101602-8441 ZEXEL 9 400 612 529 BOSCH INJECTION-PUMP ASSEMBLY 9400612529 1016028441 1156032231


 

Information injection-pump assembly

BOSCH 9 400 612 529 9400612529
ZEXEL 101602-8441 1016028441
ISUZU 1156032231 1156032231
101602-8441 INJECTION-PUMP ASSEMBLY
Rating:
83
Buy INJECTION-PUMP ASSEMBLY 101602-8441 zexel genuine, new aftermarket engine parts with delivery

Service parts 101602-8441 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101061-8830
3. GOVERNOR 105419-2641
4. SUPPLY PUMP 105220-6240
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156639-0320
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105160-4170
11. Nozzle and Holder 1-15300-331-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105030-4361
14. NOZZLE 105025-0290
15. NOZZLE SET

Include in #1:

101602-8441 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

Zexel num
Bosch num
Firm num
Name
101602-8441 
9 400 612 529 
1156032231  ISUZU
INJECTION-PUMP ASSEMBLY
6BG1-TQA K 14BF INJECTION PUMP ASSY PE6AD PE




Information:


Adjustment of valve clearanceFuel System Bleeding
(1) Loosen the air vent plug of the fuel filter. (approx. 1.5 turns)(2) Move the priming pump for the filter up and down.(3) When fuel flowing from the vent hole no longer contains air bubbles, tighten the air vent plug.
Fuel system bleedingInspection and Adjustment of No-Load Minimum (Low Idling) Speed and Maximum Speed
(a) The following adjustments were inspected and set for each engine on the test bench at the factory, and the set bolts are sealed. These settings should be checked and adjusted only at our designated service shop.(b) After the governor parts are adjusted, all external stoppers must be sealed in the same way as when adjustments were made at the factory.(c) Whether the seals are intact or not has important bearing on the validity of claims under warranty. Be sure to seal all the specified sections.(d) When inspecting or adjusting, be ready to operate the engine stop lever manually in case the engine overruns (engine operation at extremely high speed).
Prior to inspection and adjustment, conduct a warm-up operation until the coolant and oil temperatures rise above 70 °C [158 °F].(1) Starting the engine(a) Pull the speed control lever toward the HIGH SPEED side, and operate the starter switch.(b) The engine ignites when the rotation speed reaches approximately 150 min-1, and the engine speed rises. Operate the speed control lever to maintain the engine speed between 800 and 1000 min-1.(c) After the engine speed stabilizes, return the speed control lever to the low idling position.
Inspection and adjustment of no-load minimum (low idling) speed and maximum speed(2) Low idling setting (no-load minimum rotation speed setting)Hold the speed control lever at the position of no-load minimum rotation speed, then secure the lever in that position using the idling adjustment screw.
If there is speed range which causes dangerous torsional vibration, avoid setting the engine speed in that range.
(3) Governor setting (maximum rotation speed setting)(a) Keep the speed control lever at the position of the specified maximum rotation speed.(b) With the speed control lever held in that position, adjust and set the governor set bolt (maximum rotation speed set screw) to the specified rotation speed).Inspection of V-Belt Tension
(1) Press the V-belt at a midpoint between the alternator and crankshaft pulley to check the mount of belt deflection.
Inspection of V-belt tension(2) If the amount of belt deflection does not conform to the standard value, loosen the adjusting bolt and move the alternator to adjust the belt tension.Engine Break-in Operation
When the engine is overhauled, it should be mounted on a dynamometer and operated for break-in and inspection.Starting Up
(1) Before starting the engine, check the levels of coolant, engine oil and fuel, and bleed the fuel and cooling system.(2) With the fuel supply cut off, operate the starter and crank the engine for about 15 seconds to circulate engine oil.(3) Move the speed control lever slightly in the direction for increased fuel (do not move it to "full injection" position), then turn the starter switch key to the [START]

Have questions with 101602-8441?





Group cross 101602-8441 ZEXEL

Isuzu 

 
1156032350 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 626 
1156032290 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 627 
1156032320 
INJECTION-PUMP ASSEMBLY
6BG1-TQB
9 400 610 628 
1156032330 
INJECTION-PUMP ASSEMBLY
6BG1-TQB
9 400 612 528 
1156032331 
INJECTION-PUMP ASSEMBLY
6BG1-TQB
9 400 610 629 
1156032230 
INJECTION-PUMP ASSEMBLY
6BG1-TQA
101602-8441  
9 400 612 529 
1156032231 
INJECTION-PUMP ASSEMBLY
6BG1-TQA
9 400 610 630 
1156032411 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 614 939 
1156032510 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156032470 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 613 118 
1156032471 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 610 631 
1156032440 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 611 589 
1156032590 
INJECTION-PUMP ASSEMBLY
6BG1-TQN
Back to top