 1 - Part 4 of 5, Section C-C)B) Install 5F2807 Plastic Caps and 2F2990 Plastic Plugs on the ends of the fuel lines.C) Clean and paint the fuel line groups.D) After drying completely, remove the tape. Do not remove the plastic caps and plugs until the fuel lines are ready to be installed on the engine. Transport the fuel line groups in their original boxes.2. Remove all mounting bolts from the fuel line brackets at the aftercooler housing. Except for the tower clamp assembly, new mounting bolts and washers will be used. Keep the washers. The washers may be needed later as spacers.3. A) Disassemble the tower clamp assembly behind the fuel injection pump. The 9Y3356 Clamp and 9Y3359 Clamp As. that form the tower clamp will be reused. (See Illustration 1 - Part 4 of 5, Section C-C)B) Disconnect the 2 line clamps from the 9Y3361 Bracket (Front V Bracket).C) Disconnect the 6 line clamps from the 7E5779 Bracket (Large V Bracket).4. Disconnect all the fuel lines at the fuel injection pump and at the adaptors in the valve cover bases.5. A) Remove the left and right side fuel line groups as separate assemblies.B) Remove the 9Y3361 Bracket (Front V Bracket). Replace it with a new 6I0347 Bracket.6. Remove the plastic caps and plugs from the fuel lines. Set the new 6I0361 Fuel Lines Group (left side) and the new 7E3539 Fuel Lines Group (right side) in place and hand tighten the fuel nuts. (See Illustration 1 - Part 1 of 5). If any of the ends of the individual fuel lines are not square with the bonnets in the fuel injection pump or with the adaptors in the valve cover bases, gently bend the lines by hand to align the

Have questions with 101603-0284?





Group cross 101603-0284 ZEXEL

Isuzu 

 
1156018190 
INJECTION-PUMP ASSEMBLY
6BG1-TC
 
1156018191 
INJECTION-PUMP ASSEMBLY
6BG1TC
 
1156018192 
INJECTION-PUMP ASSEMBLY
6BG1TC
 
1156018194 
INJECTION-PUMP ASSEMBLY
6BG1TC
101603-0284  

101603-0286 
 
1156018195 
INJECTION-PUMP ASSEMBLY
6BG1TC
 
1156018196 
INJECTION-PUMP ASSEMBLY
6BG1TC
 
1156018197 
INJECTION-PUMP ASSEMBLY
6BG1-TC
Back to top