101602-7930 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1016027930 1156031410


 

Information injection-pump assembly

ZEXEL 101602-7930 1016027930
ISUZU 1156031410 1156031410
101602-7930 INJECTION-PUMP ASSEMBLY
Rating:
13
Buy INJECTION-PUMP ASSEMBLY 101602-7930 zexel genuine, new aftermarket engine parts with delivery

Service parts 101602-7930 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101060-6360
3. GOVERNOR 105419-2240
4. SUPPLY PUMP 105220-6300
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105661-3230
7. COUPLING PLATE 156635-1820
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6682
11. Nozzle and Holder 1-15300-291-2
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105030-4361
14. NOZZLE 105015-4740
15. NOZZLE SET

Include in #1:

101602-7930 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101602-7930 1016027930
ISUZU 1156031410 1156031410


Zexel num
Bosch num
Firm num
Name
101602-7930 
101602-7931 
 
1156031410  ISUZU
INJECTION-PUMP ASSEMBLY
6BG1 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.1
Pump speed r/min   800 800 800
Average injection quantity mm3/st.   57.5 56 59
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   7.1+-0.5
Pump speed r/min   375 375 375
Average injection quantity mm3/st.   8 6.7 9.3
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   80 75 85
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101602-7930
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Main spring setting
----------
K=16
----------

Speed control lever angle

Test data 101602-7930
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=7deg+-5deg b=13deg+-5deg

Stop lever angle

Test data 101602-7930
N:Pump normal S:Stop the pump.
----------

----------
a=46deg+-5deg b=52deg+-5deg

Timing setting

Test data 101602-7930
(1)Pump vertical direction (2)Position of flywheel's threaded hole at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=14deg
----------
a=(15deg)




Information:

Water Pump
Disassembly of Water Pump
Inspection of Water Pump
If the inspection of the impeller and shaft finds abnormal noise or rough rotation, replace the assembly.
Inspection of impeller and shaft rotation conditionThermostat
Disassembly of Thermostat
Inspection of Thermostat
To test the thermostat operation, immerse the thermostat in a container filled with water, and heat the water while measuring the water temperature. Record the temperature at which the valve starts to open and the temperature at which the valve lift becomes 8 mm [0.3 in.] or more. (a) Stir the water in the container to ensure uniform temperature distribution.(b) When installing the thermostat, be sure to check the valve opening temperature indication stamped on the upper face of the thermostat mounting flange.
Inspection of thermostatThermo Switch
Inspection of Thermo Switch
Immerse the temperature sensor in oil, and measure the resistance while increasing the oil temperature. If the temperature measurement exceeds the standard value significantly, replace the thermo switch.
Since the inspection requires heating of oil to high temperatures, be careful not to get burns or start a fire.
Inspection of thermo switch

Have questions with 101602-7930?





Group cross 101602-7930 ZEXEL

Isuzu 

 
1156031350 
INJECTION-PUMP ASSEMBLY
6BG1-TQJ
9 400 610 602 
1156031351 
INJECTION-PUMP ASSEMBLY
6BG1-TQJ
9 400 610 603 
1156031380 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 610 604 
1156031520 
INJECTION-PUMP ASSEMBLY
6BG1
101602-7930  

101602-7931 
 
1156031410 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 614 916 
1156031411 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 605 
1156031450 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 606 
1156031420 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 607 
1156030660 
INJECTION-PUMP ASSEMBLY
6BD1-T
9 400 610 608 
1156031440 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 609 
1156030780 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156030790 
INJECTION-PUMP ASSEMBLY
6BD1
Back to top