101602-8490 ZEXEL 9 400 611 589 BOSCH INJECTION-PUMP ASSEMBLY 9400611589 1016028490 1156032590


 

Information injection-pump assembly

BOSCH 9 400 611 589 9400611589
ZEXEL 101602-8490 1016028490
ISUZU 1156032590 1156032590
101602-8490 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 101602-8490 zexel genuine, new aftermarket engine parts with delivery

Service parts 101602-8490 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-8830
3. GOVERNOR 105419-2840
4. SUPPLY PUMP 105220-6240
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156638-9120
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105160-4170
11. Nozzle and Holder 1-15300-331-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105030-4361
14. NOZZLE 105025-0290
15. NOZZLE SET

Include in #1:

101602-8490 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 611 589 9400611589
ZEXEL 101602-8490 1016028490
ISUZU 1156032590 1156032590


Zexel num
Bosch num
Firm num
Name
101602-8490 
9 400 611 589 
1156032590  ISUZU
INJECTION-PUMP ASSEMBLY
6BG1-TQN K 14BF INJECTION PUMP ASSY PE6AD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.1
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   85.5 84 87
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   7.6+-0.5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   10.5 9.2 11.8
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   110 105 115
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101602-8490
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Main spring setting (6)Rack difference between N = N1 and N = N2
----------
K=14 N1=1000r/min N2=600r/min
----------

Speed control lever angle

Test data 101602-8490
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=20deg+-5deg

Stop lever angle

Test data 101602-8490
N:Pump normal S:Stop the pump.
----------

----------
a=2.5deg+-5deg b=46deg+-5deg

Timing setting

Test data 101602-8490
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=12deg
----------
a=(100deg)




Information:

Removal of Fuel System
To prevent dust from entering the fuel system, cover all openings in the injection pump, nozzle inlet connectors and injection pipes.
Removal of Fuel Injection Pump
Removal of fuel injection pump (1)
Removal of fuel injection pump (2)(1) Check the alignment marks stamped on the flange of the fuel injection pump and the pump mounting flange.(2) Remove the front cover from the engine.(3) Place alignment marked on the fuel injection pump gear and idler gear.(4) Unscrew the mounting bolts from the fuel injection pump flange, and remove the fuel injection pump together with the flange from the front plate. (a) After the fuel injection pump is removed, do not turn the engine.(b) When removing the pump gear, loosen the gear retaining nut while the pump is mounted on the engine.Disassembly, Inspection and Reassembly of Fuel System
Disassembly of Fuel Injection Nozzles
Inspection of Fuel Injection Nozzles
Inspection of fuel injection nozzle valve openingCheck each fuel injection nozzle for the following, and if defects are found, repair or replace the fuel injection nozzle.(1) Inspection of injection start pressure(a) Install each fuel injection nozzle on the nozzle tester, and move the handle up and down to release air.(b) Operate the handle of the tester at a rate of about 1 stroke per second, and read the indication on the pressure gage. The indication rises slowly, and the indicator oscillates during spraying. To obtain the injection start pressure value, read the indication when the indicator starts to oscillate.(c) If the injection start pressure deviates significantly from the standard value, disassemble the fuel injection nozzle, and make an adjustment by changing the washer thickness.
Replacement of fuel injection nozzle tip 0.1 mm [0.0039 in.] thickness of shims will change the injection pressure 0.98 Mpa (10 kgf/cm2 [142 psi]. The shims are available in 10 different thickness from 1.25 to 1.70 mm [0.0492 to 0.0669 in.] increment of 0.05 mm [0.0020 in.]
Never tap the tip of the nozzle tip when removing the nozzle tip.
(2) Inspection f fuel injection nozzle spray pattern
Inspection of spray pattern of fuel injection nozzle(a) When inspecting each fuel injection nozzle with the nozzle tester, also check the nozzle for clogs, spray pattern and leakage.(b) Make sure that the fuel is sprayed straight from the nozzle when the handle of the tester is operated at a rate of about 1 stroke per second.(3) Cleaning and replacement of faulty nozzles
Cleaning of fuel injection nozzle tip(a) Loosen the nozzle retaining nut, remove the nozzle tip, and clean the needle valve and body.
Never tap the tip of the nozzle tip when removing the nozzle tip.
(b) Use a fresh cleaning solution to clean the needle valve and body. after cleaning, assemble the needle valve and body in clean diesel fuel. The needle valve and body are precision finished. Handle them carefully, and do not change the combination of parts.(c) Tighten the nozzle retaining nut on the nozzle tip to the specified torque.(d) If the spray pattern is still not acceptable after adjustment and cleaning, replace the nozzle tip.

Have questions with 101602-8490?





Group cross 101602-8490 ZEXEL

Isuzu 

 
1156032350 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 626 
1156032290 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 627 
1156032320 
INJECTION-PUMP ASSEMBLY
6BG1-TQB
9 400 610 628 
1156032330 
INJECTION-PUMP ASSEMBLY
6BG1-TQB
9 400 612 528 
1156032331 
INJECTION-PUMP ASSEMBLY
6BG1-TQB
9 400 610 629 
1156032230 
INJECTION-PUMP ASSEMBLY
6BG1-TQA
9 400 612 529 
1156032231 
INJECTION-PUMP ASSEMBLY
6BG1-TQA
9 400 610 630 
1156032411 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 614 939 
1156032510 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156032470 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 613 118 
1156032471 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 610 631 
1156032440 
INJECTION-PUMP ASSEMBLY
6BG1
101602-8490  
9 400 611 589 
1156032590 
INJECTION-PUMP ASSEMBLY
6BG1-TQN
Back to top