Service parts 101602-7900 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101062-8030
3. GOVERNOR 105411-1810
4. SUPPLY PUMP 105220-6240
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156639-0320
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105160-4170
11. Nozzle and Holder 1-15300-331-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105030-4361
14. NOZZLE 105025-0290
15. NOZZLE SET

Include in #1:

101602-7900 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101602-7900 1016027900
ISUZU 1156031350 1156031350


Zexel num
Bosch num
Firm num
Name
101602-7900 
101602-7901 
 
1156031350  ISUZU
INJECTION-PUMP ASSEMBLY
6BG1-TQJ * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.9
Pump speed r/min   1150 1150 1150
Average injection quantity mm3/st.   94.5 93 96
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Boost pressure kPa   61.3 61.3
Boost pressure mmHg   460 460
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.2+-0.5
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   11.5 10.2 12.8
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_03
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   125 120 130
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Rack limit   *
Boost compensator adjustment
Pump speed r/min   600 600 600
Rack position   R1-0.6
Boost pressure kPa   24 21.3 26.7
Boost pressure mmHg   180 160 200
Boost compensator adjustment_02
Pump speed r/min   600 600 600
Rack position   R1(8.9)
Boost pressure kPa   48 48 48
Boost pressure mmHg   360 360 360

Test data Ex:

Governor adjustment

Test data 101602-7900
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Boost compensator stroke: BCL (5)Set idle sub-spring (6)Main spring setting
----------
K=12 BCL=0.6+-0.1mm
----------

Speed control lever angle

Test data 101602-7900
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=(8deg)+-5deg b=(24deg)+-5deg

Stop lever angle

Test data 101602-7900
N:Pump normal S:Stop the pump. (1)Pump speed aa and rack position bb (to be sealed at delivery)
----------
aa=0r/min bb=1-0.5mm
----------
a=32deg+-5deg b=(55deg)

Timing setting

Test data 101602-7900
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=12deg
----------
a=(100deg)




Information:

Installation of Oil Seal Case
(1) Coat the outside surface of the oil seal with engine oil.(2) Install the oil seal on the oil seal case.(3) Coat the lip of the oil seal with engine oil.(4) Install the O-ring into the oil seal case, and install the oil seal case on the flywheel housing. The oil seal case must be installed with the "Q" mark facing up.(5) Secure the oil seal case with the bolts.
Installation of oil seal caseInstallation of Flywheel
(1) Install the flywheel to the crankshaft by aligning the hole with the dowel pin on the back-end of the crankshaft.(2) Place the washer and tighten the four bolts to the specified torque.
Installation of flywheelMeasurement of Flywheel Axial and Radial Runouts
Measure the flywheel runout with the flywheel installed to the crankshaft. If the standard value is exceeded, check the bolts for tightening condition and the mounting face for adhesion of foreign particles.
Measurement of face runout and circular runoutCylinder Head and Valve Mechanisms
Installation of Valve Stem Seals
(1) Apply engine oil to the valve stem, and insert it into the valve guide.(2) Place a new stem seal on the valve guide.(3) Using the stem seal installer, install the stem seal to the valve guide, making use of the valve stem as a guide.
Installation of valve stem sealInstallation of Valves and Valve Springs
(1) Place the valve spring and retainer on the valve guide, and install the valve cotter using the valve spring pusher.
Excessive compression of the valve spring can cause the retainer to contact the stem seal and damage the seal.
Installation of valve and valve spring(2) Using a soft-faced hammer, tap the top of the valve stem several times to make sure that the spring and valve cotter are securely installed.
Confirmation of secure valve cotter installationInstallation of Cylinder Head Gasket
(1) Make sure that the top face of the crankcase and piston upper surfaces are clean and free of dust.(2) Place a new gasket of the crankcase, making sure that the dowel pins on the top face of the crankcase enter the holes in the gasket.
Do not use a liquid gasket.
Installation of cylinder head gasketInstallation of Cylinder Head
Place the cylinder head on the head gasket, making sure that the dowel pins on the top face of the crankcase enters the holes in the cylinder head.
Installation of cylinder headTightening of Cylinder Head Bolts
Tighten the cylinder head bolts, following the tightening sequence shown in the diagram two or three times before reaching the specified torque.
Cylinder head bolt tightening sequenceAssembly of Rocker Arm and Rocker Shaft Assembly
When installing the rocker arms, make sure that the shaft assembly marks face the front of the engine, as shown in the diagram. After the assembly, make sure that the rocker arms move smoothly.
Assembly of rocker shaft assemblyInstallation of Pushrods
(1) Insert the pushrods in the cylinder head through the pushrod holes.(2) Make sure that the ball end of each pushrod rests securely on the curved surface of the tappet.Installation of Rocker Shaft Assembly
(1) Install the valve caps.(2) Tighten the rocker

Have questions with 101602-7900?





Group cross 101602-7900 ZEXEL

Isuzu 

101602-7900  

101602-7901 
 
1156031350 
INJECTION-PUMP ASSEMBLY
6BG1-TQJ
9 400 610 602 
1156031351 
INJECTION-PUMP ASSEMBLY
6BG1-TQJ
9 400 610 603 
1156031380 
INJECTION-PUMP ASSEMBLY
6BG1-T
9 400 610 604 
1156031520 
INJECTION-PUMP ASSEMBLY
6BG1
 
1156031410 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 614 916 
1156031411 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 605 
1156031450 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 606 
1156031420 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 607 
1156030660 
INJECTION-PUMP ASSEMBLY
6BD1-T
9 400 610 608 
1156031440 
INJECTION-PUMP ASSEMBLY
6BG1
9 400 610 609 
1156030780 
INJECTION-PUMP ASSEMBLY
6BD1
 
1156030790 
INJECTION-PUMP ASSEMBLY
6BD1