101602-9900 ZEXEL 9 400 614 989 BOSCH INJECTION-PUMP ASSEMBLY 9400614989 1016029900 16712z5507


 

Information injection-pump assembly

BOSCH 9 400 614 989 9400614989
ZEXEL 101602-9900 1016029900
NISSAN-DIESEL 16712Z5507 16712z5507
101602-9900 INJECTION-PUMP ASSEMBLY
Rating:
78
Buy INJECTION-PUMP ASSEMBLY 101602-9900 zexel genuine, new aftermarket engine parts with delivery

Service parts 101602-9900 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-9430
3. GOVERNOR 105400-5430
4. SUPPLY PUMP 105220-7050
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156637-9820
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6190
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 22.6(230)
13. NOZZLE-HOLDER 105031-4520
14. NOZZLE 105015-5170
15. NOZZLE SET

Include in #1:

101602-9900 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 614 989 9400614989
ZEXEL 101602-9900 1016029900
NISSAN-DIESEL 16712Z5507 16712z5507


Zexel num
Bosch num
Firm num
Name
101602-9900 
9 400 614 989 
16712Z5507  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
FD6 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3 2.95 3.05
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9
Pump speed r/min   750 750 750
Average injection quantity mm3/st.   45.2 43.6 46.8
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   7.5+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   10 8.2 11.8
Max. variation between cylinders %   0 -12 12
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 101602-9900
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Rack difference between N = N1 and N = N2
----------
K=15 N1=750r/min N2=450r/min
----------

Speed control lever angle

Test data 101602-9900
F:Full speed I:Idle M:Minimum-maximum speed (1)Set the pump speed at aa. (At delivery) (2)Stopper bolt setting (3)Set the pump speed at bb.
----------
aa=900r/min bb=750r/min
----------
a=8deg+-5deg b=21deg+-5deg c=5deg+-5deg

Stop lever angle

Test data 101602-9900
N:Pump normal S:Stop the pump.
----------

----------
a=26.5deg+-5deg b=53deg+-5deg

0000001501 GOV FULL LOAD ADJUSTMENT

Test data 101602-9900
Title1:Full load stopper adjustment Title2:Governor set speed LABEL1:Distinguishing LABEL2:Pump speed (r/min) LABEL3:Ave. injection quantity (mm3/st) LABEL4:Max. var. bet. cyl. LABEL5:Remarks LABEL6:Distinguishing LABEL7:Governor set speed (r/min) LABEL8:Remarks (1)Adjustment conditions are the same as those for measuring injection quantity. (2)-
----------

----------
a1=A a2=B r1=750r/min r2=750r/min Q1=48.6+-1.6mm3/st Q2=45.2+-1.6mm3/st c1=+-2% c2=+-2% a3=18 a4=15 r3=900r/min r4=750r/min

Timing setting

Test data 101602-9900
(1)Pump vertical direction (2)Position of gear's standard threaded hole (position of gear mark 'H') at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=19deg
----------
a=(60deg)




Information:

1. Remove the bolt and lock that holds suction bell (1) to the oil pan plate. Remove two bolts (4) that hold the elbow to the oil pump.
Oil pump idler gear (2) can fall off the pump when the pump is removed. To prevent injury, always hold the gear on the pump when the pump is removed.
2. Remove the bolts and locks that hold the oil pump to the engine. Remove oil pump (3).3. Install idler gear (2) on oil pump (3). Put the oil pump in position on the engine as shown with idler gear (2) engaged with the crankshaft gear. Install the bolts and locks that hold the oil pump to the engine.4. Install bolts (4) that hold the elbow to the oil pump.5. Install the bolt and lock that hold suction bell (1) to the oil pan plate.End By:a. install oil panDisassemble Oil Pump
Start By:a. remove oil pump (3304) or remove oil pump (3306) 1. Remove idler gear (2). Remove the bearing from the idler gear with Tool (B).2. Remove suction bell (1).3. Remove the bolt and the washer from the oil pump drive gear. 4. Remove the drive gear from the shaft with Tool (A).5. Remove the key from the pump shaft.6. Remove bolts (3) from the pump body. 7. Remove body (8), two gears (7), the keys and spacer (4) from the pump.8. Remove two shafts (5) and the gears.9. Remove bolts (6), the cover and the pressure relief valve from the body. 10. Remove the bearings from the oil pump body assembly and the scavenge pump body assembly with Tool (B).Assemble Oil Pump
1. Install the bearings in the scavenge pump body assembly with Tool (A) and a press as follows:a. Put bearings (1) in position on the inside of the scavenge pump body assembly with the chamfer on the bearing toward the outside of the pump body. Install the bearing until it is 1.52 mm (.060 in) below the inside machined surface of the scavenge pump body assembly. Make sure the joints in the bearings are at an angle of 30° 15° from the center line through the bores in the scavenge pump body and toward the outlet passage of the pump. The outlet passage has a cavity between the bearing bores. 2. Install the bearings in oil pump body assembly with Tool (A) and a press as follows:a. Put bearings (2) in position on the inside of the oil pump body assembly with the chamfer on the bearings toward the outside of the pump body. Install the bearings until they are even with the outside of the pump body. Make sure the joints in the bearings are at an angle of 30° 15° from the centerline through the bearing bores and toward the outlet passage of the pump. The outlet passage has a cavity between the bearing bores.3. Check the condition of the relief valve. Check the condition and specifications for all the parts of the oil pump before

Have questions with 101602-9900?





Group cross 101602-9900 ZEXEL

Nissan-Diesel 

101602-9900  
9 400 614 989 
16712Z5507 
INJECTION-PUMP ASSEMBLY
FD6
 
1679095015 
INJECTION-PUMP ASSEMBLY
NE6T
9 400 614 990 
16712Z5508 
INJECTION-PUMP ASSEMBLY
FE605
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi-Heav 

F 019 Z10 828 
3436100091 
INJECTION-PUMP ASSEMBLY
S6K
 
3436100092 
INJECTION-PUMP ASSEMBLY
S6K
9 400 612 923 
3436100093 
INJECTION-PUMP ASSEMBLY
S6K
 
3436101050 
INJECTION-PUMP ASSEMBLY
S6K-T
 
3436101051 
INJECTION-PUMP ASSEMBLY
S6K-T
F 019 Z10 596 
3436101030 
INJECTION-PUMP ASSEMBLY
S6K-T
F 019 Z10 500 
3436101031 
INJECTION-PUMP ASSEMBLY
S6K-T
9 400 614 991 
3436101032 
INJECTION-PUMP ASSEMBLY
S6K-T

Nissan-Diesel 

9 400 614 992 
1679095016 
INJECTION-PUMP ASSEMBLY
NE6T

Mitsubishi-Heav 

 
3436101080 
INJECTION-PUMP ASSEMBLY
S6K
 
3436101081 
INJECTION-PUMP ASSEMBLY
S6K
9 400 614 993 
3436101082 
INJECTION-PUMP ASSEMBLY
S6K
9 400 610 163 
3436110020 
INJECTION-PUMP ASSEMBLY
S6K-T
 
3436110021 
INJECTION-PUMP ASSEMBLY
S6K-T
9 400 612 112 
3436110022 
INJECTION-PUMP ASSEMBLY
S6K-T
 
3436109010 
INJECTION-PUMP ASSEMBLY
S6K
9 400 614 994 
3436109011 
INJECTION-PUMP ASSEMBLY
S6K
9 400 614 994 
3436109012 
INJECTION-PUMP ASSEMBLY
S6K
Back to top