101602-8000 ZEXEL 9 400 614 917 BOSCH INJECTION-PUMP ASSEMBLY 9400614917 1016028000 1156030800


 

Information injection-pump assembly

BOSCH 9 400 614 917 9400614917
ZEXEL 101602-8000 1016028000
ISUZU 1156030800 1156030800
101602-8000 INJECTION-PUMP ASSEMBLY
Rating:
21
Buy INJECTION-PUMP ASSEMBLY 101602-8000 zexel genuine, new aftermarket engine parts with delivery

Service parts 101602-8000 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-8130
3. GOVERNOR 105410-5420
4. SUPPLY PUMP 105220-7260
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156639-3620
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4372
11. Nozzle and Holder 5-15300-103-2
12. Open Pre:MPa(Kqf/cm2) 14.7{150}
13. NOZZLE-HOLDER 105030-3391
14. NOZZLE 105015-3930
15. NOZZLE SET

Include in #1:

101602-8000 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101602-8000 
9 400 614 917 
1156030800  ISUZU
INJECTION-PUMP ASSEMBLY
6BD1 K 14BE INJECTION PUMP ASSY PE6A PE




Information:

GENERAL
Specifications
Components parts
Fuel System Component Parts(1) Injection pump(2) Adjustment shim(3) Injection pipe(4) Injection nozzle(5) Return pipe(6) Fuel filter(7) Fuel cutoff solenoidFUEL INJECTION PUMP
Construction
Injection Pump Component Parts(1) Union collar(2) Air vent screw(3) Delivery valve holder(4) Valve spring(5) Holder stopper(6) Housing(7) O-ring(8) Delivery valve(9) Gasket(10) Seat valve(11) Plunger barrel(12) Sleeve(13) Upper seat(14) Plunger spring(15) Plunger(16) Lower seat(17) Adjusting shim(18) Tappet roller(19) Pin(20) Control rack(21) Stop wire bracketInspecting the injection pump while it is mounted on the engine
Never attempt to disassemble the pump unless it is necessary.If the pump is assumed defective, it is recommended to replace the pump assembly. Removal
(1) Disconnect the fuel injection pipes.(2) Remove the tie-rod clip cover.(3) Remove the tie-rod clip and tie-rod.(4) Remove the injection pump assembly.
Removing Injection PumpDisassembly
(1) Remove the stopper plate.(2) Unscrew the delivery holder. Take out the delivery valve and valve spring.(3) Remove the tappet roller and stopper pin.(4) Remove the tappet, plunger spring, etc. CAUTION1. When replacing the plunger barrel, delivery valve, etc., do not loosen the adjusting screw and plate for each cylinder.2. When those parts have been replaced, it is necessary to measure fuel injection quantity by using the pump tester and cam box.3. All parts removed from the pump should be kept classified by cylinders and immersed in clean fuel.Inspection
Inspection of Injection PumpAssembly
(1) Insert the plunger barrel into the housing.(2) Install the delivery valve and valve spring. Temporarily tighten the holder.(3) Insert the control rack.(4) Insert the control pinion. Align the matchmark on the rack with that on the pinion.(5) Install the spring upper seat.(6) Insert the plunger spring.(7) Fit the lower seat to the plunger. Insert the plunger into the barrel side.(8) Depress the tappet roller assembly and install the stopper pin.(9) Tighten the delivery holder. Tightening torque : 3.5 - 3.9 kgm
Direction of Installation of PlungerInstallation
Install the injection pump assembly in the reverse order of removal. CAUTION* When installing the plunger barrel, engage the dowel pin on the housing side with the groove in the barrel.* Position the plunger so that the part-number stamp on its flanges faces the direction opposite to the rack side. (Engage the feed hole with the plunger lead.)* After installation, check for proper injection timing.INJECTION NOZZLE
Construction
Nozzle Holder Ass'y Component Parts(1) Body sub-assembly(2) Shim washer(3) Pressure spring(4) Pin(5) Distance piece(6) Nozzle assembly(7) Retaining nutRemoval
(1) Disconnect the injection pipe and fuel return pipe.(2) Remove the injection nozzle assembly from the cylinder head. CAUTION* Attach an identification-number tag to the removed injection nozzle.* Plug the openings, from which the pipes are disconnected and the nozzle is removed, to prevent intrusion of dust, water, and other foreign particles into the pipes and combustion chamber.Disassembly
If the removed nozzle assembly is assumed defective, disassemble the assembly and repair or replace the faulty parts.(1) Grip the nozzle holder body in a vise. Loosen the retaining nut. Never vise the retaining nut to prevent deformation.(2) Take out the shim washer, pressure spring, distance piece, and nozzle assembly. CAUTION* Scrape off carbon deposit with a wooden spatula. Keep the removed parts immersed

Have questions with 101602-8000?





Group cross 101602-8000 ZEXEL

Isuzu 

101602-8000  
9 400 614 917 
1156030800 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 610 610 
1156030810 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 918 
1156030820 
INJECTION-PUMP ASSEMBLY
6BB1
9 400 610 611 
1156030830 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 919 
1156030840 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 920 
1156030850 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 921 
 
INJECTION-PUMP ASSEMBLY
6BG1

Isuzu 

9 400 614 921 
1156030860 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 614 922 
1156030870 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156030880 
INJECTION-PUMP ASSEMBLY
6BD1
9 400 614 923 
 
INJECTION-PUMP ASSEMBLY
6BG1

Isuzu 

9 400 614 923 
1156030890 
INJECTION-PUMP ASSEMBLY
6BG1
Back to top